405 West 13 Street
Manhattan, NY 10014BBL 1-00646-0049Map
Owner of record: Jarmco Holding Corp
405 West 13 Street is an office building built in 1909 in Manhattan, 10014. The owner of record is Jarmco Holding Corp. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 66
- ECB violations
- 58
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 66
- Landmark none
Landmk-landmark none
Feb 10, 2025
Dob violation - dismissed - Landmark none
Landmk-landmark none
Feb 10, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 30, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 25, 2015
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 24, 2013
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 11, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 13, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 7, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 24, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 8, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 8, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 25, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Marquee other required
Cmq-marquee other required
Mar 20, 2007
Dob violation - dismissed
ECB violations · 58
- Class - 2
Sec. bc 3307.6.4.9 avoid interference w/traffic signs. at the time of my inspection,i observed a sidewalk shed installed at exp#1 whereby the parapet & vertical member components were fully interfereing w/the
Sep 25, 2020
Resolve - Class - 1
Failure to build scaffold as per design drawing.at the time of inspection of an active job site i observed supported scaffold not built as per drawing there were missing guardrails,endrails , toe boards,and the
May 26, 2020 · Penalty $2,500
Resolve - Class - 1
Bc 3314.4 a failure to maintain supported scaffold in a code compliant manner.loose planks at exp#1 setback,exp3 and 4,missing pins were observed thoughout.also scaffold pre shift inspection logs were inadquate
May 26, 2020 · Penalty $2,500
Resolve - Class - 1
Bc33087-gaurdrails system{toe boards}at the time of my inspection of an active jobsite on a windy day,i observed that the toeboards at the lending edges of exposure 1 on the unenclosed floors 4-6 and roof were
Feb 28, 2020 · Penalty $625
Resolve - Class - 1
Bc33141-work contrary to construction documents{scaffold}at the time of my inspection,i observed that the supported scaffolds at exposures 1and 4 were not constructed per approved/accepted drawings.exposure 1 h
Feb 28, 2020 · Penalty $2,500
Resolve - Class - 1
Bc330341-slipping and tripping hazards.at the time of my inspection,i observed that there was ice on the roof working deck and as well several of the unenclosed floors of the job site.also,there was a puncture
Feb 28, 2020
Resolve - Class - 2
Bc33141-scaffold logs.at the time of my inspection of a 6 story building undergoing alterations,i observed several conditions that were not included in the daily shed & scaffold inspection logs such as unsafe c
Feb 28, 2020 · Penalty $1,250
Resolve - Class - 1
Bc330112-failure to comply with fdny fire codes 105.6(1){no permit}and105.6(2){unsafe storage}at the time of my inspection of an active sitei observed 2 oxy-acetylene.at the time of my inspection of an active s
Feb 28, 2020 · Penalty $2,500
Resolve - Class - 2
Bc330915-modifications and alternative methods{window protectoin}at the time of my inspection,i observed that the window protection of the adjoining property consisted of synthetic mesh held to the wall with ve
Feb 28, 2020
Resolve - Class - 1
Work contrary to construciton documents{sidewalk shed}at the time of my inspection,i observed the construction fence was not constructed as per drawings.drawings indicate a 45""projection plywood parapet"howeve
Feb 28, 2020 · Penalty $625
Resolve
Show 40 more ↓
- Class - 1
Permit holder failed to ensure each construction or demolition worker successfully completed the required training under bc 3321.1: observed gary ronnel baptiste at a building site for which a construction supe
Nov 19, 2019
Resolve - Class - 1
Owner failed to ensure each construction or demolition worker successfully completed the required training under bc 3321.1: observed gary ronnel baptiste at a building site for which a construction superintende
Nov 19, 2019 · Penalty $12,500
Resolve - Class - 1
Permit holder failed to ensure each construction or demolition worker successfully completed the required training under bc 3321.1: observed bevan scotland at a building site for which a construction superinten
Nov 19, 2019
Resolve - Class - 1
Owner failed to ensure each construction or demolition worker successfully completed the required training under bc 3321.1: observed bevan scotland at a building site for which a construction superintendent,ssm
Nov 19, 2019 · Penalty $12,500
