439 West 36 Street
Manhattan, NY 10018BBL 1-00734-0010Map
Owner of record: Zdj 36 LLC
439 West 36 Street is an elevator apartment building built in 2024 in Manhattan, 10018. It has 48 residential units. The owner of record is Zdj 36 LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 18
- ECB violations
- 31
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 18
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 2, 2024
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2011
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 8, 2008
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 3, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 15, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2004
Dob violation - resolved - Elevator elevatorrequired
1f2781
Jan 30, 2001
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed
Show 8 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 28, 1993
Dob violation - dismissed - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed - Elevator elevatorrequired
(33) repair street hoistway door (35) put all interlocks in working order (43) adjust or replace
Jan 23, 1989
Dob violation - resolved - Elevator elevatorrequired
(33) repair street hoistway door (35) put all interlocks in working order (43) adjust or replace
Jan 23, 1989
Dob violation - active
ECB violations · 31
- Class - 1
At time of inspection, a worker was observed accessing the roof to perform roofing work where the roof perimeter was protected only by an approximately 25-inch parapet. no compliant guardrails, controlled acces
Jul 29, 2026 · Penalty $5,000
Resolve - Class - 2
Multiple levels of the supported scaffold, exp 1 heavy construction materials were stored on the scaffold platforms obstructing access to the scaffold ladders. poor housekeeping was observed with construction m
Jul 29, 2026
Resolve - Class - 2
Active construction site with unfinished work. observed two fully furnished model apartments on the 6th floor occupied without a temporary certificate of occupancy (tco) as required by ac 28-111. stop all use o
Jul 29, 2026
Resolve - Class - 1
At time of inspection, observed two lifelines attached to the same anchor point. contrary to bc 3314.6.3, each lifeline shall be secured to an independent anchorage. failure to provide separate anchorages creat
Oct 23, 2025 · Penalty $5,030
Active - Class - 2
Observed new mechanical duct work was installed from cellar to the 12 floor & app. # m00771011-s1-ms(filed subsequent to nb gc, job # m00771011) was only approved & not permitted as of 11:15am, 05-12-25. stop a
May 12, 2025
Resolve - Class - 2
Ongoing construction operations with inadequate housekkeping in multiple locations consisting of construction debris & materials. large amounts of said debris rested on reshore & obstructing egress.maintain ade
Feb 25, 2025
Resolve - Class - 2
At the time of inspection active construction site, at the second floor level, i observed delivery operation in progress with trucks and materials storage adjacent to the sidewalk shed at exposure#1 not provide
Feb 4, 2025
Resolve - Class - 1
Failure to comply with bc3301.8, incidents occurred 9:30am but it was delay of notification which reported 2:35 pm, failure to immediately notified the department. didn't comply to requirement of section 3301.1
Dec 30, 2024
Resolve - Class - 2
Failure to comply with 20-04 backflow prevention devices while using public property (fire hydrant) in construction operation on site. not provide and maintain devices, create unsafe condition causing contamin
Dec 30, 2024 · Penalty $5,000
Resolve - Class - 1
Failure to provide and maintain adequate pre-shift safety meeting contrary to bc3301.12.2. the pre-shift safety meeting contents were missing specific safety concerns and risks associated with fulfilling such w
Dec 30, 2024 · Penalty $5,000
Resolve
Show 21 more ↓
- Class - 1
Failure to comply with 3310.8.2.1, incidents occurred 9:30am but it was delay of notification which reported 2:35 pm, failure to immediately notified the department. didn't comply to requirement of section 3301
Dec 30, 2024 · Penalty $2,500
Resolve - Class - 1
Failure to comply with 3310.8.2.1, incidents occurred 9:30am but it was delay of notification which reported 2:35 pm, failure to immediately notified the department. didn't comply to requirement of section 3301
Dec 30, 2024
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. as noted at time of inspection on an active construction site, 12 story new building foundation phase working. work does not
Dec 4, 2024
Resolve - Class - 1
Failure to provide concrete safety manager on site(major building). asnoted at time of inspection on an active construction site 12 story new building foundation phase working. work permit #m00771011-l1-gc fill
Dec 4, 2024
Resolve - Class - 2
Drillpile work affecting tenants at 3 story adj.property exp4.dust/grout striking windows with make shift tarp only protecting story 1-2.app.ssp indicates window protection be provided during soe,no detail drai
Jul 30, 2024
Resolve - Class - 2
Exp3 observed excavation pit with standing water not adequality drain per 3304.10 creating hazard to workers and the public of rodent or mosquito infestation.comply with section 3304 of building codes chapter 3
Jul 30, 2024 · Penalty $2,500
Resolve - Class - 1
Miscellaneous violations. at time of inspection nb observed drainage of excavation taken place observed water is being pumped into the city drain system upon requesting for the dep permit for the drainage of wa
Jul 10, 2024
Resolve - Class - 2
Observed standing water inadequate drainage contrary with bc sections 3303.14.1 through 3303.14.5. permitholder failed to maintain site as per code sections creating hazardous to environmental and adjacent foot
Jul 10, 2024 · Penalty $1,250
Resolve - Class - 1
Failure to provide pedestrian protection for sidewalks and walkways asrequired. at time of inspection observed drain hose being used to pumpwater out from the construction site. observed inadequate foot bridge
Jul 10, 2024 · Penalty $625
Resolve - Class - 2
At time of inspection observed nb observed excavation in progress drilling operation observed yodok was not in a lock position and was not half full as require.for pedestrian walkway...
