797 Broadway
Manhattan, NY 10003BBL 1-00562-0024Map
Owner of record: Weisshorn Re 799 Broadway LLC
797 Broadway is an office building built in 2019 in Manhattan, 10003. The owner of record is Weisshorn Re 799 Broadway LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 27
- ECB violations
- 13
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 27
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2022
Apr 22, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 17, 2019
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2017
Dob violation - resolved
Show 17 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 4, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 7, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 7, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 13, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 26, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 26, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2004
Dob violation - resolved - Elevator elevatorrequired
43)repair or renew the guide shoe's
Nov 7, 1988
Dob violation - resolved - Elevator elevatorrequired
43)repair or renew the guide shoe's
Nov 7, 1988
Dob violation - resolved - Elevator elevatorrequired
43-repair or renew the guide shoes
Nov 7, 1988
Dob violation - resolved - Elevator elevatorrequired
43-repair or renew the guide shoes
Nov 7, 1988
Dob violation - resolved
ECB violations · 13
- Class - 1
Failure to comply w/manufacturer specifications. note: at time of inspection of a 12 sty new bldg at roof level w/finishing activities in progress,i observed a worker(joaquin a morrobel)doing some overhead elec
Sep 27, 2021 · Penalty $2,500
Resolve - Class - 2
Bc 3309.1 failure to protect adjoining structures(general).noted:at time of my inspection of a new 12 story building construction in progress building topped off i observed 3 suspended scaffold rigs at exposure
Jun 2, 2021
Resolve - Class - 2
2113.1.6.1 responsibility of owner of taller building-chimney.noted:attime of my inspection of a new 12 story building construction in progress building topped off i observed the adjoining property at exposure#
Jun 2, 2021
Resolve - Class - 2
Construction documents shall show correct info fgc 106.7 all controls to be wired at time of inspection mc 1004.2 electrical boxes shall be maintained for which the were installed fgc 102.3; mc- misc, comply wi
Apr 19, 2021
Resolve - Class - 2
Bc 3307.1 failure to renew dot permits for temporary construction equipment in roadway.at the time of inspection i observed.this was proposed 12 story construction site.working on super structure of the buildin
Jan 6, 2021
Resolve - Class - 1
Failure to comply with manufacturer specification at time of my inspection of an active jobsite with 12 story topped off.i observed that workers at roof level are using concrete anchorage connectors for fall pr
Nov 6, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to maintain vertical safety netting system-debris netting at time of inspection in response to complaint of debris falling from construction site,i observed the vertical safety netting system in place
Aug 15, 2020 · Penalty $625
Resolve - Class - 1
Bc3309.14=protection of adjoining properties windows noted at time of inspection of a new 12 storie building at groun dlevel construction in progress i observed the windows of the adjoining property () the iste
Nov 21, 2019
Resolve - Class - 2
Bc3301,1,2=construction operatiosn shall be conducted in conformance of teh n.y.c fire code monthly checks noted at time of my inspetcion o f a new 12 storie building at rgound level construction operatiosn i p
Nov 21, 2019
Resolve - Class - 2
Failure to safeguard all persons and property affected by construction operations. at time of my inspection of an active demolition jobsite, i observed demolition operation in progress. i also observed damaged
Mar 27, 2019
Resolve
Show 3 more ↓
- Class - 2
Failure to file annual certification that cooling tower 1000002793 hasbeen inspected,tested,and disinfected and that a maintenance plan has been developed and implemented,by november,1,2016.rem:file annual cert
Jun 20, 2017 · Penalty $10,000
Resolve - Non-hazardous
Work without a permit-work noted:installed an a/c unit a roof center north without first obtaining permits and approvals as required by this department.remedy:remove or legalize.
Sep 1, 2004 · Penalty $250
Resolve - Non-hazardous
73x10, 73x restore device back to service for proper inspection.
Aug 10, 1998 · Penalty $180
Resolve
Complaints
- Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 22, 2008 · Apt 23
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O6)
- Year built
- 2019
- Floors
- 12
- Residential units
- —
- Building area
- 149,211 ft²
- Lot area
- 19,575 ft²
- Zoning
- C6-1
- Community board
- 102
- Council district
- 2
- Block / lot
- 562 / 24
- Assessed value
- $44,924,850
- Landmark / historic district
- No
Questions about 797 Broadway
Who owns 797 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Weisshorn Re 799 Broadway LLC.
Does 797 Broadway have violations?
NYC HPD has no housing violations on record for this property.
Is 797 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 797 Broadway built?
City records list 2019 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.