163 Bleecker Street
Manhattan, NY 10012BBL 1-00539-0039Map
Owner of record: 109 E 9th Street LLC
163 Bleecker Street is a store building built in 1892 in Manhattan, 10012. The owner of record is 109 E 9th Street LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 8
- ECB violations
- 24
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 8
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 10, 2024
Dob violation - dismissed - Structurally compromised building none
Failure to submit an acceptable inspectn rpt for structurally compromised bldg.
Sep 14, 2022
Dob violation - active - Construction other optional
Failure to comply with an order of the commissioner dob# 052421feu10202ik req'd that an application to repair the bldg by filed by august 1, 2021 and that repairs begin by september 1 2021 atoi, no filings in system @ the dept and no repairs have commenced remedy: comply with order #052421feu10202ik
Oct 14, 2021
Dob violation - active - Construction other optional
Failure to comply with an order of the commissioner dob# 052421feu10201ik req'd that an application for the emergency work be filed with (2) business days of the start of the work. atoi, no filing were made for the emergency work. remedy: comply with order #052421feu10201ik
Oct 14, 2021
Dob violation - dismissed - Construction other optional
Emerg work:bldg suferd dmg due fire 5/22/21.approx 2/3 roof burnd&colp 2fl.part 2fl@rear prtly colp&saggin int 1fl belw.intr brk walls&parpts crks&deter brck miss.colp roof&part 2fl framg unbrced@risk colp.furthr colp 2fl could destablz walls&cause colp.ownr immd retn nyspe& dob reg contr constrct brce&shor-stabl extr walls&fls.wrk perfm pe.rpts.file2d
May 24, 2021
Dob violation - dismissed - Construction other optional
Failure to maintain building safe condn:see dob vio# 052421feu10201ik for description of building and conditions.building is in process of being stabalized under referenced violation/order.owner to retain nys lic pe + dob reg contrctr to evalu entre bldg + repr undr permit.file applic for reprs by 8/1/21.begin wrk by 9/1/21.complt work by 4/1/22
May 24, 2021
Dob violation - active - Construction other optional
Due fire
May 22, 2021
Dob violation - active - Electric signs none
Es-electric signs none
Aug 22, 1990
Dob violation - active
ECB violations · 24
- Class - 2
At the time of my inspection oberved site failed to maintain construction fence @ exp. 1(bc 3307.7), no viewing was provided( 3307.7.3 viewing panels.)shall be provided in solid fences erected on or after july
Aug 16, 2026 · Penalty $1,000
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate correction with the department of buildings. remedy: file a certificate of correction.
Dec 17, 2025
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate correction with the department of buildings. remedy: file a certificate of correction.
Dec 17, 2025
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate correction with the department of buildings. remedy: file a certificate of correction.
Dec 17, 2025
Resolve - Class - 1
Observed active site upon request failed to display/present approve structural design drawings for new wood joist in cellar level & no neighbor's agreement for adjoining properties@ exp. 2,3,4 where erected sup
Sep 29, 2025 · Penalty $2,500
Resolve - Class - 1
Observed active site with erected supported scaffolding @exp. 1,2,3 contrary to approve plans eq.-103.01. only 1 fully plank deck allowed per plans on light-duty scaffold. all three supported scaffolds @ exp. 1
Sep 29, 2025 · Penalty $2,500
Resolve - Class - 1
Observed active site failed to install handrails leading to cellar and 4th floor stairwell that directly effects egress/ingress access for active workers, emt response unit, & city inspectors must institute han
Sep 29, 2025 · Penalty $2,500
Resolve - Class - 2
2 story alteration active jobsite. observed supported scaffolding on top of sidewalk shed & overhead protection in place at exp#1,2 approximately 46 ft in height.both are temporary construction equipment. upon
Apr 24, 2025 · Penalty $3,125
Resolve - Class - 2
Dob records does not show any active permit for construction fence on site. previous permit expired 02/12/2025. (bc 105.8.2)maintain temporary construction eq as per code.
