180 Christopher Street
Manhattan, NY 10014BBL 1-00604-0003Map
Owner of record: Bailey-Holt House HDFC
180 Christopher Street is a hospital / health built in 1920 in Manhattan, 10014. It has 48 residential units across 6 floors. The owner of record is Bailey-Holt House HDFC. HPD has recorded 89 housing violations here, most recently on August 24, 2026. 46 of the 50 most recent violations are still open.
- HPD violations
- 89
- DOB violations
- 60
- ECB violations
- 26
- HPD complaints
- 248
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 89
- CImmediately hazardous
Abate the infestation consisting of roaches at community kitchen, 5th story
Aug 24, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice at community kitchen, 5th story
Aug 24, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 312inf, 3rd story, 6th apartment from west at north
Aug 24, 2026 · Apt 312INF
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 312inf, 3rd story, 6th apartment from west at north
Aug 24, 2026 · Apt 312INF
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 312inf, 3rd story, 6th apartment from west at north
Aug 24, 2026 · Apt 312INF
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 312inf, 3rd story, 6th apartment from west at north
Aug 24, 2026 · Apt 312INF
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at community kitchen, 6th story
Jul 5, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at community kitchen, 6th story
Jul 5, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the 1st entrance from north located at b-room 305, 3rd story, 3rd b-room from east at south
Mar 28, 2026 · Apt 305
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 304, 3rd story, 2nd apartment from east at south
Nov 18, 2025 · Apt 304
Open — Notice of issuance sent to tenant
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 302, 3rd story, 1st apartment from south at west
Sep 4, 2025 · Apt 302
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 302, 3rd story, 1st apartment from south at west
Sep 4, 2025 · Apt 302
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq feet at south wall in the 1st room from north located at apt 511, 5th story, 5th apartment from south at west
Aug 11, 2025 · Apt 511
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at public hall, 6th story
May 7, 2025
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing door sweeper at entrance in the 1st room from north located at b-room 305, 3rd story, 3rd b-room from east at south
Dec 1, 2024 · Apt 305
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq ft at ceiling at public hall, 1st story original violation 17244470 issued 04-sep-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Sep 4, 2024
Open — Defect letter issued - BHazardous
Properly repair with similar material the broken or defective wood floor at public hall, 3rd story
Sep 4, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material ceiling at public hall, 3rd story
Sep 4, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story
Sep 4, 2024
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Sep 4, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material ceiling at public hall, 1st story
Sep 4, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Sep 4, 2024
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq ft at ceiling at public hall, 1st story
Sep 4, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material south wall and ceiling at public hall, 2nd story
Sep 4, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall and ceiling at public hall, 2nd story
Sep 4, 2024
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 208, 2nd story, 2nd apartment from west at north
Sep 4, 2024 · Apt 208
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroom located at apt 208, 2nd story, 2nd apartment from west at north
Sep 4, 2024 · Apt 208
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at east, north, and west walls in the bathroom located at apt 208, 2nd story, 2nd apartment from west at north
Sep 4, 2024 · Apt 208
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 208, 2nd story, 2nd apartment from west at north
Sep 4, 2024 · Apt 208
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from east located at apt 302, 3rd story, 1st apartment from south at west
Aug 3, 2024 · Apt 302
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroom located at apt 302, 3rd story, 1st apartment from south at west
Aug 3, 2024 · Apt 302
Open — Nov sent out - BHazardous
Replace with new the missing radiator cover at south wall in the room located at b-room 302, 3rd story, 1st b-room from west at north
Jul 19, 2024 · Apt 302
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the room located at b-room 302, 3rd story, 1st b-room from west at north
Jul 19, 2024 · Apt 302
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing kick stand at door in the 1st entrance from north located at b-room 302, 3rd story, 1st b-room from west at north
Jul 19, 2024 · Apt 302
Closed — Violation closed - BHazardous
Replace with new the missing radiator cover at south wall in the room located at b-room 302, 3rd story, 1st b-room from west at north
Jul 19, 2024 · Apt 302
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Jul 13, 2024
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 305, 3rd story
Jul 13, 2024 · Apt 305
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the carpeted floor at public hall, 4th story
Jul 4, 2024
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 3rd story
Jul 4, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Jul 4, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story
Jul 4, 2024
