110 Waverly Place
Manhattan, NY 10011BBL 1-00552-0053Map
Owner of record: Unavailable Owner
110 Waverly Place is a mixed residential and retail building built in 1826 in Manhattan, 10011. It has 2 residential units across 4 floors. The owner of record is Unavailable Owner. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 12
- ECB violations
- 19
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 12
- Landmark none
Landmk-landmark none
Apr 22, 2025
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 15, 2013
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Landmark none
Landmk-landmark none
Apr 28, 2004
Dob violation - dismissed - Landmark none
Landmk-landmark none
Apr 28, 2004
Dob violation - dismissed - Landmark none
Landmk-landmark none
May 30, 2001
Dob violation - dismissed
Show 2 more ↓
- Landmark none
Landmk-landmark none
Apr 30, 1999
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 22, 1998
Dob violation - dismissed
ECB violations · 19
- Class - 1
Atoi, at premises, an occupied landmarked mixed use multiple dwelling, observed installation of hvac unit on structural steel at roof, without mechanical permit, obtain permit; stop all mechanical work at roof
Apr 8, 2025 · Penalty $6,250
Resolve - Class - 2
Observed on the second floor storage in the boiler room. also hot water heater is not giving access to the other gas appliances for any replacement and repairs which is contrary to code sections fgc 306.1 and f
Dec 3, 2024 · Penalty $1,562
Resolve - Class - 2
Found ao smith (model# hw 300) gas fired boiler o n 2nd flr not registered correct violating condition submit certificate of correction
Nov 4, 2024 · Penalty $1,562
Resolve - Class - 2
28-116.4.1 operating hvac system w/o first obtaining cert of compliance (eup).note:1.all the req equip use permits are not onfile for all 8 havc units located @roof @front of bldg.job #102702522.2.existing equi
Jan 9, 2014 · Penalty $800
Resolve - Class - 2
Fail submit req report of crit exam documenting exterior wall.note:job #102702522 & the alteration removal and/or addition to hvac equip located @roof.in tech rpt #1,the req noise control test has never been pe
Jan 9, 2014
Resolve - Class - 1
Occupancy contrary to that allow by the c of o #102702522f defects noted: cellar in being used as a work place: prep kitchen w/a sink cultrytable & also an (oven). c of o states storage only. remedy: discontinu
Aug 20, 2013 · Penalty $2,400
Resolve - Class - 2
Work w/o a permit. work noted: having moved ac units from 2nd flr set back rooff to 4th flr. no permits and file appl does not show where moved to job #120324443. remedy: obtain all permits and/or approvals.
Jun 10, 2013 · Penalty $800
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendment defects noted:exhaust to roof doesn't conform as per approved plan states 7'from roof.rmdy: conform to approved documents or am
Jun 3, 2013 · Penalty $530
Resolve - Non-hazardous
B4a32a,50,50abc.50-fresh air fan to boiler room cloged with debris,also missing ar proving switch inter locked with both boilers.50a-draft inducer on aosmith boiler missing, draft proving switch.50b-storage,
May 21, 2007 · Penalty $180
Resolve - Hazardous
Failure to file tri prior to start of controlled work noted underpinning in progress at east rear wall of 110 waverly pl under appl#103840934 exp 1.1.06 remedy:stop all work except to make area safe file
May 16, 2005 · Penalty $180
Resolve
Show 9 more ↓
- Hazardous
4a,34a,50,36,38. 50) safety valve must be installed in a vertical position. 36) a.o. smith boiler
Jun 27, 2003
Resolve - Non-hazardous
No equipment use permit: noted: 2ac units in rear set back roof (1)york modelt090n205g serial# nmfm131540 (2)york model #d4cg120n002sj sa serial#nchmo32194. there units don't reflect equipment use cards under
Jul 2, 2001 · Penalty $150
Resolve - Non-hazardous
Operation of a place of assembly with out a current permit.noted:said premises known as "babbo" which is a rest has a total number of seats of 90.remedy:obtain p.a. permit.
Jun 21, 2001 · Penalty $500
Resolve - Non-hazardous
Altered bldg occupied without valid certificate of occupancy. noted: said premises under alt 1 #102702522, 1st floor commercial space. upper floors residential renovation on 2nd floor. remedy: obtain valid c
Jun 21, 2001
Resolve - Non-hazardous
Work does not conform to approved plans. noted:at 3rd floor level hounortal and nestical stwetinal steel for 4th floor frame & installed contiong to approved plans. stanped 6/12/00 prof. cert orche16230-1 permi
Jul 12, 2000 · Penalty $130
Resolve - Non-hazardous
Peration of a place of assembly without a current p.p permit.noted:no valid p.a permit available for 1 st-2 fl level restaurant/bar seating arranged approx.100 persons.premises is not in code complance for ligh
Jun 12, 2000 · Penalty $200
Resolve - Non-hazardous
Operation of a place of assembly without a current permit. noted: 1 fl& mezz has seating for approx 100 people; now occupied as a restaurantd.b.a. babbo. location: 1 fl & mezz. remedy: obtian a p.a. permit from
Feb 11, 1999 · Penalty $200
Resolve - Non-hazardous
Work does not confrom to approved noted: new skylight in progress and new steel columns and i beams erected at mezz ceiling supported at 1st floor level leading to mezz ceiling. location of bathroom at mezz cei
Apr 23, 1998 · Penalty $250
Resolve - Non-hazardous
Failure to provide approved plans at premises at time of inspection. noted: ceilings open and removed and new partition wall constructed. fired rated ceiling removed 10% work completed. location: 1 floor and me
Apr 6, 1998 · Penalty $125
Resolve
Complaints
- Appliance
Sprinker cert
Jul 26, 2004
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1826
- Floors
- 4
- Residential units
- 2
- Building area
- 5,676 ft²
- Lot area
- 2,138 ft²
- Zoning
- R7-2
- Community board
- 102
- Council district
- 2
- Block / lot
- 552 / 53
- Assessed value
- $827,820
- Landmark / historic district
- Greenwich Village Historic District
Questions about 110 Waverly Place
Who owns 110 Waverly Place?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 110 Waverly Place have violations?
NYC HPD has no housing violations on record for this property.
Is 110 Waverly Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 110 Waverly Place built?
City records list 1826 as the year it was built.
How many apartments are in 110 Waverly Place?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.