43 Bleecker Street
Manhattan, NY 10012BBL 1-00529-0062Map
Owner of record: 43 Bleecker LLC
43 Bleecker Street is an office building built in 1896 in Manhattan, 10012. It has 8 residential units across 6 floors. The owner of record is 43 Bleecker LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 71
- ECB violations
- 98
- HPD complaints
- 43
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 71
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 18, 2020
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 4, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 4, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 4, 2020
Dob violation - dismissed
Show 40 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 4, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 13, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 13, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 13, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 19, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 19, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2019
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2017
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 11, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Landmark none
Landmk-landmark none
Oct 27, 2016
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 19, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2016
Dob violation - resolved - Landmark none
Landmk-landmark none
Mar 14, 2016
Dob violation - dismissed - Landmark none
Landmk-landmark none
Mar 14, 2016
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 22, 2015
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 22, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 8, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 8, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2008
Dob violation - resolved - Landmark none
Landmk-landmark none
Oct 11, 2007
Dob violation - dismissed - Landmark none
Landmk-landmark none
Oct 11, 2007
Dob violation - dismissed - Landmark none
Landmk-landmark none
Oct 11, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 22, 2007
Dob violation - resolved
ECB violations · 98
- Class - 2
At the time of reinspection for summons ending in 0662z was cited for missing guard rails inside building, i observed job site padlock no access also no certificate of correction submitted or filed in departmen
Apr 17, 2026 · Penalty $1,250
Resolve - Class - 1
Bc 3309.1at inspection of a six-story building, unprotected adjoining property was observed at exp# 2. loose bricks were noted at the roof chimney above a neighboring deck with tables, chairs, and benches, with
Feb 20, 2026 · Penalty $10,000
Resolve - Class - 2
At the time of inspection of a six-story building, accumulated debris was observed throughout the interior, creating a fire hazard condition in violation of code. stop all work immediately on the entire job sit
Feb 20, 2026
Resolve - Class - 1
At the time of inspection of a six-story building undergoing alteration, work was observed from the basement level to the roof without required supervision and no designated superintendent on site. stop all wor
Feb 20, 2026 · Penalty $10,000
Resolve - Class - 2
At the time of inspection of a six-story building, temporary platforms were observed throughout the site. upon request, no approved design drawings were provided. cease all use of temporary platforms immediatel
Feb 20, 2026 · Penalty $1,250
Resolve - Class - 2
Bc3314.1at the time of inspection of a six-story building, a pipe scaffold within the elevator shaft was not maintained, with loose and unsecured planking not tied down, creating a hazardous condition to worke
Feb 20, 2026 · Penalty $2,500
Resolve - Class - 1
At inspection of a six-story building, inadequate guardrail was observed at elevator shaft openings from the basement through upper floors, including the roof, 3rd, 4th, and 5th floors, where work had occurred
Feb 20, 2026 · Penalty $5,000
Resolve - Class - 2
At the time of inspection of a six-story building, a pipe scaffold was observed in the elevator shaft from the basement to the 3rd floor, 47 feet in height. department records indicate no scaffold permit was o
Feb 20, 2026 · Penalty $1,250
Resolve - Class - 2
Observed a worker inside the site. upon banging on the door and the storefront window. worker looked in my direction. then proceed to walk away. eventually walking back towards my direction then walked up stair
Feb 17, 2026 · Penalty $2,500
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio# 39153109y for work against stop work order as
Oct 22, 2025 · Penalty $3,125
Resolve
Show 40 more ↓
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39153098h for failure to safe guard as of 10/22
Oct 22, 2025 · Penalty $3,125
Resolve - Class - 1
Work contrary to stop work order. at cellar level while on a stop work order for all cellar work, a worker using a sawzall during demolition cut 3 gas lines causing a gas leak throughout site. the stop work ord
Jul 8, 2025 · Penalty $10,000
Resolve - Class - 1
Failure to safefurad all persons and property affected by construction activity . at cellar level while performing demolition a worker cut through 3 gas lines causing a gas leak throughout site., safeguard publ
Jul 8, 2025 · Penalty $25,000
Resolve - Class - 1
Hoisting, lowering, hanging, or attaching of outdoor sign not performed or superviesd by a properly licensed sign hanger(burberry). remedy: obtain all licenses.