Resolve - Class - 1
Failure to institute and maintain safety equipment measures and temporary construction. note-at the time of inspection of a 6 story alteration site in progress i observed (1)work being done near open elevator s
Nov 2, 2019 · Penalty $2,500
Resolve - Class - 1
Bc 3301.2 failure to institute and maintain safety equipment measures and temporary construction. note-at the time of inspection of a 6 story alteration construction site in progress i observed there was missin
Nov 2, 2019 · Penalty $625
Resolve - Class - 2
Work after hours w/o a variance permit contrary to 28-105.12.5. note-at the time of inspection of a 6 story alteration construction site in progress upon inspection i observed there was work being done contrary
Nov 2, 2019
Resolve - Class - 1
Sec. 3307.4 work & storage zone. note: at the time of my inspection ofa 6 sty alteration construction site in progress,i observed steel devilery w/beam truck lifting to 4th level. i also observed that there wer
Nov 2, 2019 · Penalty $625
Resolve - Class - 1
Permit holder failed to ensure that workers recieve site safety orieantation or refresher. @time of inspection of a 6 sty alt construction site in progress. upon request for workers orieantatics or refreshers
Nov 2, 2019
Resolve - Class - 1
Fialure to maintain/display on-site documents required by; bc chapter 33 (no special inspection reports)-@time of inspection, it was observed that major alt was in progress & several structural steel shoring
Jun 5, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to provide approved/accepted construction doc 2jobsite @time of inspection (no scaffolding plans)-@time of inspection, it was observed that a scaffloding system was erected @exp#4 next to the adjacent
Jun 5, 2019
Resolve - Class - 2
3309.4 failure to perform inspection and doc conditions of existing strucutres adjoining an excavation in a pre-construction survey.-@time of inspection, it was observed that a major alternation of an exisiting
Jun 5, 2019
Resolve - Class - 1
Work does not conform to approved doc and/or approved amendments.@the time of insp 3 sty alt building,i observed that the pipe temporary shoring is not contrary to drawings/plan. failure to maintain the struc
Jun 5, 2019 · Penalty $625
Resolve - Class - 1
28-407.1 welders license required to perform welding related duties-@time of inspection, it was observed that weelding-related operations, which consisted a using a flame torch attached to flammable gases were
Jun 5, 2019 · Penalty $2,500
Resolve - Class - 1
Const super failed to perform duties as per code-@time of inspection, the registerd super 'adrian nachum" was not onsite, and the following violating conditions took place:(1)the log book did not contain the
Jun 5, 2019 · Penalty $10,000
Resolve - Class - 1
Failure provide maintain the required documents.at the time of inspection superintendent fail to provide ny. fd permits site safety plan forneighboring property noise monitor.during using mechanical equipments
Feb 7, 2019 · Penalty $625
Resolve - Class - 1
Superintendent log not to date.at the time of inspection superintendent log book not up to date for 7 days no sign in on out no notice.superintendent log at site all time up to date as per code
Feb 7, 2019
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirement {full stop work order except for correcting the summon}. at time of inspection, i observed huge amount of bricks and construction debris and mat
Feb 7, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to institute/maintain safety equipment measure or temp.construction no guardrails.at the time of inspection i observed that 1st and 2nd means of egress and to cellar without rail guard(handrail)which ca
Feb 7, 2019 · Penalty $2,500
Resolve - Class - 1
Unsafe storage of combustible material.fdny.at the time of inspection i observed cylinders of (ox and other gasoline and flamable material iasked for permit superintendent can not provide,stated he founded at t
Feb 7, 2019 · Penalty $2,500
Resolve - Class - 2
97x10 restore to service so elevator can be inspected.
Mar 28, 2016 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the commissioner's order contained in nov#35161198j issued on 10/10/15 and to file a certificate of correction pursuant to 28-201.1, 28-204.4 and 1rcny 102-01. noted: no compliance recorded
Mar 14, 2016 · Penalty $800
Resolve - Class - 1
Operation of place of assembly w/o a current c of o. noted: at time of inspection premises occupied as vip lounge was fully occupied w/350 persons w/staff w/o obtainig a pa permit. remedy: obtain a place of
Oct 10, 2015 · Penalty $815
Resolve - Class - 2
Operation of a place of assembly w/o a current c of o. no current pa present @ time of inspection. remedy: obtain a place of assembly c of o.
