319 West 35 Street

Manhattan, NY 10001BBL 1-00759-0029Map

Owner of record: H 317-319 LLC

319 West 35 Street is a hotel built in 1900 in Manhattan, 10001. It has 140 residential units across 25 floors. The owner of record is H 317-319 LLC. HPD has recorded 95 housing violations here, most recently on April 29, 2026. 36 of the 50 most recent violations are still open.

HPD violations
95
DOB violations
37
ECB violations
85
HPD complaints
207

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 95

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 22, 2024

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2024

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 15, 2023

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 15, 2023

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 2, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 16, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 16, 2022

    Open — Nov sent out
Show 40 more ↓
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 16, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 16, 2022

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 1, 2021

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 1, 2021

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 25, 2019

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 25, 2019

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 10, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 6, 2017

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 6, 2017

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 26, 2016

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 26, 2016

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 2, 2015

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 2, 2015

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of a furniture & household items obstructed the way to fire escape window at east in the 4th room from north located at apt 2w, 1st story, 1st apartment from south at west

    Jun 27, 2011 · Apt 2W

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective & unkey fire retardent ceiling approx. 7 sq.ft. at cellar

    Jun 20, 2011

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 4rw, 4th story, 2nd apartment from south at west

    Jun 20, 2011 · Apt 4RW

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 4rw, 4th story, 2nd apartment from south at west

    Jun 20, 2011 · Apt 4RW

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1re, 1st story, 2nd apartment from north at east

    Jun 20, 2011 · Apt 1RE

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 1re, 1st story, 2nd apartment from north at east

    Jun 20, 2011 · Apt 1RE

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2e, 2nd story, 1st apartment from north at east

    Apr 13, 2011 · Apt 2E

    Open — Nov sent out
  • C

    Properly repair the broken or defective street entrance door lock , 1st story

    Mar 23, 2011

    Open — Not complied with
  • B

    Properly repair the broken or defective upper freezer at refrigerator in the kitchen located at apt 3re, 3rd story, 1st apartment from north at east

    Jan 12, 2011 · Apt 3RE

    Open — First no access to re- inspect violation
  • B

    Provide mechanical ventilation in the 2nd bathroom from north located at apt 2e, 1st story, 1st apartment from north at east

    Nov 3, 2010 · Apt 2E

    Open — Not complied with
  • B

    Provide mechanical ventilation in the 1st bathroom from north at west located at apt 2e, 1st story, 1st apartment from north at east

    Nov 3, 2010 · Apt 2E

    Open — Not complied with
  • A

    Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the kitchen located at apt 2e, 2nd story, 1st apartment from north at east

    Oct 19, 2010 · Apt 2E

    Open — Not complied with
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 2nd sty balcony ,front south at fire escape

    Sep 16, 2010

    Open — Not complied with
  • B

    Code: arrange and make self-closing the doors for bldg. entrance from vestibule to at public hall, 1st story

    Sep 16, 2010

    Open — Not complied with
  • B

    Properly repair with similar material the broken or defective fire retarding material at west wall at public hall, 1st story

    Sep 16, 2010

    Open — Not complied with
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west

    Aug 27, 2010 · Apt 2W

    Open — Not complied with
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west

    Aug 27, 2010 · Apt 2W

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Aug 27, 2010 · Apt 2W

    Open — Not complied with
  • B

    Replace with new the broken or defective door in the bathroom located at apt 2w, 2nd story, 1st apartment from south at west

    Aug 27, 2010 · Apt 2W

    Open — Not complied with
  • B

    Replace with new the broken or defective door in the entrance located at apt 2w, 2nd story, 1st apartment from south at west

    Aug 27, 2010 · Apt 2W

    Open — Not complied with
  • B

    Properly repair the broken or defective lock at entrance door to bldg.

