335 West 35 Street is an elevator apartment building built in 1927 in Manhattan, 10001. It has 66 residential units across 12 floors. The owner of record is Neo Image Enterprises, LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
137
ECB violations
132
HPD complaints
1

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 137

  • Immediate emergency anythingoptional

    Repair/replace existing 115'linear feet of sidewalk shed and const fnc @ exposure #1-south (west 35th street) including all out of plumbing & straight.provide proper connection between vertical posts & beams c ations provide spacing of junior beams in accordance with original she 2'-0 oc.max).replace all defected mudsills.replace defected plywood+++

    May 21, 2026

    Dob violation - dismissed
  • Construction other optional

    Ewo:observed mult. locs of sidewalk shed steel posts out of plumb, dis locations of steel beame under shed roof,rotten mudsills,damaged shed parapet walls & damaged/loose construction fence plywood panel causing obstruction to ped passageway.remedy:owner to immed repair and/or repl damaged sidew shed steel posts,beams,mudsills,parapet,fence & lights

    May 16, 2026

    Dob violation - active
  • Construction other optional

    Failure to maintain building exterior walls & appurtances in code compliant manner. at time of inspection observed unfinished exterior facade works, exposed masonry bricks,missing brks,uninstalled windows openings & loose debrise netting on suported scaffoldings causing fall debris hazard cond.remedy:owner to repair/replace & comply to code

    May 14, 2026

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2024

    Dob violation - active
  • Construction other optional

    Borough comissiner stop work order application #123174457 due to contracro withdrawal.

    Oct 25, 2024

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 external hgh pressure inspection

    Sep 23, 2024

    Dob violation - active
Show 40 more ↓
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 internal hgh pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2024

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2024

    Dob violation - active
  • Construction other optional

    Borough commissioner stop work order application #121507208 due to contractor withdrawal

    May 1, 2024

    Dob violation - active
  • Construction other optional

    The borough commissioner has issued a stop work order to application #121507208 due to site saftey manager withdrawal. stop all work and make site safe.

    Jan 12, 2024

    Dob violation - active
  • Construction other optional

    The dept. of buildings orders that you stop all work under permits issued in connection with application #121507208. the site safety manager of record has informed the department that she or he has withdrawn from the project.

    Aug 23, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 external hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 external hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 internal high pressure inspection

    Apr 25, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 external high pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 16, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - active
  • Construction other optional

    Dob summons issued for structure rendered non compliant due to motor vehicle impacting sidewalk shed at exposure 1 damaging 1 support beam

    Dec 20, 2021

    Dob violation - active
  • Residential elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Dec 17, 2021

    Dob violation - active
  • Residential elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Dec 17, 2021

    Dob violation - active
  • Residential elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Dec 17, 2021

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Dec 16, 2021

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Jun 11, 2021

    Vp*-violation unserved ecb- dismissed

ECB violations · 132

  • Class - 1

    Failure to comply with bc3314.8 - 3314.9.4. observed supported scaffold with lose and unsecured debris netting on several levels were not complying with the required safety standards, creating an immediate haza

    Sep 4, 2026 · Penalty $10,000

    Active
  • Class - 2

    Failure to comply with bc 3307.6.5.6 sharp edges, sidewalk shed vertical elements have shape edges in several locations by pedestrian's passageway. bolts without a caps and rotting mudsillsmaintain

    Sep 4, 2026 · Penalty $6,000

    Active
  • Class - 2

    Failure to renew is in violation of ac 28-105.2 (8) regarding the useof temporary construction equipment. owner must renew permit.renew

    Sep 4, 2026 · Penalty $3,125

    Active
  • Class - 1

    Failure to comply with bc3314.8 - 3314.9.4. observed supported scaffold with lose and unsecured debris netting on several levels were not complying with the required safety standards, creating an immediate haza

    May 28, 2026 · Penalty $10,000

    Active
  • Class - 2

    Failure to comply with bc 3307.6.5.6 sharp edges, sidewalk shed vertical elements have shape edges in several locations by pedestrian's passageway. bolts without a cap create hazards for pedestrians using the a

    May 28, 2026 · Penalty $10,000

    Active
  • Class - 2

    Failure to renew is in violation of ac 28-105.2 (8) regarding the use of temporary construction equipment. owner must renew permit immediately, pay applicable penalties, and file a certificate of correction wit

    May 28, 2026 · Penalty $6,250

    Active
  • Class - 2

    Temp construction equip/installation on site expired permit(shed). note: at time of inspection, i observed sidewalk shed permit not displayed any where of construction site, and observed shed permit #m00417201-

    May 14, 2026 · Penalty $6,250

    Active
  • Class - 2

    Temporary construction equipment of installation on site-expired permit. note: at time of inspection, observed no permits displayed at construction job site. observed supported scaffolding permit expired on bis

    May 14, 2026 · Penalty $6,250

    Active
  • Class - 2

    Temporary construction equipment or installation on site-expired permit. note: at time of inspection, i observed no permit displayed at construction job site and observed construction fence permit expired on bi

