80 Clarkson Street
Manhattan, NY 10014BBL 1-00596-0030Map
Owner of record: Aci Vi Clarkson LLC
80 Clarkson Street is an elevator apartment building built in 2024 in Manhattan, 10014. It has 131 residential units across 38 floors. The owner of record is Aci Vi Clarkson LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 0
- ECB violations
- 22
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 0
No DOB violations on record
ECB violations · 22
- Class - 2
A worker injured his right foot during granite stone slab lifting and installation operations. inspection revealed an unstable ground surface, a missing stabilizer leg, and improper equipment operation failing
Sep 2, 2026 · Penalty $5,000
Active - Class - 1
At time of inspection, observed temporary jet-fuel heater exhaust/ventilation ductwork installed along exterior facade at exp. 3 adjacent to personnel/material hoist. installation routing, anchoring, and elevat
Mar 4, 2026 · Penalty $5,000
Resolve - Class - 1
At time of inspection, observed two sunbelt boom lifts operating at exp. 1. one boom lift positioned adjacent to rope tied to crane obstructing the lift work area creating hazard to workers. no controlled acces
Mar 4, 2026 · Penalty $5,000
Resolve - Class - 2
In responds to an incident where a worker fell approximately 9 feet from the 40th floor to the 39th floor while coming down a wooden ladder the ambulance was call. i observed inadequate housekeeping on the 39th
Jul 2, 2025 · Penalty $1,250
Resolve - Class - 2
38 story nb approx. 42,682 sq ft' i walked around entire site observed 3guards on site. when asked for their valid security guard registration. none was provided. as per b.c 3303.3 a competent watchperson shall
Apr 12, 2025
Resolve - Class - 2
At east tower 6 story observed worker using makeshift motor table saw.upon request manufacture specs per bc3301.1.3 and pe design drawings per bc3301.6 failed to provide created hazard of unknown conformance to
Apr 3, 2025
Resolve - Class - 2
At 15 story corner exp1,2 east tower several reshore jack not secure to ceiling concrete slab.bc3305.3.6.1.2 stipulates reshores within 10 feet of unenclosed perimeter of building shall be secured prevent falli
Apr 3, 2025
Resolve - Class - 1
3301.1.1 - responsibility for safety atoi no fall protection or caz at approx. 17th-18th floor exp #2 which is roof level exp #3 of 570 washington st where there is approx a 1 foot gap between both sites. stop
Mar 21, 2025
Resolve - Class - 2
In response to an incident where a worker got his finger injured during pipe installation using hand chain hoists, inspection reveals 2 chain hoists was suspended and connected with strap to a 2' make shift pi
Mar 13, 2025
Resolve - Class - 2
Incident where a worker got his index finger caught in between 6"by10' pipe clamp and support and got injured during pipe installation using hand chain hoist for hoisting ambulance was called, failure to mainta
Mar 13, 2025
Resolve
Show 12 more ↓
- Class - 1
While supervising the 2 tower cranes as they were climbing from the same elevation from phase 2 into phase 3 and being 3' apart the 2 cranes struck each other causing significant damage to the rear deck guard r
Mar 9, 2025 · Penalty $10,000
Active - Class - 1
The crane user winco did not have the proper safe guards in place,while the 2 tower cranes were climbing from the same elevation from phase 2 into phase 3 and being 3' apart the 2 cranes struck each other causi
Mar 9, 2025 · Penalty $12,500
Resolve - Class - 1
At the time of inspection, observed workers on ladders not tied off near leading edges, in violation of bc 3301.2. this condition poses a significant fall hazard to workers and increases the risk of injury or f
Feb 21, 2025
Resolve - Class - 1
At the time of inspection, observed inadequate and missing guardrail systems throughout. in violation of bc 3301.2, which mandates contractors, construction managers, and subcontractors to implement and maintai
Feb 21, 2025 · Penalty $5,000
Resolve - Class - 2
Observed multiple floors with inadequate housekeeping on eastern tower 11-13 floors. excessive materials and construction debris displacing reshore and obstructing egress.maintain adequate housekeeping
Feb 14, 2025
Resolve - Class - 2
At time of inspection, multiple egress ladders were observed not extending as required by bc 3303.6.1.1. ladders must extend 3 feet above the floor where concrete is being placed, creating fall hazards due to i
Jan 13, 2025
Resolve - Class - 1
At time of inspection, a worker was observed on an unstable makeshift platform (1 plank between an a-frame ladder and unsecured staircase step, bc 3314.5.7). missing toe boards throughout building's leading edg
Jan 13, 2025 · Penalty $5,000
Resolve - Class - 2
I observed a sidewalk shed at a proposed 35 story building. i noticed sidewalk doesnt meet section 3307.6.5.6 sharp edges. i noticed screws bolts with exposed edges without any cover. this can result in a pede
Dec 19, 2024
Resolve - Class - 2
At a proposed 35 story with construction fence.i noticed a construction door not as per code swing outwards towards the public not recessed into construction site, also door swings out encroaching sidewalk pede
Dec 19, 2024
Resolve - Class - 2
At a proposed 35 story building at 8th fl.i noticed workers coming in and out from storage area with crane operation, stripping operation above.failure to provide safety measures for workers no overhead protect
Dec 19, 2024
Resolve - Class - 2
Atoi observed 38 stories nb on 5th fl pour requested approved arch plan not provided and en wasn't have insufficient clear information. as per ll149 after insulation foundation wall., maintain/display required
Nov 22, 2024
Resolve - Class - 1
At time of inspection, an active jobsite was observed with an inadequate guardrail system throughout, with missing toe boards and mid-rails at multiple locations, in violation of bc 3308.7.1. this creates a haz
Oct 17, 2024
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2024
- Floors
- 38
- Residential units
- 131
- Building area
- 604,767 ft²
- Lot area
- 44,019 ft²
- Zoning
- C6-4
- Community board
- 102
- Council district
- 3
- Block / lot
- 596 / 30
- Assessed value
- $28,764,900
- Landmark / historic district
- No
Questions about 80 Clarkson Street
Who owns 80 Clarkson Street?
The owner of record in NYC Department of City Planning PLUTO data is Aci Vi Clarkson LLC.
Does 80 Clarkson Street have violations?
NYC HPD has no housing violations on record for this property.
Is 80 Clarkson Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 80 Clarkson Street built?
City records list 2024 as the year it was built.
How many apartments are in 80 Clarkson Street?
It has 131 residential units and 137 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.