    Jul 14, 2010

    Open — Not complied with
  • B

    Code: arrange and make self-closing the doors at entrance from vestibule to lobby at public hall, 1st story

    Jan 26, 2010

    Open — Not complied with
  • C

    Abate the nuisance consisting of rodents rats at rear yard north side of building

    Sep 2, 2009

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west

    Sep 2, 2009 · Apt 2W

    Open — Not complied with
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage at rear yard at north

    Aug 7, 2009

    Open — Not complied with

DOB building violations · 37

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 11, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 11, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 11, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 11, 2024

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Nov 27, 2024

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Nov 27, 2024

    Dob violation - active
  • Construction other optional

    Borough commissioner stop work order application #123851796due to site safety manager withdrawal. superstructure is erected, however, no access to interior due to closed site and i'm unable to determine percentage completed. stop all work under job # referenced and make site safe.

    Jul 24, 2024

    Dob violation - active
  • Construction other optional

    Stop all work immediately and make the site safe. kindly contact the borough commissioner's office at (212) 393-2615 as soon as possible with appropriate information in response to this letter.

    Jun 12, 2024

    Dob violation - active
  • Construction other optional

    Borough comissioner office intent to revoke approvals and permit stop work immediately application #123851796

    Jun 12, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 12, 2024

    Dob violation - active
Show 27 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 3, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 15, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Immediate emergency anythingoptional

    Provide 90 linear feet of sidewalk shed at exposure#1(west 35th street ) to protect the public, property and people

    Jun 16, 2022

    Dob violation - dismissed
  • Construction other optional

    Borough commissioner has issued a stop work order under application #123851796, due to intent to revoke approval(s) and permit(s). unable to determine % of work completed. order(s) to stop all work immediately and make the site safe.

    Apr 9, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 31, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 31, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 31, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 16, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Construction other optional

    Ftm:5s+c resid bldg indep wall@exp2&party wall@exp4 25x72 on int lot 25x100 orig fl&roof frmg had been repl with new dressed lumber joist pocket not grouted&joist held in place loose msnry&woodwedges windows@ exp1&3remove&ros open&unsealed remedy:owner repair bldg u/pmt hire nys lic pe eval ent bldg file plns by 2/15/19 bgn wrk 3/1/19 compwrk9/1/19

    Dec 28, 2018

    Dob violation - dismissed
  • Construction other optional

    Ftm:5s+c resid bldg with indep walls@exp2&4 25x100 throughout bldg fl/roof frmg was rotted all floor roof frmg visibly sagging@middle of bldg temp shor present@all floors windows@exp1&3 removed&ros left open and unsealed remedy:onwer repair bldg u/pmt hire nys lic pe eval ent bldg file plans by 2/15/19 begin wrk by 3/1/19 compl wrk by 9/1/19

    Dec 28, 2018

    Dob violation - dismissed
  • Construction other optional

    Work performed without permit temporary shoring was observed at all floors no application or permits on file for temp shoring.owner to retain nys lic pe to evaluate shoring and file work after application owner to obtain permit and perform any repairs per engineer under perm complete all work by 2/15/19

    Dec 28, 2018

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    Work performed without permit temporary shoring was observed at all floors no application or permits on file for temp shoring owner to retain nys lic pe to evaluate shoring and file work after application owner to obtain permit and perform any repairs per engineer under perm complete all work by 2/15/19

    Dec 28, 2018

    Vw*-violation - work w/o permit dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Boiler boiler optional

    B-boiler boiler optional

    Dec 26, 1995

    Vp*-violation unserved ecb- dismissed

ECB violations · 85

  • Class - 2

    General contractor failed to file certificate of correction with the dob. no corrective measures on record for violation# 039523354 issued 11.13.2023...

    Sep 18, 2026 · Penalty $1,250

    Active
  • Class - 2

    At the time of inspection, the 25-story building site was closed with no construction activity observed. a review of department records found a failure to file certificate of correction with department of build

    Jul 23, 2026 · Penalty $1,280

    Active
  • Class - 2

    Failure to file certificate of correction with the department of buildings. no corrective measures on record for violation #039523354 issued on 11.13.2023. file a certificate of correction

    May 27, 2026

    Resolve
  • Class - 2

    At the time of inspection closed site no access i observed gc#607094 fail to comply with the commissioner's order to file a certificate of correction for violation#039523354ncomply with commissioner order

    Mar 17, 2026 · Penalty $1,250

    Active
  • Class - 2

    Temporary construction equipment onsite;expired permit.as noted at thetime of inspection fence permit was expired.rem:renew permit.