    May 14, 2026 · Penalty $6,250

    Active
  • Class - 2

    Temporary construction equipment or installation on site-expired permit. note: at time of inspection, i observed no permits displayed at construction at construction job site and observed temporary construction

    May 14, 2026 · Penalty $6,250

    Active
Show 40 more ↓
  • Class - 2

    Job site fence not constructed or maintained pursuant to subsection. note: at time of inspection, i observed rotten construction fence plywood panel. rotten and damaged construction fence wood frames. the loose

    May 14, 2026 · Penalty $5,000

    Active
  • Class - 2

    Pedestrian protection does not meet code specifications. note: at timeof inspection, i observed 2 slanted steel posts of sidewalk shed at exposure #1 south elevation and observed rotten mudsills at the bottom o

    May 14, 2026 · Penalty $10,000

    Active
  • Class - 2

    Pedestrian protection does not meet code-specifications. note: at timeof inspection, i observed loose hanging debris netting, damaged, improper tie down, loose debris netting on the support scaffolding at expos

    May 14, 2026 · Penalty $10,000

    Active
  • Class - 2

    Project information panel/sidewalk shed parapet panel/construction sign not provided or not in compliance with section. no contractor name, no owner name, and no project information sign displayed on parapet wa

    May 14, 2026 · Penalty $6,250

    Active
  • Class - 1

    Failure to provide proper support for temporary wiring. note: at time of inspection, i observed electrical wire, digital data wire are exposed and contact to steel beams, steel posts of sidewalk shed without pr

    May 14, 2026 · Penalty $8,000

    Active
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements. note: at time of inspection, i observed steel pipes of scaffolding, woodpallet, yellow steel bar left outside of construction fence and obstru

    May 14, 2026 · Penalty $6,250

    Active
  • Class - 2

    Failure to file acceptable amended cycle 7a, 8a, and 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #901544. remedy: file acceptable re

    Apr 20, 2026 · Penalty $6,250

    Active
  • Class - 1

    While following up on a complaint about unsafe construction equipment. i observed a sidewalk shed with a supported scaffold installed above, not maintained, and no active permits. the sws upright post was dange

    Jan 30, 2026 · Penalty $10,000

    Active
  • Class - 1

    Failure to maintain pipe scaffolding in a code-compliant manner. at time of inspection, sections of the pipe scaffolding are missing netting and other sections torn., repair and/replace

    Oct 1, 2025 · Penalty $12,500

    Active
  • Class - 2

    Temp construction equip/installation on site expired permit (shed). at time of inspection, sidewalk shed erected at exposure 1 without a permit filed on the dob systems., renew permit

    Oct 1, 2025 · Penalty $6,250

    Active
  • Class - 2

    Temporary construction equipment or installation on site - expired permit. at time of inspection, construction fence erected at exposure 1 without a permit filed on the dob systems (permit # m0417223-i1-fn). ex

    Oct 1, 2025 · Penalty $6,250

    Active
  • Class - 1

    Failure to maintain temp ramp that leads roadway to sidewalk in a code compliant manner. at time of inspection, there is no temp ramp for pedestrians to enter/leave the sidewalk., repair and/replace

    Oct 1, 2025 · Penalty $12,500

    Active
  • Class - 2

    Temporary construction equipment or installation on site - expired permit. at time of inspection, pipe scaffold erected at exposure 1 without a permit filed on the dob systems (permit # m0417213-i1-sf). expirat

    Oct 1, 2025 · Penalty $6,250

    Active
  • Class - 2

    At time of inspection in response to complaint i observed underside of sidewalk shed a not illuminated as per 3307.6.4.8. creating a hazardous condition for public walking underneath while dark and not being vi

    Jun 5, 2025 · Penalty $2,400

    Active
  • Class - 2

    Observed a shed installed expo#1 of the site. upon checking department records, shed permit expired 3/31/24. shed conditions has not been maintain as per code. permit not maintain as per code.

    Jun 5, 2025 · Penalty $1,250

    Active
  • Class - 2

    Observed a pipe scaffold over 40' installed on top of a shed. not maintain as per code. upon checking department records, scaffold permit expired on 3/31/24.

    Jun 5, 2025 · Penalty $6,250

    Active
  • Class - 2

    At time of inspection of a 13-story building. after looking in bis and dobnow, i observed construction fence erected at exposure #1 with expired construction fence permit, renew permit; renew permit. renew cons

    Apr 11, 2024 · Penalty $1,250

    Active
  • Class - 2

    At time of inspection of a 13-story building. after looking in bis and dobnow, i observed sidewalk shed erected at exposure #1 with expired sws permit, renew permit; remedy: renew permit. renew sidewalk shed pe

    Apr 11, 2024 · Penalty $1,250

    Active
  • Class - 2

    Atoi of a 13-story building with a sws erected at exp. #1. i observed construction fence does not have project information panel as per code bc 3301.9.1.1 through bc 3301.9.1.6., comply with code; comply with c