May 20, 2024
Resolve - Class - 1
Outdoor advertising company sign does not bear decal bearing ul classification mark or date of sign's erection.(burberry)rem:remove or legalize sign.
May 20, 2024
Resolve - Class - 1
Outdoor advertising company sign on display without a permit(burberry). remedy: obtain all required permits.
May 20, 2024
Resolve - Class - 1
Hoisting lowering,hanging or attaching of outdoor sign not performed or supervised by a properly licensed sign hanger.(burberry)rem:obtain all licenses.
May 20, 2024
Resolve - Class - 1
Outdoor advertising company sign on display without a permit(meetlalo.com). remedy: obtain all required permits.
May 20, 2024
Resolve - Class - 1
Outdoor advertising company sign on display without a permit(meetlalo.com)rem:obtain all required permits.
May 20, 2024
Resolve - Class - 1
Outdoor advertising company sign does not bear decal bearing ul classification mark or date of sign's erection(burberry). remedy: remove or legalize sign.
May 20, 2024
Resolve - Class - 1
Outdoor advertising company sign on display without a permit.(burberry)rem:obtain all required permits.
May 20, 2024
Resolve - Class - 1
Outdoor advertising company sign on display without permit(meetlala.com). remedy: obtain all required permits.
May 20, 2024
Resolve - Class - 1
Outdoor advertising company failure to have licensed sign hanger attach or erect sign.(spellbinding may dec1)rem:remove illegal sign.
Nov 24, 2023
Resolve - Class - 1
Outdoor advertising sign in m district exceeds surface area limits.(fendi roma)rem:remove illegal sign.
Nov 24, 2023
Resolve - Class - 1
Property owner acting as outdoor advertising company failure to obtainoac registration number while engaging in the outdoor advertising business.rem:remove illegal sign/register.
Nov 24, 2023
Resolve - Class - 1
Outdoor advertising company sign on display without a permit.(fendi roma)rem:remove illegal sign.
Nov 24, 2023
Resolve - Class - 1
Outdoor advertising company sign on display without a permit.(spellbinging may dec 1)rem:remove illegal sign.
Nov 24, 2023
Resolve - Class - 1
Outdoor advertising company failure to have licensed sign hanger attach or erect sign.(fendi roma)rem:remove illegal sign.
Nov 24, 2023
Resolve - Class - 1
Outdoor advertising company sign does not bear a decal bearing ul classification mark or date of sign's erection.(fendi roma)rem:remove illegal sign.
Nov 24, 2023
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
Feb 8, 2020 · Penalty $1,250
Resolve - Class - 1
42/m/5 no door lock monitoring missing perform & file test .64/m/7 nyc device # is not correct on elevator provide. 40/l/10 motor room light defective repair. 70/0/2 pit dirty clean.
Jan 7, 2020 · Penalty $1,250
Resolve - Class - 1
Work without permit.note:at time of inspection observed(2)bathrooms installed in public hallways on the 3rd floor with no permit filed for work that was performed. comply with notice of violation.