    Feb 9, 2026 · Penalty $1,280

    Active
  • Class - 1

    I observed stone slab materials stored on edge, not flat on the street, without code compliant barricades creating a struck by or caught in between crush hazard in the event of a vehicular accident or public ta

    Feb 3, 2026 · Penalty $2,500

    Active
  • Class - 2

    I observed the sidewalk shed missing mudsills as required by code creating a corrosion and dislodgement hazard. maintain as required by code bc3307.1.maintain as required by code.

    Feb 3, 2026 · Penalty $2,400

    Active
  • Class - 2

    Gc #607094 failed to comply with the commissioner's order by not filing a certificate of correction for violation #039523354n.

    Jan 20, 2026

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. at time of inspection,contractor failed to file a certificate of correction for violation #3

    Nov 24, 2025 · Penalty $6,250

    Active
  • Class - 1

    At time of inspection i noticed work contrary to approved site safety plan, i observed temporary egress created and was set up from the building leading to adjacent building at exposure# 3 rear yard, which give

    Oct 3, 2024 · Penalty $12,500

    Active
Show 40 more ↓
  • Class - 1

    Inspection reveals workers on the roof and some other part of the building doing construction activities, installing rear exterior panel, working against the allowed scope of work required as per rescind order

    Oct 3, 2024 · Penalty $25,000

    Active
  • Class - 2

    E.c.b violation issued for failure to post permit # m00350629-i1-sh for sidewalk shed which is expires on 10/26/24 and fence permit # m00219786-i1-fn expires on 8/24/24,observed at time of inspection are not po

    Aug 2, 2024 · Penalty $1,500

    Active
  • Class - 2

    Respondent failed to correct the violating condition and file for a certificate of correction pursuant to ac 28-204.2 for violation no. 39528424m issued dated 05/09/2024. at time of inspection, i observed inact

    Jul 5, 2024 · Penalty $640

    Resolve
  • Class - 2

    At the time of the inspection for the job site, nb 25 stories building, i observed a sidewalk shed in place contrary to the revised approval drawing/amendments, date 04/20/2023, showed the drawing- eq 100.01-

    Jun 7, 2024 · Penalty $1,250

    Active
  • Class - 1

    Upon inspection i observed inadequate housekeeping on several floors(cellar,1, 2, 3, 4, 6, 8, 9 & roof) creating hazardous & dangerous conditions. piles of trash/debris, wood, material, combustible containers s

    May 9, 2024 · Penalty $2,500

    Active
  • Class - 1

    Upon inspection of an active 25 story nb construction site i observed an inadequate guard rail system installed at exposure 3 5th floor-24th floor. (used drywall for guardrail system) inadequate guard rail syst

    May 9, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    Upon inspection of an active 25 story nb jobsite and review of approved site safety plan it was determined fence and street protection was installed contrary to ssp. jersey barriers should be filled with water

    May 9, 2024 · Penalty $1,250

    Active
  • Class - 2

    Upon inspection of an active 25 story nb construction site i observed a electric hoist system installed on the 15th floor in a shaft area. upon request to see manufacturers specification for the installed hoist

    May 9, 2024 · Penalty $1,250

    Active
  • Class - 2

    Upon inspection of an active 25 story nb construction site i observed supported scaffold installed approx. 66ft high. after review of approved scaffold drawings it was determined the scaffold installed had over

    May 9, 2024 · Penalty $625

    Active
  • Class - 1

    Upon inspection of an active 25 story nb construction site i observed a sidewalk shed installed contrary to approved drawings at exposure 1. plexiglass panels used on parapet not on drawings or code. 8ft open s

    Apr 12, 2024 · Penalty $12,500

    Active
  • Class - 2

    Upon inspection, i observed sidewalk shed and construction fence at exposure 1. construction fence does not have project information panel mandated by bc 3301.9.1.1 through bc 3301.9.1.6, comply with code; comp

    Mar 21, 2024

    Resolve
  • Class - 2

    Upon inspection of shed, no parapet information panel provided. bc 3301.9.2.2 requires sidewalk shed parapet information panels be posted on parapet that runs along the long axis of shed. missing information pa

    Mar 21, 2024

    Resolve
  • Class - 2

    At time of inspection observed inadequate housekeeping on various floor with construction materials create a tripping hazard also could create a rodent infestation. ..

