414 West 36 Street
Manhattan, NY 10018BBL 1-00733-0046Map
Owner of record: Hbis Rlty Corp
414 West 36 Street is a walk-up apartment building built in 1900 in Manhattan, 10018. It has 21 residential units across 6 floors. The owner of record is Hbis Rlty Corp. HPD has recorded 101 housing violations here, most recently on August 11, 2026. 33 of the 50 most recent violations are still open.
- HPD violations
- 101
- DOB violations
- 3
- ECB violations
- 1
- HPD complaints
- 241
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 101
- BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at vestibule
Aug 11, 2026
Open — Nov sent out - BHazardous
Replace with new the missing door knob at building entrance door
Aug 11, 2026
Open — Nov certified on time - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north ,south walls and ceiling in the kitchen located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and west wall at public hall, 1st story
Aug 11, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Aug 11, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story
Aug 11, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story
Aug 11, 2026
Open — Nov certified on time - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10sqft at north wall in the 1st room from north located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the kitchen located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at west , south walls and ceiling in the 1st room from north located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 1st room from north located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective intercom panel at west wall leading to building entrance intercom system. in the private hallway located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Refit entrance door in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Remove all obstructions and repair all defects in at wash basin in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sqft at ceiling in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Violation will be reinspected - ANon-hazardous
Paint metal in accordance with dept. regulation metal riser at east wall in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the private hallway located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the private hallway located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical bx cable at west wall in the private hallway located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1a, 2nd story, 1st apartment from north at east
Aug 11, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front
Mar 6, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector (missing) located at apt 5c, 5th story, 1st apartment from south at west
Apr 19, 2017 · Apt 5C
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked to cellar , 1st story
Feb 27, 2017
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 5c, 5th story, 1st apartment from south at west
Feb 27, 2017 · Apt 5C
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 5c, 5th story, 1st apartment from south at west
Feb 27, 2017 · Apt 5C
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective located at apt 5c, 5th story, 1st apartment from south at west
Feb 27, 2017 · Apt 5C
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures located at apt 5c, 5th story, 1st apartment from south at west
Feb 27, 2017 · Apt 5C
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective intercom system in the foyer located at apt 5c, 5th story, 1st apartment from south at west
Feb 27, 2017 · Apt 5C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story
Nov 18, 2016
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceiling at public hall, 3rd story
Nov 18, 2016
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 5c, 5th story, 1st apartment from south at west
Nov 18, 2016 · Apt 5C
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 26, 2016
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130f. in the kitchen located at apt 1c, 2nd story, 1st apartment from south at west
Oct 14, 2015 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures sink in the kitchen located at apt 1c, 3rd story, 1st apartment from south at west
Mar 4, 2015 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective connection waste pipe at sink in the kitchen located at apt 1c, 3rd story, 1st apartment from south at west
Mar 4, 2015 · Apt 1C
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1c, 3rd story, 1st apartment from south at west
Mar 4, 2015 · Apt 1C
Closed — Violation closed
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
ECB violations · 1
- Non-hazardous
Failure to maintain exterior bldg wall(hazardous)noted:cement and brick fell from 6 stry bldg onto sidewalk.front of bldg is bulging cracked and structuraly defective throughout creating hazardous conditions.re
Mar 30, 2001 · Penalty $800
Active
Complaints
- Unsanitary condition
Pests
Aug 7, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Aug 7, 2026 · Apt 1A
Close - Paint/plaster
Wall
Aug 7, 2026 · Apt 1A
Close - Flooring/stairs
Floor
Aug 7, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Aug 7, 2026 · Apt 1A
Close - Plumbing
Basin/sink
Aug 7, 2026 · Apt 1A
Close - Flooring/stairs
Floor
Aug 7, 2026 · Apt 1A
Close - Plumbing
Bathtub/shower
Aug 7, 2026 · Apt 1A
Close - Door/window
Door
Aug 7, 2026 · Apt 1A
Close - General
Bell/buzzer/intercom
Aug 7, 2026 · Apt 1A
Close
Show 40 more ↓
- Flooring/stairs
Floor
Aug 7, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Aug 7, 2026 · Apt 1A
Close - Plumbing
Water supply
Mar 4, 2026 · Apt 1A
Close - Water leak
Damp spot
Mar 4, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Mar 4, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Mar 4, 2026 · Apt 1A
Close - Plumbing
Water supply
Mar 2, 2026 · Apt 1A
Open - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 1A
Open - Heat/hot water
Apartment only
Nov 22, 2023 · Apt 1A
Close - Door/window
Window pane
Jul 6, 2020 · Apt 1A
Close - Electric
Power outage
Jul 6, 2020 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Aug 19, 2017 · Apt LB
Close - Unsanitary condition
Garbage/recycling storage
Aug 19, 2017 · Apt LB
Close - Heat/hot water
Entire building
Feb 27, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2017 · Apt 5C
Close - Heat/hot water
Entire building
Jan 11, 2017 · Apt 5C
Close - Heat/hot water
Entire building
Jan 11, 2017 · Apt 5C
Close - Heat/hot water
Entire building
Nov 17, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2016 · Apt 5C
Close - Heat/hot water
Entire building
May 6, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
May 1, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 2, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 22, 2016 · Apt 5C
Close - Heat/hot water
Entire building
Mar 21, 2016 · Apt 5C
Close - Flooring/stairs
Stairs
Mar 17, 2016 · Apt 1A
Close - Heat/hot water
Entire building
Mar 17, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2016 · Apt 2D
Close - Heat/hot water
Apartment only
Mar 4, 2015 · Apt 1C
Close - Flooring/stairs
Floor
Feb 7, 2015 · Apt 1C
Close - Appliance
Refrigerator
Feb 7, 2015 · Apt 1C
Close - Heat/hot water
Apartment only
Feb 7, 2015 · Apt 1C
Close - Paint/plaster
Wall
Feb 7, 2015 · Apt 1C
Close - Paint/plaster
Wall
Feb 7, 2015 · Apt 1C
Close - Paint/plaster
Wall
Feb 7, 2015 · Apt 1C
Close - Paint/plaster
Wall
Feb 7, 2015 · Apt 1C
Close - Plumbing
Water supply
Feb 7, 2015 · Apt 1C
Close - Heat/hot water
Apartment only
Feb 7, 2015 · Apt 1C
Close - Heat/hot water
Apartment only
Feb 7, 2015 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 28, 2015 · Apt 1C
Close - Plumbing
Water supply
Jan 12, 2015 · Apt 1C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1900
- Floors
- 6
- Residential units
- 21
- Building area
- 14,000 ft²
- Lot area
- 2,814 ft²
- Zoning
- R8A
- Community board
- 104
- Council district
- 3
- Block / lot
- 733 / 46
- Assessed value
- $1,419,300
- Landmark / historic district
- No
HPD registration #116293, last renewed Jul 29, 2026.
Questions about 414 West 36 Street
Who owns 414 West 36 Street?
The owner of record in NYC Department of City Planning PLUTO data is Hbis Rlty Corp.
Does 414 West 36 Street have violations?
Yes. NYC HPD has recorded 101 housing violations at this property.
Is 414 West 36 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 414 West 36 Street built?
City records list 1900 as the year it was built.
How many apartments are in 414 West 36 Street?
It has 21 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.