    Apr 11, 2024 · Penalty $5,000

    Active
  • Class - 2

    Atoi of a 13-story building with a sws erected at exp. #1 with missing information parapet panel as required by code (3301.9.2.). not providing information panel (which includes the building address) can cause

    Apr 11, 2024 · Penalty $6,250

    Active
  • Class - 2

    Bc 3314.1 at time of inspection i observed supported scaffold installed at exposure #1 with disconnected debri safety netting flapping in the air, create unsafe condition for material falling maintain safe sca

    Jan 19, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    Observed and erected sidewalk shed at exposure 1, with a temporary walkway in the street adjacent to the curb line. plastic yodock style barricades to protect the walkway the plastic barricades were empty, fail

    Sep 11, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #901544.remedy:submit acceptable required te

    Dec 9, 2022 · Penalty $1,250

    Active
  • Class - 2

    I observed closed site of an alt1 job. sidewalk shed(sws) at exp1, near exp2 has a horizontal brace above the main path for pedestrians, less than the 8f minimum height clearance as required by bc3307.6.4.7. ha

    Nov 7, 2022 · Penalty $2,400

    Resolve
  • Class - 1

    Observed big amount of demolition debris, construction debris and garbage on several floors creating an immediate hazard of slipping, tripping, falling causing injury. also observed dumpster debris container at

    Jun 30, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    Work does not conform to plan(needle beams.noted:at time of inspectionof an active jobsite observed needle beams install at exp.#3 & 4.at exp.#3 needle beams is complete w/pipe scaffold on top & at exp.#4 needl

    Mar 19, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Summons issued for erected scaffold at exposure 1 with a expired permit., renew permit; obtain permit

    Dec 20, 2021

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or amendments-sidewalk shed exp #1-at time of inspection of a 12 story alteration observed on ground street level sws not built to approved documents

    Dec 16, 2021 · Penalty $6,250

    Active
  • Class - 1

    Work does not conform to approved constuction documents and/or amendments-material hoist 8th-11th floor exp #1.at time of inspection at 12 story alteration observed on 8th floor material hoist platform bracing

    Dec 16, 2021 · Penalty $12,500

    Active
  • Class - 2

    Failure to file acceptable cycle 7a & 8a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #801544.remedy:file acceptable report.

    Oct 8, 2021 · Penalty $1,250

    Active
  • Class - 1

    3301.7 no design drawings onsite.note:at the time of my inspection of a 13 story active jobsite.i observed needle beams extending from the 3rd floor at exposure 3 which are holding a supported scaffold at that

    Sep 29, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    3314.4.2 scaffolding maintenance & repair noted:at the time of my inspection on an active jobsite i observed supported scaffoling on exposures 1 & 3 that were not properly maintained.scaffolding safety pins whe

    Sep 29, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications.noted at time of my inspection of an alt type 1,13 story building construction in progress,i observed the sidewalk shed at exp1 did not extend the require

    Jun 11, 2021 · Penalty $2,400

    Resolve
  • Class - 2

    3309.1 failure to protect structures/properties,no bulkhead protectionat exp4,no roof protection at exp2.at time of inspection of a 13 storyactive building,we walked to the roof where noticed the adjacent prope

    Jun 11, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    3314.1 supported scaffold built in a unsafe manner.noted at time of analt active building we walked the supported scaffold installed at exp3observed numerous missing end rails throughout stair tower,loose hand

    Jun 11, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    28-105.12.8 onsite conditions contrary to ssp.noted at time of my inspection of an alt type 1,13 story building construction in progress i observed the overhead protection at exp3 stopped at the property line a

    Jun 11, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    28-407.1 welders license(none)noted at time of my inspection of an alttype 1,13 story building construction in progress i observed a welder working in the stairwell of the 12/13th floor.upon request for has dob

    Jun 11, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    Prohibited business advertising sign posted on the sidewalk shed at the time of inspection observed advertising sign "societyhousenyc.com-a collection of gg studio to 2 bedroom residences from approxmately $800

    Jan 8, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications.note:at time of my inspection on a 13 story alt building i observed side walk shed in place.i observed sidewalk shed was not fully enclosed at expo#1 appr

    Sep 1, 2020 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements.at time of my inspection on alt job site at 13 sty.i observed a large amounts of debris near the dumpster container creating a tripping hazard

    Sep 1, 2020 · Penalty $2,500

    Resolve

Complaints

  • General

    Cooking gas

    Jun 26, 2022 · Apt 1W

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
1927
Floors
12
Residential units
66
Building area
73,106 ft²
Lot area
7,406 ft²
Zoning
C6-4M
Community board
104
Council district
3
Block / lot
759 / 18
Assessed value
$10,353,150
Landmark / historic district
No

Questions about 335 West 35 Street

Who owns 335 West 35 Street?

The owner of record in NYC Department of City Planning PLUTO data is Neo Image Enterprises, LLC.

Does 335 West 35 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 335 West 35 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 335 West 35 Street built?

City records list 1927 as the year it was built.

How many apartments are in 335 West 35 Street?

It has 66 residential units and 67 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.