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches located at b-room 410, 4th story, 4th b-room from west at north
Jun 16, 2024 · Apt 410
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges. in the 1st entrance from north located at b-room 407, 4th story, 1st b-room from west at north
Dec 20, 2023 · Apt 407
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the bathroom located at b-room 208, 2nd story, 2nd b-room from west at north
Nov 13, 2023 · Apt 208
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking ceramic wall tiles at north in the bathroom located at b-room 208, 2nd story, 2nd b-room from west at north
Nov 13, 2023 · Apt 208
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at washbasin in the bathroom located at b-room 208, 2nd story, 2nd b-room from west at north
Nov 13, 2023 · Apt 208
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling at 2nd public hall from east, 1st story
Jul 31, 2023
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the 1st room from north located at b-room 308, 3rd story, 2nd b-room from east at south
May 23, 2023 · Apt 308
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north located at b-room 308, 3rd story, 2nd b-room from east at south
May 23, 2023 · Apt 308
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlet at south wall in the 1st room from north located at b-room 312, 4th story, 6th b-room from west at north
Mar 24, 2023 · Apt 312
Open — Nov sent out
DOB building violations · 60
- Construction other optional
Emergency work order due to the unsafe fire escape at real south facad is missing guard rails @ 3fl platform & is missing treads @ all stairs btwn platform.remedy:immediately hire 2/4 foi fire guards to repair fire escape u/direction lic design prof. file permit applic to dob within 2 bus days. photos to [email protected]
Nov 20, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed
Show 40 more ↓
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2020
Dob violation - resolved - Immediate emergency anythingoptional
Install approximately 26 linear feet sidewalk shed along west street & approximately 92 linear feet sidewalk shed along christopher street
Jan 8, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 22, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 22, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jul 1, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 4, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 15, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 8, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 8, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 29, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 27, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 27, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 23, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 24, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
ECB violations · 26
- Class - 2
At time of inspection i observed sidewalk shed in place at exposure #1 and 4 upon review the department records it shows that the sidewalk shed permit had expired since 05-23-2024
Mar 17, 2025 · Penalty $625
Active - Class - 2
Failure to comply with commissioner's order contained in summons #35680024y issued on 03/04/2024, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Feb 11, 2025 · Penalty $6,250
Active - Class - 2
At the time of inspection 5 story occupied building with sidewalk shed. i observed shed installed for pedestrian protection permit has expired since 5/23/2024 upon reviewing the department records.renew permit
Dec 12, 2024 · Penalty $1,250
Active - Class - 2
At the time of inspection i observed sidewalk shed for pedestrian protection permit has expired since 5/23/2024 upon reviewing the department records.renew permit as required.
Oct 1, 2024 · Penalty $1,250
Active - Class - 2
At time of inspection i observed sidewalk shed in place at exposure # 1 and 4 with an expired permit since 05-23-2024by comply with code
Jul 12, 2024 · Penalty $1,250
Active - Class - 2
Failure to maintain buildings exterior walls and/or appurtenances.at time of inspection i observed multiple locations with cracked stucco onexposure 1(north elevation).at exposure 2(east elevation)there are mul
Mar 4, 2024 · Penalty $1,250
Active - Class - 2
Failure to file acceptable amended cycle 8a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#816702.agg1:prior nov 37022202x under 28-302.5
Jan 16, 2024 · Penalty $10,000
Active - Class - 2
At time of inspection of a 7 storeys building i observed sidewalk shed installed on exposure # 1 and 4 upon review the department record it shows that sidewalk shed permit had expired since 12-21-2022by comply
May 15, 2023 · Penalty $1,250
Active - Class - 2
Observed sidewalk shed in place at expo # 01 & 04 . sidewalk shed permit # m00303668-sh expired on-12/21/2022 and no renewal in dob record.renew permit
Mar 17, 2023 · Penalty $10,000
Active - Class - 2
At time of inspection observed sidewalk shed in place at expo#-1-&4-,missing caps from the bolts at sidewalk shed can create hazardous conditon for pedestrion & damage mudsillscomply with code
Mar 17, 2023 · Penalty $10,000
Active
Show 16 more ↓
- Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control916702.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Active - Class - 2
At time of inspection observed sidewalk shed in place along christopher street & west street on expo # 01 & 04 with an active permit. sidewalk shed permit # m00303668-sh expired on 01/30/2021 and no renewal in
Nov 29, 2021 · Penalty $625
Resolve - Class - 2
Failure to file acceptable amended cycle 8a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #816702.remedy:file acceptable report.
