121 Leroy Street
Manhattan, NY 10014BBL 1-00602-0077Map
Owner of record: 121 Leroy Street LLC
121 Leroy Street is an one-family home built in 2017 in Manhattan, 10014. It has 1 residential unit across 4 floors. The owner of record is 121 Leroy Street LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 1
- ECB violations
- 14
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed
ECB violations · 14
- Class - 1
Failure to maintain/display on site documents required by bc chapter33(temporary platform)at the time of my inspeciton on an active job sitei observed on the 5th fl level staircase at expo#3 within the building
Jun 10, 2020 · Penalty $2,530
Resolve - Class - 1
Unsafe storage of combustable material and equipment.at the time of myinspection on an active job site.i observed in the foyer of the 1st fllevel a large gas cylinder containing compressed nitrogen on its label
Jun 10, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to provide approved/accepted construction documents at job site at time of inspection. nb job #122622956 at the time of inspection failed to provide a complete set of construction documents. no en docum
Jun 4, 2018 · Penalty $1,250
Resolve - Class - 2
Bc 3301.7 failure to provide p.e approved design drawings as noted:@time of insp,active site,4 story bldg,i observed dully system installed @4th fl w/chains (multi steel chains) fixed @steel beam @ 4th fl w/cha
Apr 18, 2018 · Penalty $3,125
Resolve - Class - 1
Sec. 3301.2 uncapped rebars. at time of inspection observed uncapped rebars at several locations(2nd & 3rd fl)this condition of uncapped rebars creates a hazard condition for persons present. remedy: provide ma
Dec 7, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety measure at job site.(no guardrail)at time of inspection observed active job site. the guardrail syste, along the perimeter edge of the bldg on the roof level construction in
Dec 7, 2017 · Penalty $1,200
Resolve - Class - 2
Sec. 3301.2 signs failure to maintain. at time of inspection observed that floor section signs,stair signs,no smoking signs. has not been maintained 1st fl to roof. creating a hazard for persons. rmeedy: provid
Dec 7, 2017 · Penalty $400
Resolve - Class - 1
Sec. 3310.3 site safety plan program. at the time of my inspection of a 4 sty bldg,construction work in progress. i observed that conditionsinside job site enclosed by the some construction job fence,wer not in
Nov 25, 2017 · Penalty $1,600
Resolve - Class - 1
Sec. 3308.5 vertical safety netting system. at the time of my inspection of a new 3 sty bldg construction work in progress. i observed that the vertical safety netting system,provided was inadequate,presenting
Nov 25, 2017 · Penalty $1,600
Resolve - Class - 1
Sec. 3308.5 vertical safety netting system. at the time of the inspection of a new 4 sty bldg,construction work in progress. i observed thatvertical safety netting system provided was inadequate presenting loos
Nov 25, 2017 · Penalty $1,600
Resolve
Show 4 more ↓
- Class - 1
Failure to institute & maintain safety equipment measures & temporary construction. at the time of my inspection of a new 4 sty bldg at roof level,construction work in progress. i observed opening on the wall
Nov 25, 2017 · Penalty $10,000
Resolve - Class - 1
Construction super fails to maintain and/or make jobs site logs available. at time of inspection of a 4 story steel framed building under construction at 4th fl level, active job site,upon request for the daily
Sep 25, 2017 · Penalty $400
Resolve - Class - 1
Failure to safeguard all persons affected by construction operations:no rebar cap. at time of inspection of a 4 story street framed buildingunder construction at 4th fl level, active job site. i observed that t
Sep 25, 2017 · Penalty $5,000
Resolve - Class - 1
Bc3316.9.2 no 16/32 hour rigging certs for personnel working with rigging equipment when hosting outside of a bldg.while performing audit inspection on cd#3630 a 50 ton max capacity crane was being operated
Aug 22, 2017 · Penalty $4,000
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- One-family home (A4)
- Year built
- 2017
- Floors
- 4
- Residential units
- 1
- Building area
- 3,179 ft²
- Lot area
- 1,738 ft²
- Zoning
- M1-5/R7X
- Community board
- 102
- Council district
- 3
- Block / lot
- 602 / 77
- Assessed value
- $228,240
- Landmark / historic district
- No
Questions about 121 Leroy Street
Who owns 121 Leroy Street?
The owner of record in NYC Department of City Planning PLUTO data is 121 Leroy Street LLC.
Does 121 Leroy Street have violations?
NYC HPD has no housing violations on record for this property.
Is 121 Leroy Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 121 Leroy Street built?
City records list 2017 as the year it was built.
How many apartments are in 121 Leroy Street?
It has 1 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.