roofy

765 Washington Street

Manhattan, NY 10014BBL 1-00640-0039Map

Owner of record: Video Storyboard Test, INC.

765 Washington Street is a mixed residential and retail building built in 1886 in Manhattan, 10014. It has 6 residential units across 5 floors. The owner of record is Video Storyboard Test, INC.. HPD has recorded 82 housing violations here, most recently on September 2, 2026. 34 of the 50 most recent violations are still open.

HPD violations
82
DOB violations
4
ECB violations
5
HPD complaints
54

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 2, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 82

  • B

    Properly repair or replace the broken or defective glass pane at building front entrance door

    Sep 2, 2026

    Open — Nov certified on time
  • B

    Remove all obstructions and repair all defects in at waste drain line at bathtub in the bathroom located at apt 4w, 4th story, 1st apartment from south at west

    Jul 6, 2026 · Apt 4W

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective located at apt 4w, 4th story, 1st apartment from south at west

    Jul 6, 2026 · Apt 4W

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective fire retardant material at south wall at vestibule , 1st story

    Jul 6, 2026

    Open — Nov certified on time
  • B

    M/d law abate the nuisance consisting of gap between wall and inner string at public hall stairs, 3rd story

    Jul 6, 2026

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of gap between wall and staircase at public hall stairs, 4th story

    Jul 6, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Jul 6, 2026

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in at waste drain line at wash basin in the bathroom located at apt 4w, 4th story, 1st apartment from south at west

    Jul 6, 2026 · Apt 4W

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective bell buzzer return system at building front to panel at north wall in the foyer located at apt 4w, 4th story, 1st apartment from south at west

    Jul 6, 2026 · Apt 4W

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective located at apt 4w, 4th story, 1st apartment from south at west

    Jul 6, 2026 · Apt 4W

    Open — Civ14 mailed
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective wood shelf at base cabinet at east wall in the kitchen located at apt 4w, 4th story, 1st apartment from south at west

    Jul 6, 2026 · Apt 4W

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at south wall at vestibule , 1st story

    Jul 6, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing. at public hall, 1st story

    Jul 10, 2023

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 2, 2022

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Apr 25, 2022

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Apr 25, 2022

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Apr 25, 2022

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of fire exit door (leading to rear yard) sealed at public hall, 1st story

    Apr 25, 2022

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak at north wall at public hall stairs, 4th story

    Apr 25, 2022

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at north wall at public hall stairs, 4th story

    Apr 25, 2022

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardant material at north wall at public hall stairs, 4th story

    Apr 25, 2022

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department - bulkhead ceiling at roof

    Apr 25, 2022

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead roof

    Apr 25, 2022

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Mar 18, 2020

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Mar 18, 2020

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 18, 2020

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at south wall at vestibule at public hall, 1st story

    Mar 18, 2020

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at south wall in the vestibule at public hall, 1st story

    Mar 18, 2020

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 26, 2016

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 5w, 5th story, 1st apartment from south at west

    Jul 29, 2013 · Apt 5W

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 5w, 5th story, 1st apartment from south at west

    Jul 29, 2013 · Apt 5W

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the west wall over apartment door. at public hall, 5th story

    Jul 29, 2013

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective fire retardant material at west wall over apartment door. at public hall, 5th story

    Jul 29, 2013

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the walls in the foyer located at apt 5w, 5th story, 1st apartment from south at west

    Jul 29, 2013 · Apt 5W

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective the wood floor throughout in the entire apartment located at apt 5w, 5th story, 1st apartment from south at west

    Jul 29, 2013 · Apt 5W

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective glass pane at window lower sash in the 3rd room from east located at apt 5w, 5th story, 1st apartment from south at west

    Jul 29, 2013 · Apt 5W

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall at public hall stairs, 5th story

    Jun 30, 2013

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at north wall at bulkhead at public hall stairs, 5th story

    Jun 30, 2013

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the north and west walls at public hall stairs, 4th story

    Jun 30, 2013

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at north and west walls at public hall stairs, 4th story