Dec 27, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in code compliant manner.note:at time of inspection, observed bathroom vents on 3rd floor,installed above bath room and kitchen ceiling of apartment 306 which is minimizing light co
Dec 27, 2019 · Penalty $1,250
Resolve - Class - 1
At time of inspection, on the sixth floor, observed excessive amounts of construction debris, creating a possible health issue, tripping & fire hazard., repair and/replace
Dec 11, 2019 · Penalty $3,125
Resolve - Class - 1
At time of inspection, on the sixth floor, observed construction work in progress contrary to active stop work orders. reference original complaint # 1519032, issued on 08-15-2019, comply with stop work order
Dec 11, 2019 · Penalty $12,500
Resolve - Class - 1
At time of inspection, on the sixth floor, observed plumbing work in progress contrary to active stop work orders. reference complaint # 1519141, issued on 08-16-2019, comply with stop work order
Dec 11, 2019 · Penalty $12,500
Resolve - Class - 1
At time of inspection, on the sixth floor, observed electrical work in progress contrary to active stop work orders. reference complaint # 1519142, issued on 08-16-2019, comply with stop work order
Dec 11, 2019 · Penalty $12,500
Resolve - Class - 2
Occupancy contrary to that allowed by the certificate of occupancy or buildings department records. noted, at the time of inspection observed the building occupied without valid c of o, however c of o # 1038285
Nov 14, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code compliant manner. noted, at the time of inspection observed no construction work in progress however observed in apt. # 603 a lot of construction debris all around and the f
Oct 12, 2019
Resolve - Class - 3
Failure to maintain building in code compliant manner. noted, at the time of inspection observed construction materials and carton boxes stored on the stairs between 4th. and 6th. floors., repair and or replace
Sep 28, 2019 · Penalty $250
Resolve - Class - 1
Failure to comply with an order of the commissioner. work against a stop-work order, at time of inspection out side the apartment 601 can hear the workers banging and ripping stuff down, knocked on door told
Sep 25, 2019 · Penalty $5,000
Resolve - Class - 2
At the 6th floor level in apartments 600-01-02-03, removed electrical wiring fixtures & devices leaving open live un capped wires throughout, creating a shock hazard., comply with ec
Aug 16, 2019
Resolve - Class - 1
At the 6th floor level in apartments 601-02-03, removed full height partitions throughout. there are no permits in dob, for this work., obtain permit
Aug 16, 2019 · Penalty $2,500
Resolve - Class - 2
At time of inspection construction debris & garbage bags were being stored throughout, creating a health, tripping & fire hazard through., maintain adequate construction housekeeping
Aug 16, 2019 · Penalty $625
Resolve - Class - 1
At the 6th floor level in apartments 600,601-602-603, removed existing electrical wiring, fixtures & boxes throughout. there are no permits in dob bis, for this work., obtain permit
Aug 16, 2019 · Penalty $1,600
Resolve - Class - 1
At the 6th floor level in apartments 600-01-02-03, removed plumbing fixtures & piping throughout. there are no permits in dob bis, for this work., obtain permit
Aug 16, 2019
Resolve - Class - 1
Work w/o a permit. i observed on apt 3rd and 4th flrs newley installedbathroom with new fixtures water and sanitary pipes and no permits on file for any work performed. work was 100% complete. *photos taken.
Jun 20, 2019
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. i observed in apt 306 pvc piping installed for kitchen and bathroom sinks (sanitary pipe) and pro vents (aka mechanical vents) used for venting both fixtures
Jun 20, 2019 · Penalty $1,250
Active - Class - 2
2x10,59bb7,99bb7; 2.x.10 outside comm inoperative,repair, 59.bb.7machine brake tag expired,provide, 99.bb.7one year tag bb provide.