Oct 8, 2021 · Penalty $1,250
Active - Class - 2
Temporary construction equipment on site-expired permit.note:at time of inspection on a 6 story building.upon review the department records i observed that the sidwalk shed permit had expired since 12/11/2019.r
Jan 29, 2020 · Penalty $6,250
Active - Class - 2
Pedestraiani protection does not meet code specification as per 3307.63.note:at time of inspeciton on a 6 story building i observed at expo#1&4 sidewalk shed in place not meet the code requirement of 5 feet ext
Jan 29, 2020 · Penalty $10,000
Active - Class - 1
Sec. 28-104.7 deficient sidewalk shed design. note: at time of inspection on a 6 sty bldg w/sidewalk shed in place at exp#1&4,i observed thedesign drawings for the shed refer to a 2010 local law of nyc & this
Jan 29, 2020 · Penalty $1,250
Active - Class - 2
Work does not conform to approved construction documents and or approved amendments.note:at time of inspection on a 6 storeys building with a sidewalk shed in place i observed the installation of the sidewalk
Jan 29, 2020 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order contained in summons/violation #39002860m issued on 5/11/19 and to file a cert.of correctionpursuant to 28-201.1 and 1rcny 102-01.no c of c on file.rem:comply wit
Jul 24, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to provide adequate safety measures such as shed,netting,etc where required to protect and secure public safety from documented unsafe facade as per 1rcny 103-04.noted: at time of inspection observ
May 29, 2019 · Penalty $12,500
Resolve - Class - 1
Failure to maintain building exterior walls/facade and appurtenances. expoure 1 north elevation: crack at bricks 3rd story . exposure 2 east elevation spalling bricks eroded mortar joints. remedy:
May 29, 2019 · Penalty $6,250
Resolve - Class - 1
Oath violation written for 3-stone lintels are disrepair, cracked and spalled in 2nd floor level at expo # 01. , maintain exterior building wall; provide overhead protection, obtain structural engineer's report
May 11, 2019 · Penalty $6,250
Resolve - Class - 2
19m07,17d06,39y02,32j01,71d06.19m:clip for eccentric roller missing on various floors(lubricate track & hangers).71d:light&guard(pit floor).32j:adjust (car) guide/roller shoes.
Jul 11, 2012
Resolve - Non-hazardous
Failure to provide approved plans at premises at time of inspection noted:no approved plans available under permit#102625740 work in progress at 1st floor a penthouse level
Jul 28, 2000
Resolve - Non-hazardous
Installation of mechanical equipment without first obtaining an equipment use work permit, location: roof two carrier a/c units. remedy: obtain a equipment permit.
Feb 2, 1998
Resolve - Non-hazardous
75u, 75 perform 5 year test, properly tag device and file elv3 form.
