122 Waverly Place
Manhattan, NY 10011BBL 1-00552-0047Map
Owner of record: Sherman, John
122 Waverly Place is an one-family home built in 1835 in Manhattan, 10011. It has 1 residential unit across 5 floors. The owner of record is Sherman, John. HPD has recorded 95 housing violations here, most recently on April 17, 1999.
- HPD violations
- 95
- DOB violations
- 21
- ECB violations
- 5
- HPD complaints
- 7
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 95
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Apr 17, 1999
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system cellar door locked.
Apr 17, 1999
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1 sty public hall and on boiler room door.
Apr 17, 1999
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of toys furniture etc present 3 sty public hall.
Apr 17, 1999
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of bicycle present 2 sty public hall.
Apr 17, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant walls bulkhead to roof.
Apr 17, 1999
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant ceiling bulkhead to roof.
Apr 17, 1999
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the stair at bulkhead to roof.
Apr 17, 1999
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor 3 sty public hall.
Apr 17, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective roofing cement west parapet wall roof.
Apr 17, 1999
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective cement mortar joints east chimney roof.
Apr 17, 1999
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors door at bulkhead roof.
Apr 17, 1999
Closed — Violation dismissed - ANon-hazardous
Paint or post a sign indicating floors wall all stys public hall.
Apr 17, 1999
Closed — Violation dismissed - BHazardous
Properly secure the loose banister 1 to 2 sty public hall.
Apr 17, 1999
Closed — Violation dismissed - BHazardous
Replace with new the missing glass transom 5 sty 1 window from west.
Apr 10, 1999
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 2 fixture minimum 150 watts aggregate required.
Apr 10, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood trim over lintel at front entrance door and windows.
Apr 10, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective conc. exterior wall bldg front.
Apr 10, 1999
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of loose sheet metal on balcony at 5 sty front of bldg.
Aug 1, 1994
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar of premises.
Jun 22, 1993
Closed — Violation closed - BHazardous
Properly secure the loose wood treads 2 and 4 from top of cellar stairs.
Jun 22, 1993
Closed — Violation closed - BHazardous
Properly secure the loose wood balustade bottom of cellar.
Jun 22, 1993
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective west wall 3 sty public hall.
Jan 27, 1993
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective buzzer street door 1 sty to 4 sty northwest apt 4f. located at apt 4f
Jan 27, 1993 · Apt 4F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings 4 sty northwest apt 4f thru out. located at apt 4f
Jan 27, 1993 · Apt 4F
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in wasteline bathtub 4 sty northwest apt 4f bathroom. located at apt 4f
Jan 27, 1993 · Apt 4F
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet bathroom 3 sty northwest apt 3f. located at apt 3f
Jan 27, 1993 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling 3 sty northwest apt 3f bathroom. located at apt 3f
Jan 27, 1993 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling 3 sty northwest apt 3f bathroom. located at apt 3f
Jan 27, 1993 · Apt 3F
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective oven burner gas range 3 sty northwest atp 3f kitchen.
Jan 27, 1993
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of excessive dust dirty all stys public halls.
Jan 27, 1993
Closed — Violation closed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the human feces matter front areaway of building.
Jun 3, 1992
Closed — Violation closed - BHazardous
Properly repair the broken or defective paving cellar thru out.
Jun 3, 1992
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarded ceilings and walls thru out cellar.
Jun 3, 1992
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color soffit 2 sty public hall stairs er1.
May 11, 1992
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color kitchen ceiling 1 sty west apt 1r er1. located at apt 1r
May 11, 1992 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & east wall at bathroom 1 sty west apt 1r. located at apt 1r
May 11, 1992 · Apt 1R
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
May 18, 1990
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures 3 sty front apt 3a kitchen & bathroom. located at apt 3a
Aug 26, 1989 · Apt 3A
Closed — Violation dismissed - BHazardous
Provide hot water at all hot water fixtures 1 sty rear apt 1k kitchen & bathroom. located at apt 1k
Aug 26, 1989 · Apt 1K
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system cellar door locked.
Aug 26, 1989
Closed — Violation closed - BHazardous
Replace with new the broken or defective metal cornice 2 sty front of building.