    Jun 30, 2013

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 4w, 4th story, 1st apartment from south at west

    Feb 3, 2009 · Apt 4W

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 4w, 4th story, 1st apartment from south at west

    Feb 3, 2009 · Apt 4W

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 4w, 4th story, 1st apartment from south at west

    Feb 3, 2009 · Apt 4W

    Open — Nov sent out
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling approx 1 sq.ft. in the bathroom located at apt 4w, 4th story, 1st apartment from south at west

    Jan 29, 2009 · Apt 4W

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the 3rd room from east located at apt 4w, 4th story, 1st apartment from south at west

    Jan 29, 2009 · Apt 4W

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4w, 4th story, 1st apartment from south at west

    Jan 29, 2009 · Apt 4W

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 4w, 4th story, 1st apartment from south at west

    Jan 29, 2009 · Apt 4W

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 4w, 4th story, 1st apartment from south at west

    Jan 29, 2009 · Apt 4W

    Open — Nov sent out
  • B

    Replace with new the broken or defective with regulation fire resistance rated self-closing door at boiler room in the 3rd room from east located at apt 4w, 4th story, 1st apartment from south at west

    Jan 29, 2009 · Apt 4W

    Open — Nov sent out

DOB building violations · 4

  • Landmark none

    Landmk-landmark none

    Dec 4, 2013

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Dec 31, 2002

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Dec 9, 1991

    Vp-violation unserved ecb-active
  • Construction other optional

    C-construction other optional

    Dec 9, 1991

    Dob violation - dismissed

ECB violations · 5

  • Class - 2

    Work w/o permit.work noted:installed conduit wires for sourcing electric from bldg to outdoor structure for electric lights&space heaters.also installed electric outlets&light switches.electrical wires suspende

    Mar 10, 2021 · Penalty $625

    Active
  • Class - 2

    Failure to maintain plumbing and/or appurtenances - hazardous in code-compliant manner. upon physical inspection found electric hot water heater defective/leaking from bottom and pressure/temperature relief

    Feb 26, 2009 · Penalty $500

    Resolve
  • Class - 2

    Work w/o a permit noted at the 1st fl rear yard of commercial eating and drinking establishment which is not open for business a trellis/roof like structure has been erected over the entire rear yard & plexigla

    Nov 5, 2008

    Resolve
  • Non-hazardous

    Altered building occupied without a valid cofo. as required by alt. p43/87. remedy: obtain a valid cofo.

    Sep 9, 1992 · Penalty $500

    Resolve
  • Non-hazardous

    Altered building occupied as two apartment east floor 2nd to 5th without a valid c of o required by open alteration 1243/87 remedy: obtain a valid c of o

