35 Perry Street is a walk-up apartment building built in 1855 in Manhattan, 10014. It has 6 residential units across 4 floors. The owner of record is 35 Perry St Owners Corp. HPD has recorded 29 housing violations here, most recently on April 29, 2026. 18 of the 29 most recent violations are still open.

HPD violations
29
DOB violations
30
ECB violations
22
HPD complaints
32

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Apr 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 29

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2024

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 15, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 15, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 2, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 16, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 16, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 25, 2019

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 9, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 6, 2017

    Closed — Violation dismissed
Show 19 more ↓
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 26, 2016

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 1, 2015

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective intercom system in the entrance located at apt 2f, 2nd story, 1st apartment from east at south

    Feb 15, 2012 · Apt 2F

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south

    Feb 15, 2012 · Apt 2F

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of slopping wood floor at public hall, 2nd story

    Feb 15, 2012

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of suit case and other household items at public hall, 4th story

    Feb 15, 2012

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of hat rack at public hall, 1st story

    Feb 15, 2012

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant ceiling at vestibule , 1st story

    Feb 15, 2012

    Open — Nov sent out
  • B

    Properly secure the loose handrail , 1st to 2nd sty at public hall stairs

    Feb 15, 2012

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color fire-retardant south wall 1st to 2nd sty at public hall stairs

    Feb 15, 2012

    Open — Nov sent out
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor

    Dec 19, 1986

    Open — Nov sent out
  • A

    D26-20.01 adm code provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door all stys all apts.

    Dec 19, 1986

    Open — Nov sent out
  • B

    D26-10.01 adm code replace with new the broken or defective hinges at cellar door to street.

    Dec 19, 1986

    Open — Nov sent out
  • B

    D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling public hall all stys.

    Dec 19, 1986

    Open — Nov sent out
  • B

    D26-10.01, 10.05 adm code remove all encumbrances consisting of wood and household items at 4th sty public hall scuttle ladder to roof.

    Dec 19, 1986

    Open — Nov sent out
  • A

    D26-11.01, 11.03, 11.05 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the roof at front.

    Dec 19, 1986

    Open — Nov sent out
  • A

    D26-10.01 adm code properly repair with similar material the broken or defective plaster at 4th sty public hall scuttle compartment.

    Dec 19, 1986

    Open — Nov sent out
  • A

    D26-21.07 adm code maintain on the premises a copy of the sprinkler tes t for the current year.

    Sep 13, 1979

    Open — Nov sent out
  • B

    D26-21.07 adm code seal in open position the o.s.y. valve of the sprinkler system in accordance with the rules and regulations of this department cellar at front.

    Sep 13, 1979

    Open — Nov sent out

DOB building violations · 30

  • Construction other optional

    Failure to maintain building in code compliant manner. observed spalling paint on cornice and step crack on exposure 1 south elevation remedy: repair and or replace

    Aug 7, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Sep 21, 2019

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Sep 21, 2019

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 4, 2019

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Sep 21, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 30, 2016

    Dob violation - dismissed
Show 20 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 30, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 30, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 30, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 30, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 30, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 30, 2016

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Sep 27, 2016

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Sep 27, 2016

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Sep 27, 2016

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Sep 27, 2016

    Dob violation - active
  • Landmark none

    Landmk-landmark none

    Sep 27, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 2, 2010

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Jun 22, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 1, 1994

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Aug 22, 1986

    Dob violation - dismissed
  • Landmark none

    Landmrk-landmark none

    Aug 22, 1986

    Dob violation - dismissed

ECB violations · 22

  • Class - 1

    Unsafe storage of combustible material & equipment @the time of inspection notice construction work in the cellar unit on expo 2 side of building however i observed a cumbustible cylinder not property incase

    Jun 5, 2019

    Resolve
  • Class - 2

    Bc3301.13.13.no construction superintendent logs.at time of inspection observed an active construction site with interior renovation work in progress.during inspection noted that the construction superintendien

