19 9 Avenue
Manhattan, NY 10014BBL 1-00645-0049Map
Owner of record: 9th Avenue Delaware Owner LLC
19 9 Avenue is a store building built in 1889 in Manhattan, 10014. The owner of record is 9th Avenue Delaware Owner LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 51
- ECB violations
- 23
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 51
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2021
Dob violation - resolved - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2020
Dob violation - resolved
Show 40 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Landmark none
Landmk-landmark none
Dec 31, 2019
Dob violation - dismissed - Landmark none
Landmk-landmark none
Dec 31, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 2019
Dob violation - resolved - Construction other optional
C-construction other optional
Aug 29, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Aug 29, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Aug 29, 2018
Vp*-violation unserved ecb- dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Construction other optional
The borough commissioner has placed an administrative stop work order for application #120938806 due to applicant of record withdrawal. stop all work immediately, make site safe, provide all required informatio n to boro comm office forthwith
Jan 19, 2018
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Construction other optional
Boro-comm
Jul 25, 2015
Dob violation - dismissed - Construction other optional
Boro-comm
Jul 25, 2015
Dob violation - dismissed - Construction other optional
Boro-comm
Jul 25, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 1, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 1, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 27, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Landmark none
Landmk-landmark none
Dec 6, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 29, 1999
Dob violation - dismissed
ECB violations · 23
- Class - 1
Building or open lot occupied without a valid certificate of occupancy. note: at the time of my inspection of a 5 story building under alteration. i observed floors from 1-5 were occupied by tenant of building.
Aug 29, 2018
Resolve - Class - 1
Bc3303.10/operations in occupied building.note:at the time of inspection of a 5 story under alteration construction work in progress.i observed occupants for building occupying building occupying building from
Aug 29, 2018
Resolve - Class - 2
Failure to safeguard all public and property affected by construction operations. note: at the time of my inspection of a 5 story building under alteration construction work in progress. i observed manlift oper
Aug 29, 2018 · Penalty $5,000
Resolve - Class - 1
Bc3303.10 operations in occupied building. note: at the time of my inspection of a 5 story bldg under alteration, construction work in progress. i observed occupant for building occupying building from 1st to 5
Aug 29, 2018
Resolve - Class - 2
Failure to have new or altered plumbing system tested @time of spot check insp i observed waste line from pumps walls closed in cellar all roughing for (seven) vent eater & waste in cellar 1st fl bathroom & ser
Jun 7, 2018 · Penalty $625
Resolve - Class - 1
Sec. 3301.5 inspection of equipment-unable to produce inspection/maintenance logs at time of inspection. at time of inspection hmo#8028,daniel j mooney could not produce daily or monthly inspection logs on cd
Apr 12, 2016 · Penalty $500
Resolve - Class - 1
Sec. 3301.5 failure to maintain construction equipment. at time of inspection,i observed the outriggers of cd 4706,cn 945/15 covered w/construction materials & debris. boom of crane was extended w/hoisting slin
Apr 12, 2016 · Penalty $1,600
Resolve - Class - 1
Sec. 3301.5 inspection of equipment-unable to produce inspection/maintenance logs at time of inspection. at time of inspection hmo#8028 daniel j mooney could not produce daily or monthly inspection logs on cd
Apr 12, 2016
Resolve - Class - 1
Failure to comply with an order of the commissioner.as requirement of 9-19 9th avenue going back to work it was required comanded to providedob with a weekly report out lining site progress and any information
Aug 20, 2015
Resolve - Class - 1
B.c.3315.1.2 failure to provide code compliant ramp.noted:constructionside ramp is missing timber curbs,in addition ramp rises more than 5ftabove adjoining ground,a standard guardrail is needed.the slope of the
Apr 7, 2015
Resolve
Show 13 more ↓
- Class - 2
Observed recent smoking refuse @ exp1,office,exp2,welding area & exp4,bathroom.rem:comply w/ code
Apr 6, 2015 · Penalty $1,200
Resolve - Class - 1
Work does not conform to approved construction documents &/or approvedamendments. noted: contractor excavated trench for installation of underpinning footing of an existing steel column at exp#1 & failed to
Apr 6, 2015
Resolve - Class - 1
Failure to provide protection at sides of excavations. contractor failed to protect worker while excavation operations ongoing in addition afatality occured. remedy: provide protection.
Apr 6, 2015 · Penalty $12,000
Resolve - Class - 1
3304.4failu to provide 3'6"guardrail on solid enclosure around open & accessible side of excavation.noted:contraction is missing guardrails @ exp1 & exp2.openings & guardrails @ various locations.rem:comply w/
Apr 6, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations.noted:contraction has began protruding out of the foundation& no reban caps.reban caps missing @ exp3 & exp4.rem:safeguard public
Apr 6, 2015 · Penalty $2,400
Resolve - Class - 2
Failure to provide approved/accepted plans @ job site @ time of inspection.noted:contraction has erected a temporary wooden walkway for means of egress to excation area @ exp1 & exp2 & no design drawings w/ eng
Apr 6, 2015 · Penalty $250
Resolve - Class - 2
Failure to comply w/ the comm order to file a cert of correction w/ the dob for nov#34915107r issued on 05/06/11 pursuant to 28-204.4 & 1rcny 102-01 for failure to maintain bldg in that spalling cracked missing
Jul 26, 2011 · Penalty $2,000
Resolve - Class - 1
Failure to maintain bldg defect is spalling cracked missing concrete above 1st story exposing rusted steel and rebar cracks and eroded mortar joints at various location of exterior walls missing loose and hangi
May 6, 2011 · Penalty $2,500
Resolve - Class - 2
Fail to maintain bldg in code compliant manner. noted: (1) masonry wall at left side of ramp & 2nd fl is cracked & has loose & missing masonry. (2) fire rated metal being is in disrepair & has loose hanging sec
Nov 7, 2009 · Penalty $500
Resolve - Class - 1
Occupancy contrary to dob records. noted: (2nd fl of parking garage has approx 10 commercial trucks box vans & large vans) parked in parkinggarage for cars. 4 car parking with no c of o for use & with no record
Nov 7, 2009
Resolve - Class - 2
Work w.o permit. noted: at 2nd fl of parking garage. metal stud & plywood partitions & concrete block walls constructed (for food storage & restaurant supply storage) approx 20'x 8'x 10' w/lighting & 3'x 7' met
Nov 7, 2009 · Penalty $800
Resolve - Hazardous
Exit passageway or corridor: total obstruction. noted: staircase at 2nd fl exposure #2 blocked by construction material, metal pipes, wood planks & misc debris. 2nd fl emergency exit door was locked upon time
Mar 12, 2008 · Penalty $2,500
Resolve - Hazardous
Failure to maintain: defects noted at 2nd fl entire ceiling, open holes, metal sheet (metal) coming down from ceiling. at driveway ramp exposure #2 wall bulging, cracked in danger of collapse.
Mar 12, 2008 · Penalty $2,500
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1889
- Floors
- 5
- Residential units
- —
- Building area
- 58,659 ft²
- Lot area
- 16,103 ft²
- Zoning
- M1-5
- Community board
- 102
- Council district
- 3
- Block / lot
- 645 / 49
- Assessed value
- $11,731,500
- Landmark / historic district
- Gansevoort Market Historic District
Questions about 19 9 Avenue
Who owns 19 9 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 9th Avenue Delaware Owner LLC.
Does 19 9 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 19 9 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 19 9 Avenue built?
City records list 1889 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.