    Sep 19, 1990 · Penalty $1,000

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Aug 28, 2026 · Apt BLDG

    Close
  • General

    Bell/buzzer/intercom

    Jul 2, 2026 · Apt 4W

    Close
  • Plumbing

    Basin/sink

    Jul 2, 2026 · Apt 4W

    Close
  • Plumbing

    Toilet

    Jul 2, 2026 · Apt 4W

    Close
  • Plumbing

    Bathtub/shower

    Jul 2, 2026 · Apt 4W

    Close
  • Heat/hot water

    Entire building

    Jan 23, 2025 · Apt ENTIRE

    Close
  • General

    Bell/buzzer/intercom

    Oct 3, 2023 · Apt 4W

    Close
  • General

    Bell/buzzer/intercom

    Apr 28, 2023 · Apt 4W

    Close
  • Unsanitary condition

    Mold

    Nov 1, 2021 · Apt 4W

    Close
  • Heat/hot water

    Entire building

    Mar 17, 2020 · Apt BLDG

    Close
Show 40 more ↓
  • Plumbing

    Water supply

    Mar 2, 2016 · Apt 2W

    Close
  • Plumbing

    Basin/sink

    Dec 23, 2013 · Apt 5W

    Close
  • Heating

    Heat related

    Dec 23, 2013 · Apt 5W

    Close
  • Paint/plaster

    Wall

    Jul 22, 2013 · Apt 5W

    Close
  • Paint/plaster

    Wall

    Jul 22, 2013 · Apt 5W

    Close
  • Paint/plaster

    Wall

    Jul 22, 2013 · Apt 5W

    Close
  • Paint/plaster

    Wall

    Jul 22, 2013 · Apt 5W

    Close
  • Paint/plaster

    Wall

    Jul 22, 2013 · Apt 5W

    Close
  • General

    Floor

    Jul 22, 2013 · Apt 5W

    Close
  • General

    Windows

    Jul 22, 2013 · Apt 5W

    Close
  • Plumbing

    Water-leaks

    Jul 22, 2013 · Apt 5W

    Close
  • General

    Mold

    Jul 22, 2013 · Apt 5W

    Close
  • General

    Floor

    Jul 18, 2013 · Apt 5W

    Close
  • General

    Floor

    Jul 18, 2013 · Apt 5W

    Close
  • General

    Floor

    Jul 18, 2013 · Apt 5W

    Close
  • Paint/plaster

    Wall

    Jul 18, 2013 · Apt 5W

    Close
  • Paint/plaster

    Wall

    Jul 18, 2013 · Apt 5W

    Close
  • Paint/plaster

    Window/frame

    Jul 18, 2013 · Apt 5W

    Close
  • General

    Mold

    Jul 18, 2013 · Apt 5W

    Close
  • General

    Mold

    Jul 18, 2013 · Apt 5W

    Close
  • General

    Cabinet

    Jun 19, 2013 · Apt 5W

    Close
  • General

    Windows

    Jun 19, 2013 · Apt 5W

    Close
  • Paint/plaster

    Wall

    Jun 19, 2013 · Apt 5W

    Close
  • General

    Floor

    Jun 19, 2013 · Apt 5W

    Close
  • Paint/plaster

    Wall

    Jun 19, 2013 · Apt 5W

    Close
  • General

    Doors

    Jun 19, 2013 · Apt 5W

    Close
  • General

    Doors

    Jun 19, 2013 · Apt 5W

    Close
  • General

    Mold

    Jun 19, 2013 · Apt 5W

    Close
  • Heating

    Heat related

    Feb 4, 2009 · Apt 4W

    Close
  • Plumbing

    Basin/sink

    Jan 29, 2009 · Apt 4W

    Close
  • Plumbing

    Water-leaks

    Jan 29, 2009 · Apt 4W

    Close
  • Plumbing

    Water-leaks

    Jan 29, 2009 · Apt 4W

    Close
  • Plumbing

    Water supply

    Jan 29, 2009 · Apt 4W

    Close
  • Heating

    Heat related

    Jan 26, 2009 · Apt 4W

    Close
  • Plumbing

    Water-leaks

    Jan 20, 2009 · Apt 4W

    Close
  • Plumbing

    Water-leaks

    Jan 20, 2009 · Apt 4W

    Close
  • Heating

    Heat related

    Jan 20, 2009 · Apt 4W

    Close
  • Plumbing

    Water supply

    Jan 20, 2009 · Apt 4W

    Close
  • Plumbing

    Water supply

    Jan 19, 2009 · Apt 2E

    Close
  • Plumbing

    Water supply

    Jan 19, 2009 · Apt 5W

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S5)
Year built
1886
Floors
5
Residential units
6
Building area
4,465 ft²
Lot area
1,140 ft²
Zoning
C1-6A
Community board
102
Council district
3
Block / lot
640 / 39
Assessed value
$3,394,350
Landmark / historic district
Greenwich Village Historic District

HPD registration #119634, last renewed Sep 6, 2025.

Questions about 765 Washington Street

Who owns 765 Washington Street?

The owner of record in NYC Department of City Planning PLUTO data is Video Storyboard Test, INC..

Does 765 Washington Street have violations?

Yes. NYC HPD has recorded 82 housing violations at this property.

Is 765 Washington Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 765 Washington Street built?

City records list 1886 as the year it was built.

How many apartments are in 765 Washington Street?

It has 6 residential units and 7 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.