Mar 29, 1995
Resolve - Hazardous
Failure to provide approved plans at premises at time of inspection. remedy: provide approved plans
Sep 12, 1990 · Penalty $115
Resolve
Complaints
- Unsanitary condition
Pests
Oct 22, 2026 · Apt 404
Open - Unsanitary condition
Pests
Aug 12, 2026 · Apt 312INF
Close - Unsanitary condition
Pests
Aug 12, 2026 · Apt 312INF
Close - Unsanitary condition
Pests
Aug 9, 2026 · Apt 505
Close - Unsanitary condition
Pests
Aug 9, 2026 · Apt 505
Close - Unsanitary condition
Pests
Aug 9, 2026 · Apt 505
Close - Water leak
Heavy flow
Jun 24, 2026 · Apt 6THFLO
Close - Water leak
Slow leak
Jun 11, 2026 · Apt 305
Close - Water leak
Slow leak
May 29, 2026 · Apt 6THFLO
Close - Door/window
Door
May 11, 2026 · Apt 305
Close
Show 40 more ↓
- Unsanitary condition
Mold
Apr 9, 2026 · Apt 307
Close - Heat/hot water
Apartment only
Apr 6, 2026 · Apt 205
Close - Heat/hot water
Apartment only
Apr 4, 2026 · Apt 305
Close - Heat/hot water
Apartment only
Mar 30, 2026 · Apt 305
Close - Heat/hot water
Apartment only
Mar 29, 2026 · Apt 305
Close - Heat/hot water
Apartment only
Mar 27, 2026 · Apt 305
Close - Heat/hot water
Apartment only
Mar 25, 2026 · Apt 305
Close - Water leak
Heavy flow
Feb 28, 2026 · Apt 305LEA
Close - Paint/plaster
Ceiling
Feb 28, 2026 · Apt 305LEA
Close - Unsanitary condition
Garbage/recycling storage
Feb 2, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 1, 2026 · Apt 305
Close - Heat/hot water
Apartment only
Nov 17, 2025 · Apt 304
Close - Heat/hot water
Apartment only
Nov 16, 2025 · Apt 305
Close - Unsanitary condition
Pests
Nov 6, 2025 · Apt 304
Close - Heat/hot water
Apartment only
Oct 28, 2025 · Apt 305
Close - Unsanitary condition
Pests
Oct 14, 2025 · Apt 312
Close - Unsanitary condition
Mold
Jul 31, 2025 · Apt 511
Close - Heat/hot water
Entire building
May 10, 2025 · Apt BLDG
Close - Paint/plaster
Ceiling
Apr 28, 2025 · Apt 305
Close - Water leak
Heavy flow
Apr 12, 2025 · Apt 305
Close - Water leak
Heavy flow
Apr 11, 2025 · Apt 305
Close - Water leak
Slow leak
Apr 5, 2025 · Apt 305
Close - Water leak
Slow leak
Apr 5, 2025 · Apt 511
Close - Unsanitary condition
Pests
Apr 5, 2025 · Apt 511
Close - Water leak
Damp spot
Mar 28, 2025 · Apt 6THFLO
Close - Paint/plaster
Ceiling
Mar 28, 2025 · Apt 6THFLO
Close - Water leak
Slow leak
Mar 23, 2025 · Apt LOBBYO
Close - Water leak
Slow leak
Mar 23, 2025 · Apt LOBBYO
Close - Paint/plaster
Ceiling
Mar 23, 2025 · Apt LOBBYO
Close - Water leak
Slow leak
Mar 7, 2025 · Apt 302
Close - Unsanitary condition
Pests
Mar 7, 2025 · Apt 302
Close - Water leak
Slow leak
Feb 27, 2025 · Apt 305
Close - Water leak
Slow leak
Feb 16, 2025 · Apt 305
Close - Door/window
Door
Feb 3, 2025 · Apt 302
Close - Door/window
Door
Feb 3, 2025 · Apt 302
Close - Door/window
Door
Feb 3, 2025 · Apt 302
Close - Door/window
Door
Jan 29, 2025 · Apt 302
Close - Heat/hot water
Entire building
Dec 2, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2024 · Apt 305
Close - Heat/hot water
Entire building
Dec 1, 2024 · Apt 305
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hospital / health (I7)
- Year built
- 1920
- Floors
- 6
- Residential units
- 48
- Building area
- 18,190 ft²
- Lot area
- 3,637 ft²
- Zoning
- C1-6A
- Community board
- 102
- Council district
- 3
- Block / lot
- 604 / 3
- Assessed value
- $2,524,050
- Landmark / historic district
- No
HPD registration #137240, last renewed Jun 18, 2025.
Questions about 180 Christopher Street
Who owns 180 Christopher Street?
The owner of record in NYC Department of City Planning PLUTO data is Bailey-Holt House HDFC.
Does 180 Christopher Street have violations?
Yes. NYC HPD has recorded 89 housing violations at this property.
Is 180 Christopher Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 180 Christopher Street built?
City records list 1920 as the year it was built.
How many apartments are in 180 Christopher Street?
It has 48 residential units and 49 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.