Oct 12, 2014
Resolve - Class - 2
Altered bldg occupied w/o a valid c of o as per 28-118.3.1 - 28-118.3.2 noted: c of o #103919501t032 expired 12/31/13 @ time of inspection. remedy: obtain valid c of o.
Oct 12, 2014 · Penalty $500
Resolve - Class - 1
21l10,34i10,03m07,03b10. 21l10-cu-"k" contact sticking elevator runs with door open; 34i10-holes shaftway walls; 03m07-running elevator withno gates and gate switches,provide.
Sep 16, 2014
Resolve - Class - 1
Cease use 21l10/ 34i10/ 03m07/ 03b10/ (21-l-10) cu "k" contact sticking elevator run with door open (34-i-10) holes shaftway walls (03-m-07)running elevator w/ no gates and gate switches./ provide
Sep 16, 2014 · Penalty $1,000
Resolve - Class - 3
B351.68m7,40o2,60b7,42m7,41m7.68m:provide missing maint.log.40o:clean & clear debris in dirty mach.rm.60b:prov.operative mach.rm.lighting & recepticles.42m:provide missing controller doors.41m:prov.missing m.r.
Apr 9, 2014 · Penalty $500
Active - Class - 1
Failure to maintain bldg in code compliant manner. no fire stopping per bc 712.3;27-345. noted:in cellar secondary/rear boiler room missing fire stopping as various pipe,smoke pipe wall,ceiling penetration. rem
Aug 23, 2012 · Penalty $1,000
Resolve - Class - 2
Work w/o permit. work noted: erected wood frame deck w/electrical wiring at 1st flr front. work 60% complete. remedy: stop all work. obtain permit.
Mar 19, 2012 · Penalty $400
Resolve - Class - 2
Failure to comply w/ the comms order to file a cert of correction w/ the dob respondent filed to compl w/ the comm order to correct the violating conditions and file a cert of correction pursuant to section 28-
Mar 19, 2012 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. no firestopping as per bc 712.3, 27-345. remedy: provide/maintain firestopping.
Mar 19, 2012 · Penalty $2,500
Resolve - Class - 1
Filed a cert of correction or other related materials containing material false statement respondent filed a cert of correction on 12/02/11 for nov #34924196m upon insp found that the conditions which responden
Mar 19, 2012 · Penalty $4,800
Resolve - Class - 1
Bc903 failure to provide siamese location sprinkler system installed w/ over 36 sprinkler heads and no siamese connection installed rem: provide required siamese connection
Nov 29, 2011 · Penalty $1,600
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: eating & drinking establishment at 1 fl & cellar having exit passageway obstructed by curtains, coat racks, boxes, chairs. remedy: remove obstruction.
Nov 10, 2011 · Penalty $1,200
Resolve - Class - 1
Pa contrary to approved construction documents appl #103197503. non-conforming work noted: no dj booth on plans, emergency lighting not as per plans, seating arrangement of restaurant.no plans for cellar level
Nov 10, 2011 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. defects noted: 1)at1st flr night club area sprinkler heads obstructed by suspended ceiling 2) suspended ceiling hung by wire. remedy: repair/replace defects.
Nov 10, 2011 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. no fire stopping incode compliant manner as per bc 712.3, 27-345. remedy: provide maintain firestopping.
Nov 10, 2011 · Penalty $1,000
Resolve - Class - 2
Altered/changed bldg occupied w/o a valid c/o as per 28-118.3.1 to 28-118.3.2.t.c.o#103919501t-23 expired 07/20/2011. remedy:obtain valid c/o &/or discontinue illegal occupancy
Jul 30, 2011
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. illumination for exits; exit discharges & public corridors per bc 1008.1; 27-381, tested circuit breakers off but emergency lights did not operate.remedy:repai
Jul 30, 2011
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O5)
- Year built
- 1909
- Floors
- 6
- Residential units
- —
- Building area
- 39,751 ft²
- Lot area
- 7,744 ft²
- Zoning
- M1-5
- Community board
- 102
- Council district
- 3
- Block / lot
- 646 / 49
- Assessed value
- $9,551,700
- Landmark / historic district
- Gansevoort Market Historic District
Questions about 405 West 13 Street
Who owns 405 West 13 Street?
The owner of record in NYC Department of City Planning PLUTO data is Jarmco Holding Corp.
Does 405 West 13 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 405 West 13 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 405 West 13 Street built?
City records list 1909 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.