    Feb 16, 2024 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to comply with code 28-103.21.1 reporting. permitholder failed to report incident to the department within allowable time by code section after such incident occurred on 11/1/2023 subject to permitting

    Dec 19, 2023 · Penalty $12,500

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requriements. ongoing work in progress under appl. #123851796, violation issued 9/11/23 for failure to maintain housekeeping at 1st floor and basement, 2nd

    Nov 13, 2023 · Penalty $25,000

    Active
  • Class - 1

    Permitholder failed to include required information contrary with code *3301.11.5 records section "3" the name, title and company affiliation of the qualified person who conducted such orientation, along with s

    Nov 1, 2023 · Penalty $5,000

    Resolve
  • Class - 1

    At time of inspection of a 25 storeys new building i observed poor housekeeping on the first floor and the basement , observed loads of construction debris and waste pile up, combustible materials and section o

    Sep 11, 2023 · Penalty $2,530

    Resolve
  • Class - 1

    At inspections, it was observed: guardrails system at the elevator shafts on various floors was not in compliance with code - missing toe boards with loose nettings or no netting at all, exposing personnel to

    Aug 23, 2023 · Penalty $5,000

    Resolve
  • Class - 2

    At inspection, it was observed: supported scaffold at exposure-1 installed on rebar grid between floors, missing cross braces at multiple levels below and above setbacks and not fully enclosing exposure-1 contr

    Aug 23, 2023

    Resolve
  • Class - 2

    Sheds, shanties, offices when indoor must be fire retardant if more than 120 sf: at inspections shanties that were approximately 192 square feet were observed on 4th and 5th floors and were made with plywood th

    Aug 23, 2023

    Resolve
  • Class - 2

    Inspection. structures, temporary construction installations, materials, operations and equipment shall be inspected as required by this code and records of such inspections shall be maintained as required by t

    Aug 23, 2023

    Resolve
  • Class - 2

    At inspection it was observed: inadequate housekeeping on various floor with construction materials and debris that are combustible and not contained on various floors that may lead to or aid fire outbreak, blo

    Aug 23, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Contrary to approved plans (double wood planks never installed) bc 28-105.12.2 , planks not tied down bc 3314.5.5, accumulated debri's left on scaffold bc 3314.4.4.5, missing pins bc 3314.13.2, untruthful dail

    Apr 6, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Observed excessive debri's scattered throughout site on multiple floors at various locations, including platforms of the supported scaffold. also observed that the contractor allowed the accumulation & storage

    Apr 6, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    1rcny3310-02 concrete safety manager failed to perform duties per code.as noted:atoi,observed concrete shores&reshores damaged,rusted,unspecified in drawings,formwork in hazard condition affecting workers/publi

    Dec 7, 2022 · Penalty $2,530

    Resolve
  • Class - 2

    28-103.8 failure to maintain embedded safety straps installation inspection logbook onsite.as noted:atoi on active construction site.w/working deck@fl17of25stys total.i observed concrete embedded safety straps

    Dec 7, 2022 · Penalty $1,280

    Resolve
  • Class - 2

    28-105.5 form filed w/dob dont have require signatures.as noted:atoi on active construction site.observed concrete placed to fl16 slab.tr3 concrete design mix filed w/dob line7,bldg owner's statement&signature

    Dec 7, 2022 · Penalty $1,280

    Resolve
  • Class - 1

    Bc3305.3.3.1 failure to designate formwork inspector&provide formwork inspections as required by code.as noted:atoi@active construction sitew/working deck@fl17of25stys total.upon request for formwork inspection