Jun 24, 2024 · Penalty $2,500
Resolve - Class - 1
Permitholder failed to include required information contrary with code *3301.11.5 records section "3" the name, title and company affiliation of the qualified person who conducted such orientation, along with s
May 20, 2024 · Penalty $5,000
Resolve - Class - 1
Failure to comply with fire code as i observed xrvs 1000 cd8 t4f portable compressor on site no permit from fdny creating an immediate hazardous and contrary with 1401-01 enforcement of fire safety at constru
May 20, 2024 · Penalty $2,500
Resolve - Class - 2
Active site under demo operation including use of mechanical equipment for chipping concrete slabs & debris removal. upon request for document on assessment of adjoining structures in all places at exposures in
Apr 26, 2024 · Penalty $1,250
Resolve - Class - 1
In respond to complaint, i observed existing 2 story building demolished including use of mechanical equipment (excavator & jack hammer) for removing debris & chipping concrete slabs. upon request for active de
Apr 26, 2024
Resolve - Class - 1
Failure to designate and/or have site manager or site safety coordinator present at site as required. after research in both dob now and bisit was revealed that general contractor, under application m00771011,
Mar 1, 2024 · Penalty $2,500
Resolve - Class - 2
At time of inspection of a proposed 12 storeys new building at support excavation level , i observed soil test pit in progress , upon request to view the copy of site safety plan document , site safety manager
Feb 22, 2024 · Penalty $312
Resolve - Class - 1
At the time of inspection observed a sidewalk shed being erected at buildings exposure 1 along the streets curb line, upon request to view the d o t permits to show for compliance, no d o t permits were provide
Mar 21, 2023 · Penalty $625
Resolve - Class - 2
72m07,100m07,68m07,67m07,100m07.72m07-provide pit stop switch/100m07-provide elec prints/68m07 provide maintenance log/67m07provide 2 way communication/100m07provide window signage shaftway.
Jan 25, 2011
Resolve - Class - 1
Sec.bc3314.9 scaffold does not meet bldg code standards.noted:supported scaffold installed at exposure #1 does not meet code standards 1)missing tiebacks 2)missing horizontal pins 3)missing pins for vertically
Aug 24, 2009 · Penalty $1,600
Resolve - Class - 2
2x10.2x10 repair alarm bell on stop switch
Jun 10, 2009
Resolve - Non-hazardous
Oil lines uncovered. cover all pressuretrol. wiring exposed steam or attitude guage inoperative
Mar 30, 1990
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2024
- Floors
- —
- Residential units
- 48
- Building area
- 67,121 ft²
- Lot area
- 7,406 ft²
- Zoning
- R8A
- Community board
- 104
- Council district
- 3
- Block / lot
- 734 / 10
- Assessed value
- $5,346,450
- Landmark / historic district
- No
Questions about 439 West 36 Street
Who owns 439 West 36 Street?
The owner of record in NYC Department of City Planning PLUTO data is Zdj 36 LLC.
Does 439 West 36 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 439 West 36 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 439 West 36 Street built?
City records list 2024 as the year it was built.
How many apartments are in 439 West 36 Street?
It has 48 residential units and 49 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.