May 4, 1989
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation cornice roof front.
May 4, 1989
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing.
May 4, 1989
Closed — Violation dismissed - BHazardous
D26-10.01 adm code properly secure the loose door rame to boiler room cellar.
May 4, 1989
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of exposed electrical wire ceiling north room 3 sty front apt 3a. located at apt 3a
May 4, 1989 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly secure the loose handrail 2 to 3 sty public hall stairs.
May 4, 1989
Closed — Violation closed - ANon-hazardous
D26-12.03 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint rear south fire escape all stys.
May 4, 1989
Closed — Violation dismissed - BHazardous
D26-10.01, 10.05 adm code arrange and make self-closing the doors entrance to 1 sty rear west apt.
May 4, 1989
Closed — Violation dismissed - BHazardous
D26-10.01, 10.05 adm code arrange and make self-closing the doors bulkhead at roof.
May 4, 1989
Closed — Violation dismissed
DOB building violations · 21
- Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 30, 2013
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 8, 2008
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Landmark none
Landmk-landmark none
Jan 6, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
Show 11 more ↓
- Construction other optional
C-construction other optional
Aug 15, 1996
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 15, 1996
Vpw-violation unserved ecb-work without permit-active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Landmark none
Landmk-landmark none
Mar 23, 1994
Dob violation - dismissed - Landmark none
Landmrk-landmark none
Mar 23, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Landmark none
Landmk-landmark none
Jul 24, 1985
Dob violation - dismissed
ECB violations · 5
- Non-hazardous
Failure to safeguard public & property affected by construction operations:noted/work in progress @ 122 waverly pl under appl. #104101874 exp. 2/2/07 brick is falling from fire place making hazardous condition
Jun 12, 2006
Resolve - Hazardous
Failure to safeguard public and property affected by construction operations noted removel of roof under job# 103584621 not covered causing water leaks into apts on 4th fl and 3rd floor front apartments occupie
Jun 23, 2004
Resolve - Non-hazardous
Work does not conofrm to approved plans non conforming work noted alt type 1 job # 103584621 plans show new roof joists at rear new plywood on existing front roof joists 4 existing joists is now shimmed with 2'
Jun 23, 2004 · Penalty $250
Resolve - Non-hazardous
Failure to provide approved plans at premises at time of inspection. job 3103584621 alt type 2. remedy: stop all work provide plans. except to close rook.
Jun 21, 2004 · Penalty $130
Resolve - Non-hazardous
Failure to maintain bldg. noted: cellar ceilings & walls has large openings & firestopping removed. boiler rm open & f,p,s,c required. cellar fl covered w/ garbage & debris. location: cellar.
Feb 19, 1998 · Penalty $180
Resolve
Complaints
- Plumbing
Water-leaks
Aug 16, 2004 · Apt BLDG
Close - Electric
Wiring
Jul 14, 2004 · Apt BLDG
Close - Electric
Wiring
Jul 14, 2004 · Apt BLDG
Close - Electric
Wiring
Jul 14, 2004 · Apt BLDG
Close - Electric
Wiring
Jun 21, 2004 · Apt 4-F
Close - Electric
Wiring
Jun 21, 2004 · Apt 4-F
Close - Plumbing
Water-leaks
Jun 17, 2004 · Apt 3F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- One-family home (A4)
- Year built
- 1835
- Floors
- 5
- Residential units
- 1
- Building area
- 7,920 ft²
- Lot area
- 2,144 ft²
- Zoning
- R7-2
- Community board
- 102
- Council district
- 2
- Block / lot
- 552 / 47
- Assessed value
- $1,535,880
- Landmark / historic district
- Greenwich Village Historic District
Questions about 122 Waverly Place
Who owns 122 Waverly Place?
The owner of record in NYC Department of City Planning PLUTO data is Sherman, John.
Does 122 Waverly Place have violations?
Yes. NYC HPD has recorded 95 housing violations at this property.
Is 122 Waverly Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 122 Waverly Place built?
City records list 1835 as the year it was built.
How many apartments are in 122 Waverly Place?
It has 1 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.