    Dec 7, 2022 · Penalty $2,530

    Resolve
  • Class - 1

    Bc3305.3.6.1.2 failure to secure reshores in proximity to unenclosed perimeters.as noted:atoi on active construction site w/working deck@fl17of25stys total,observed@fl13,exp1,unsecure shoring w/<10' of unenclos

    Dec 7, 2022 · Penalty $2,530

    Resolve
  • Class - 1

    Work doesnt conform to approved const docs &or approved amendments.as noted:atoi@active construction site w/working deck@fl17of25stys total,observed shoring&reshoring posts installed which are unspecified on dr

    Dec 7, 2022 · Penalty $2,530

    Resolve
  • Class - 1

    At time of inspection of a 25 story new building, upon review of the departmental records for the primary site safety manager, the site safety manger on site is not designated with the department of buildings.

    Oct 26, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Time of inspection observed large amounts of accumulated construction debris through out the lower levels, water collecting on every level, storage of combustible materials diesel cans and oxygen tanks, torpedo

    Oct 25, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    At time of inspection, of a 25 story proposed new building, while working on the sidewalk putting pedestrians into the street, observed no transition ramps from sidewalk to the street for the pedestrians to mov

    Oct 25, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Time of inspection of a 25 story new building, observed no horizontal netting at exposure #1 and 3, materials being stored and form work in place at 12th , 13th and 14th levels, with no safety horizontal netti

    Oct 25, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Time of inspection of a proposed 25 story new building, observed the adjacent buildings 322 and 315 west 35th street, with no roof protection and exposure # 2 and # 4, install and maintain roof protection for a

    Oct 25, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Time of inspection, of a 25 story new building, observed a standpipe in staircase "a" at the eleventh level, upon request to view the hydrostatic test results to show the standpipe is with in compliance none wa

    Oct 25, 2022 · Penalty $5,000

    Resolve
  • Class - 2

    At the time of inspection of 25 story building observed, construction fence erected in place , upon review on bis and dob now, the research revealed that the fence permit had expired sinc 10-28-2021 and was n

    Jun 15, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    At the time of inspection of 25 story building observed, at exposure 1 exterior work exposed to the public and all exterior work has not been done , reshore at all floors , loose brick at exterior walls and the

    Jun 15, 2022 · Penalty $10,000

    Resolve
  • Class - 2

    Temporary construction equipment on site. expired construction fence permit & sidewalk shed permit. as noted: at time of inspection of inspection for an inactive construction site observed. construction fence

    Dec 21, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Work without a permit. existing 5 story facade removed with no demo permit, drawings or sequencing for demolition available onsite at time of inspection. noted ongoing masonry demo taking place on 2nd and 3rd f