May 7, 2019
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. no fire stopping per bc 712.3;27-345. noted: in apt#306 on 3rd fl observed no fire stopping material installed in the bathrooms ceiling the entire ceiling in
Aug 30, 2018 · Penalty $1,250
Resolve
Complaints
- Door/window
Window frame
Jul 27, 2016 · Apt 306
Close - Flooring/stairs
Floor
Jul 27, 2016 · Apt 306
Close - Water leak
Heavy flow
Jul 27, 2016 · Apt 306
Close - Plumbing
Basin/sink
Jul 27, 2016 · Apt 306
Close - Water leak
Heavy flow
Jul 27, 2016 · Apt 306
Close - Plumbing
Basin/sink
Jul 27, 2016 · Apt 306
Close - Plumbing
Toilet
Jul 27, 2016 · Apt 306
Close - Flooring/stairs
Floor
Jul 27, 2016 · Apt 306
Close - Plumbing
Water supply
Jul 27, 2016 · Apt 306
Close - Unsanitary condition
Pests
Jul 27, 2016 · Apt 306
Close
Show 33 more ↓
- Paint/plaster
Wall
Jul 6, 2016 · Apt 306
Close - Door/window
Door
Jul 6, 2016 · Apt 306
Close - Flooring/stairs
Floor
Jul 6, 2016 · Apt 306
Close - Plumbing
Basin/sink
Jul 6, 2016 · Apt 306
Close - Water leak
Heavy flow
Jul 6, 2016 · Apt 306
Close - Plumbing
Toilet
Jul 6, 2016 · Apt 306
Close - Plumbing
Basin/sink
Jul 6, 2016 · Apt 306
Close - Flooring/stairs
Floor
Jul 6, 2016 · Apt 306
Close - Unsanitary condition
Pests
Jul 6, 2016 · Apt 306
Close - Plumbing
Water supply
Jul 6, 2016 · Apt 306
Close - Plumbing
Bathtub/shower
Jun 27, 2016 · Apt 306
Close - Plumbing
Toilet
Jun 27, 2016 · Apt 306
Close - Plumbing
Basin/sink
Jun 27, 2016 · Apt 306
Close - Unsanitary condition
Pests
Jun 27, 2016 · Apt 306
Close - Unsanitary condition
Pests
Jun 27, 2016 · Apt 306
Close - Water leak
Damp spot
Jun 27, 2016 · Apt 306
Close - Flooring/stairs
Floor
Jun 27, 2016 · Apt 306
Close - Flooring/stairs
Floor
Jun 27, 2016 · Apt 306
Close - Paint/plaster
Wall
Jun 27, 2016 · Apt 306
Close - Plumbing
Basin/sink
Jun 27, 2016 · Apt 306
Close - Unsanitary condition
Pests
Jun 16, 2016 · Apt 306
Close - Plumbing
Basin/sink
Jun 16, 2016 · Apt 306
Close - Heat/hot water
Apartment only
Jun 16, 2016 · Apt 306
Close - Heating
Heat related
Nov 20, 2013 · Apt 306
Close - Paint/plaster
Ceiling
Jul 5, 2013 · Apt 306
Close - Plumbing
Toilet
May 15, 2013 · Apt 306
Close - General
Ventilation system
May 15, 2013 · Apt 306
Close - Nonconst
Carbon monoxide
May 15, 2013 · Apt 306
Close - Electric
Lighting
May 15, 2013 · Apt 306
Close - Paint/plaster
Wall
May 15, 2013 · Apt 306
Close - General
Floor
May 15, 2013 · Apt 306
Close - Electric
Lighting
May 15, 2013 · Apt 306
Close - Heating
Heat related
Feb 21, 2013 · Apt 306
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O5)
- Year built
- 1896
- Floors
- 6
- Residential units
- 8
- Building area
- 37,993 ft²
- Lot area
- 6,702 ft²
- Zoning
- M1-5/R7X
- Community board
- 102
- Council district
- 2
- Block / lot
- 529 / 62
- Assessed value
- $8,295,300
- Landmark / historic district
- NoHo East Historic District
Questions about 43 Bleecker Street
Who owns 43 Bleecker Street?
The owner of record in NYC Department of City Planning PLUTO data is 43 Bleecker LLC.
Does 43 Bleecker Street have violations?
NYC HPD has no housing violations on record for this property.
Is 43 Bleecker Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 43 Bleecker Street built?
City records list 1896 as the year it was built.
How many apartments are in 43 Bleecker Street?
It has 8 residential units and 15 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.