    Jul 2, 2018

    Resolve
  • Class - 2

    Failure to provide approved plans on site at time of inspection observed an active construction site with interior renovation work in progress.during inspection noted that the approved plans were not on site as

    Jul 2, 2018

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction no guardrails.noted: nw steel staircases installed from 1st floor to 4th floor. guardrails were not installed. t 1st flr exposu

    Aug 29, 2016 · Penalty $2,400

    Resolve
  • Class - 1

    Unapproved/unsafe/unsuitable electrical equipment apparatus,materials,devices,appliances or wiring in use. noted: at time of inspection on 08/29/16, multiple open connection boxes with exposed wiring/bx/ronex

    Aug 29, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Plumbing work w/o a permit noted: removed all water and waste lines throughout premises at floors 1-3 and cellar.installed pvc 4"waste line at top floor to accommodate toilet for workers with water and sink

    Aug 29, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to have new or altered plumbing system tested.installed new water and waste lines throughout premises,requiring lines to be testedas per codes under application 122471262-01-pl,plumber failed to compl

    Aug 29, 2016 · Penalty $500

    Resolve
  • Class - 2

    Sec: bc 3309.3. failure to perform an insp & document conditions of existing structures adjoining a construction in demo site in a pre-construction survey. construction work was in progress & no pre-constructio

    Aug 29, 2016 · Penalty $800

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperations. noted: at floors 1-4 new decks are open.plywood walkways are unsecured,with openings creating multi floor fall hazardous condit

    Aug 29, 2016

    Resolve
  • Class - 1

    Work w/out a permit. the respondent undertook excavation work for horizontal extension @ exp#3 underpinning new foundation work & structuralsteel erection from the cellar up to the roof level w/out the necessar

    Aug 29, 2016 · Penalty $1,600

    Resolve
Show 12 more ↓
  • Class - 1

    Failure to notify the dob w/in 24 to 48 hours of the start if excavation. @ time of insp observed excavation work @ cellar level for horizontal extension, underpinning, & footing construction & the dob was not

    Aug 29, 2016 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements.noted: at cellar level at exp#3 numerous bags of debris piled 4'high.at floors 1-4 excessive debris,pipes,steel,timber,observed.housekeeping at

    Aug 29, 2016 · Penalty $2,400

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendmetns. noted: application #122471262 filed to remove interior partitions and closets at first floor, cellar apartment and to relocat

    Aug 29, 2016 · Penalty $1,000

    Active
  • Class - 1

    Failure to maintain bldg in code compliant manner. improper exit/exit access doorway arrangement per bc 1014;2, 27-361.noted: entrance door at exp#1 was sealed shut preventing safe and required egress of constr

    Aug 29, 2016 · Penalty $1,200

    Resolve
  • Class - 1

    Sec: bc 1704.1.1. failure to file a special insp statement of responsibility prior to permit issuance & prior to the start of work under special insp requirements. the respondent failed to file the tr1 for all

    Aug 29, 2016 · Penalty $800

    Resolve
  • Class - 2

    Sec: bc 1803.1. failure to protect an adjoining fooling on foundation (protection against settlement or lateral translation) affected by excavation operations. @ time of insp observed excavation work in progres

    Aug 29, 2016 · Penalty $800

    Resolve
  • Class - 2

    No plans on site. @ the time of insp the respondent could not provide approved plans for the support of excavation (underpinning, sheeting & shoring) demo & structural steel installation for new flr constructio

    Aug 29, 2016 · Penalty $500

    Resolve
  • Class - 2

    Sec: bc 3309.6. failure to monitor adjoining structures for movement in all direction during excavation related activity that may adversely affect adjoining structures. @ time of insp excavation work was ongoin

    Aug 24, 2016 · Penalty $800

    Resolve
  • Class - 2

    Work w/o a permit. noted: apt 3f has work being performed in bathroom.new wood frame sub flr being installed 2x4 wood studs being used. no permits on file. noted: previous violation issued for new electrical

    Aug 24, 2010 · Penalty $415

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner. noted: apt 2f & 3f have sloping flrs as well as 2nd & 3rd have sloping flrs as well as 2nd & 3rd flr hallways. unable to determine cause due to no access to