    Mar 4, 2021 · Penalty $1,250

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Sep 21, 2015 · Apt 2RE

    Close
  • Water leak

    Slow leak

    Jul 4, 2015 · Apt 2RE

    Close
  • Heating

    Heat related

    Oct 9, 2012 · Apt 2W

    Close
  • Heating

    Heat related

    Dec 27, 2011 · Apt 2FE

    Close
  • Heating

    Heat related

    Dec 27, 2011 · Apt 4RW

    Close
  • Heating

    Heat related

    Nov 23, 2011 · Apt 3E

    Close
  • Heating

    Heat related

    Oct 31, 2011 · Apt 2W

    Close
  • Heating

    Heat related

    Mar 24, 2011 · Apt BLDG

    Close
  • Heating

    Heat related

    Mar 19, 2011 · Apt BLDG

    Close
  • Heating

    Heat related

    Mar 19, 2011 · Apt 2RE

    Close
Show 40 more ↓
  • Heating

    Heat related

    Jan 19, 2011 · Apt 1RW

    Close
  • Heating

    Heat related

    Jan 19, 2011 · Apt 4RW

    Close
  • Plumbing

    Water supply

    Jan 19, 2011 · Apt 3RE

    Close
  • Heating

    Heat related

    Jan 19, 2011 · Apt 4RW

    Close
  • Heating

    Heat related

    Jan 19, 2011 · Apt NA

    Close
  • Heating

    Heat related

    Jan 18, 2011 · Apt 5W

    Close
  • Appliance

    Refrigerator

    Jan 5, 2011 · Apt 3RE

    Close
  • Heating

    Heat related

    Dec 25, 2010 · Apt BLDG

    Close
  • Heating

    Heat related

    Dec 12, 2010 · Apt BLDG

    Close
  • Heating

    Heat related

    Dec 11, 2010 · Apt 1RW

    Close
  • Heating

    Heat related

    Dec 11, 2010 · Apt 2FE

    Close
  • Heating

    Heat related

    Dec 7, 2010 · Apt 4RW

    Close
  • Heating

    Heat related

    Dec 6, 2010 · Apt 4RW

    Close
  • Heating

    Heat related

    Nov 2, 2010 · Apt BLDG

    Close
  • Heating

    Heat related

    Nov 2, 2010 · Apt BLDG

    Close
  • Heating

    Heat related

    Nov 2, 2010 · Apt 1RW

    Close
  • Heating

    Heat-plant

    Nov 2, 2010 · Apt 4FW

    Close
  • Heating

    Heat related

    Nov 2, 2010 · Apt 4FW

    Close
  • Appliance

    Refrigerator

    Nov 1, 2010 · Apt 3RE

    Close
  • Heating

    Heat related

    Nov 1, 2010 · Apt 3RE

    Close
  • Heating

    Heat related

    Oct 31, 2010 · Apt 4E

    Close
  • Heating

    Heat related

    Oct 31, 2010 · Apt BLDG

    Close
  • Heating

    Heat related

    Oct 30, 2010 · Apt 3RE

    Close
  • Heating

    Heat related

    Oct 30, 2010 · Apt 3RE

    Close
  • Appliance

    Refrigerator

    Oct 30, 2010 · Apt 3RE

    Close
  • Heating

    Heat related

    Oct 30, 2010 · Apt 3RE

    Close
  • Paint/plaster

    Wall

    Oct 29, 2010 · Apt 2E

    Close
  • Paint/plaster

    Wall

    Oct 29, 2010 · Apt 2E

    Close
  • Paint/plaster

    Ceiling

    Oct 29, 2010 · Apt 2E

    Close
  • Plumbing

    Bathtub/shower

    Oct 29, 2010 · Apt 2E

    Close
  • Plumbing

    Toilet

    Oct 29, 2010 · Apt 2E

    Close
  • General

    Windows

    Oct 29, 2010 · Apt 2E

    Close
  • General

    Mold

    Oct 29, 2010 · Apt 2E

    Close
  • Paint/plaster

    Ceiling

    Oct 29, 2010 · Apt 2E

    Close
  • Plumbing

    Basin/sink

    Oct 29, 2010 · Apt 2E

    Close
  • Heating

    Heat related

    Oct 26, 2010 · Apt 3RE

    Close
  • Appliance

    Refrigerator

    Oct 26, 2010 · Apt 3RE

    Close
  • Heating

    Heat related

    Oct 24, 2010 · Apt BLDG

    Close
  • Heating

    Heat related

    Oct 24, 2010 · Apt 3RE

    Close
  • Appliance

    Refrigerator

    Oct 23, 2010 · Apt 3RE

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H1)
Year built
1900
Floors
25
Residential units
140
Building area
117,188 ft²
Lot area
4,937 ft²
Zoning
C6-4M
Community board
104
Council district
3
Block / lot
759 / 29
Assessed value
$9,962,100
Landmark / historic district
No

HPD registration #125655, last renewed Jan 30, 2023.

Questions about 319 West 35 Street

Who owns 319 West 35 Street?

The owner of record in NYC Department of City Planning PLUTO data is H 317-319 LLC.

Does 319 West 35 Street have violations?

Yes. NYC HPD has recorded 95 housing violations at this property.

Is 319 West 35 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 319 West 35 Street built?

City records list 1900 as the year it was built.

How many apartments are in 319 West 35 Street?

It has 140 residential units and 141 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.