Feb 13, 2025 · Penalty $3,125
Resolve - Class - 2
Proposed renovation of 2 story commercial building .observed active site cs present upon inspection was noted sws has been erected on exposure 1 upon review drawings was noted sws erected contrary to approved d
Jan 14, 2025
Resolve
Show 14 more ↓
- Class - 2
Cmu parapet wall at roof level at exposure two(2) does not conform to dd. wall does not run continuous, no dd reflecting the as built condition. stop all masonry work at exp 2, provide approve dd, and or engine
Nov 12, 2024 · Penalty $1,250
Active - Class - 2
Active working scaffold at exp 2 &3 not maintained, planks missing, not tied down, debris. stop all exterior work at exp 2 and 3. maintained scaffold as per code.
Nov 12, 2024 · Penalty $1,250
Resolve - Class - 2
Observed structural steel erection at 2nd floor was found to be contrary to dob approved drawings (s-301.00). on request to review tr-1 special inspection reports, paa documents none could be provided. .stop st
May 22, 2024
Resolve - Class - 2
Upon request and research through dob now; observed construction fence at exposure #1 was found to be installed without a permit.
Dec 21, 2023
Resolve - Class - 1
At time of inspection i observed sidewalk shed installed on exposure #1 with inoperable light bulbs at underside the shed to bring illumination failure to provide lighting creates unsafe and mugging condition
Nov 9, 2023
Resolve - Class - 2
At time of inspecton i observed sidewalk shed installed on exposure # 1 without signs or project information panel on the shed parapet, to display the name and the contact information of the owner or the gener
Nov 9, 2023 · Penalty $1,250
Resolve - Class - 2
At time of inspection observed job site fence at expos #1 with no permit on file.
Oct 26, 2023 · Penalty $1,250
Resolve - Class - 2
Observe sidewalk shed in place for 2 story building with no permit issued (only job# m00546610 filed) in departments records (bis/dob now) not compliant to code 28-105.1 and bc 3307.6.1for sidewalk shed.
Oct 16, 2023 · Penalty $1,250
Resolve - Class - 1
Licensed rigger failed to ensure scaffold worker met minimum requirments.note:@ time of insp following worker:roberto maldonado vergel working on suspended scaffold w/o cert of fitness issued by lic rigger.rem:
Jun 19, 2014 · Penalty $400
Resolve - Class - 1
1rcny 9-01 no designated forman on site.noted:@ time of insp no designated foreman on the site.job site is active.men working on suspended scaffold @ exp#3.rem:comply w/rule.
Jun 19, 2014 · Penalty $1,600
Resolve - Class - 2
Partial swo issued for work w/o permit pursuant 28-207.2 posted on prem.work w/o permit.noted:@ time of insp facade permit is exp on 6/14/14.job site is active.men working on suspended scaffold @ exp#3.stop all
Jun 19, 2014 · Penalty $400
Resolve - Class - 2
Failure to maintain bldg wall or appurtenances. noted: at time of inspection a pre-existing crack observed along exp #3 running vertically at first and second flrs. crack to be +/- 1 inch wide.exposure2 previo
Jul 30, 2013
Resolve - Non-hazardous
Work without a permit work noted exhaust duct and fan unit installed at roof of building sering 1 floor rest note exhaust not carried above adjacent 5 sty bldg as required by code. remedy obtin permits for duct
Mar 20, 1989 · Penalty $125
Resolve - Non-hazardous
Alterd building occupied without a valid c of o. remedy; obtain a c of o.
Jun 15, 1988 · Penalty $250
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K2)
- Year built
- 1892
- Floors
- 2
- Residential units
- —
- Building area
- 5,000 ft²
- Lot area
- 2,500 ft²
- Zoning
- R7-2
- Community board
- 102
- Council district
- 2
- Block / lot
- 539 / 39
- Assessed value
- $1,134,900
- Landmark / historic district
- South Village Historic District
Questions about 163 Bleecker Street
Who owns 163 Bleecker Street?
The owner of record in NYC Department of City Planning PLUTO data is 109 E 9th Street LLC.
Does 163 Bleecker Street have violations?
NYC HPD has no housing violations on record for this property.
Is 163 Bleecker Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 163 Bleecker Street built?
City records list 1892 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.