    Aug 24, 2010 · Penalty $265

    Resolve
  • Class - 1

    Work w.o a permit. noted: new bx electrical wiring ran for high hats, switches, outlets in apt 3f. no permit on file & unknown if work performed by licensed professional. remedy: obtain permit

    Aug 2, 2010 · Penalty $815

    Resolve
  • Non-hazardous

    Plumbing fixtire not properly trapped and/or vented use or installation of plumbing materials or equipment which do not comply with rs-16.observed a 3/4"union on the on the run of the gas line for a store in th

    Jul 4, 2005 · Penalty $5,000

    Resolve

Complaints

  • Construction

    Pavement

    Feb 8, 2012 · Apt 2F

    Close
  • Nonconst

    Signage

    Feb 8, 2012 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Feb 8, 2012 · Apt 2F

    Close
  • Plumbing

    Radiator

    Feb 8, 2012 · Apt 2F

    Close
  • Plumbing

    Water-leaks

    Feb 8, 2012 · Apt 2F

    Close
  • Electric

    Bell-buzzer/intercom

    Feb 8, 2012 · Apt 2F

    Close
  • Nonconst

    Smoke detector

    Feb 8, 2012 · Apt 2F

    Close
  • Nonconst

    Carbon monoxide

    Feb 8, 2012 · Apt 2F

    Close
  • Nonconst

    Rubbish

    Feb 8, 2012 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Feb 8, 2012 · Apt 2F

    Close
Show 22 more ↓
  • General

    Floor

    Feb 8, 2012 · Apt 2F

    Close
  • Nonconst

    Signage

    Feb 8, 2012 · Apt 2F

    Close
  • Nonconst

    Rubbish

    Feb 8, 2012 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Feb 8, 2012 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Feb 8, 2012 · Apt 2F

    Close
  • Nonconst

    Rubbish

    Feb 8, 2012 · Apt 2F

    Close
  • Construction

    Pavement

    Feb 8, 2012 · Apt 2F

    Close
  • General

    Windows

    Feb 8, 2012 · Apt 2F

    Close
  • Electric

    Lighting

    Feb 8, 2012 · Apt 2F

    Close
  • General

    Mailbox

    Feb 8, 2012 · Apt 2F

    Close
  • General

    Doors

    Feb 8, 2012 · Apt 2F

    Close
  • Nonconst

    Rubbish

    Feb 8, 2012 · Apt 2F

    Close
  • Electric

    Wiring

    Feb 8, 2012 · Apt 2F

    Close
  • General

    Stairs

    Feb 8, 2012 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Feb 8, 2012 · Apt 2F

    Close
  • Nonconst

    Rubbish

    Feb 8, 2012 · Apt 2F

    Close
  • Electric

    Wiring

    Feb 8, 2012 · Apt 2F

    Close
  • Heating

    Heat-plant

    Feb 8, 2012 · Apt 2F

    Close
  • General

    Doors

    Feb 8, 2012 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Aug 20, 2010 · Apt 3F

    Close
  • Heating

    Heat related

    Oct 18, 2003 · Apt 3F

    Close
  • Nonconst

    Smoke detector

    Apr 1, 2003 · Apt 3F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C6)
Year built
1855
Floors
4
Residential units
6
Building area
3,020 ft²
Lot area
1,271 ft²
Zoning
R6
Community board
102
Council district
3
Block / lot
613 / 37
Assessed value
$1,033,650
Landmark / historic district
Greenwich Village Historic District

HPD registration #134806, last renewed Oct 20, 2025.

Questions about 35 Perry Street

Who owns 35 Perry Street?

The owner of record in NYC Department of City Planning PLUTO data is 35 Perry St Owners Corp.

Does 35 Perry Street have violations?

Yes. NYC HPD has recorded 29 housing violations at this property.

Is 35 Perry Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 35 Perry Street built?

City records list 1855 as the year it was built.

How many apartments are in 35 Perry Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.