3 Bleecker Street
Manhattan, NY 10012BBL 1-00529-0043Map
Owner of record: Bowery Corner Owner LLC
3 Bleecker Street is a mixed residential and retail building built in 1869 in Manhattan, 10012. It has 3 residential units across 4 floors. The owner of record is Bowery Corner Owner LLC. HPD has recorded 32 housing violations here, most recently on August 19, 2026. 3 of the 32 most recent violations are still open.
- HPD violations
- 32
- DOB violations
- 3
- ECB violations
- 11
- HPD complaints
- 55
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 32
- BHazardous
Remove all encumbrances consisting of contruction materials at public hall, 1st story
Aug 19, 2026
Open — Nov certified on time - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130*f in the entire apartment located at apt 1b, 3rd story
Jan 20, 2023 · Apt 1B
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of construction material at public hall, 1st story
Jan 16, 2020
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 16, 2020
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 16, 2020
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jan 16, 2020
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at 1st story public hall and outside door of boiler room
Jan 16, 2020
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jan 6, 2020
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 6, 2020
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 6, 2020
Closed — Violation closed
Show 22 more ↓
- CImmediately hazardous
Replace with new the broken or defective air valve at radiator at public hall, 1st story
Jan 6, 2020
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balconies, and all components at fire escape
Jan 6, 2020
Open — Not complied with - CImmediately hazardous
Replace with new the broken or defective window glass lower window sash in the kitchen located at apt 1b, 2nd story, 1st apartment from north at east
Feb 12, 2018 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the limit of 130 degrees fahrenheit at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Feb 12, 2018 · Apt 1B
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 23, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 2, 2015
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective missing masonry lintel upper west corner above 2nd story east window south exterior wall of building. at front areaway
Feb 22, 2000
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening hasp and staple installed on door.. at public hall bulkhead, roof
Feb 22, 2000
Closed — Violation closed - BHazardous
Replace with new the missing latch assembly on door. at public hall bulkhead, roof
Feb 22, 2000
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of buckets, bicycles,wheels, shelves, newspaper 1st story at public hall
Feb 22, 2000
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling kitchen 3 sty apt 1b. , section '' ''
Jun 16, 1999 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cement ceiling bathroom 3 sty apt 1b , section '' ''
Feb 8, 1996 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls bathroom 3 sty apt 1b , section '' ''
Feb 8, 1996 · Apt 1B
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceilling northroom 3 sty apt 1b , section '' ''
Feb 8, 1996 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor kitchen 3 sty apt 1b , section '' ''
Feb 8, 1996 · Apt 1B
Closed — Violation closed - BHazardous
Properly secure the loose wood tread 6 from bottom 3 sty public hall stairs east bldg 3.
Aug 2, 1994
Closed — Violation closed - ANon-hazardous
D26-20.08,20.09 adm code file certification of satisfactory installation of smoke detecting device in accordance with h.p.d. rules and regulations.
Jul 22, 1994
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of concealed water leak wall & ceiling at bathroom 3 sty east apt 1b. , section '' ''
Aug 21, 1990 · Apt 1B
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of concealed water leak ceiling kitchen 3 sty east apt 1b. , section '' ''
Aug 21, 1990 · Apt 1B
Closed — Violation closed - BHazardous
Properly secure the loose chain southwest window south room 3 sty east apt 1b. , section '' ''
Aug 21, 1990 · Apt 1B
Closed — Violation closed - BHazardous
Replace with new the broken or defective glass bottom sash center window south room 3 sty east apt 1b. , section '' ''
Aug 21, 1990 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair the broken or defective glass bottom sash southeast window south room 3 sty east apt 1b. , section '' ''
Aug 21, 1990 · Apt 1B
Closed — Violation closed
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 12, 2000
Vw-violation work without permit - active
ECB violations · 11
- Class - 2
Failure to comply with commissioner's order contained in summons/violation #35250253h issued on3/12/18,& to file a cert. of correction pursuant to 28.201.1& 1rcny 102-01(d)(2).an acceptible cert.has not yet bee
Dec 17, 2018 · Penalty $625
Resolve - Class - 3
Failure to maintain bldg in code compliant manner. noted: at rear of building, on exterior wall observed downspout/rain drain pipe missing from 2nd flr up to roof level "apprx 20'l".rmdy: repair and replace
Mar 12, 2018 · Penalty $500
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. defects noted: at time of inspection work in bldg under jobappl #121371130 caused cracks in walls & ceilings of apt #3. dust &
Mar 13, 2013 · Penalty $1,200
Resolve - Class - 2
Failure to comply w/ the comms order to file a cert of correction w/ the dob noted respondent failed to correct the violating conditions & file a cert of correction pursuant to 28-204.2 for nov#34837966y rem: f
Jan 5, 2011
Resolve - Class - 2
Operation of a pa w/o a current c/o. at time of inspection 1st flr andcellar was occupied by approx 200 persons. remedy: obtain a pa c/o.
Nov 13, 2010
Resolve - Class - 1
Occupancy contrary to that allowed by cert. of occupancy of bldg dept.records. noted : based on d.o.b. records occupancy contrary to that allowed. operating as a p/a w/o a pa permit. @ time of inspection approx
Jun 26, 2010
Resolve - Non-hazardous
Failure to carry at permitted work in accordance with applicable laws and regulations in that construction activities an being performed other than weekdays between the hours of 7 am and 6 pm with a varionce
Sep 21, 1996 · Penalty $350
Resolve - Non-hazardous
Sidewalk sheed unsafe side walk shedrunning along the west side of premises is hazardous learning approinately 6" out of plumb it entine length (b) side walk shed overloaded debris of slate bricks and lose peic
Sep 21, 1996 · Penalty $2,000
Resolve - Non-hazardous
Failure to carry out demolition operations in a safe and proper manner in that at the time of inspection workmen continuish then peices of slate and bricks from side walk shed to side walk and side yard. remedy
Sep 21, 1996 · Penalty $2,000
Resolve - Hazardous
Work without a permit no permit available for inspection demolition of premises at west side o fbrick parapet wall. remedy: stop all work immediatley obtain permit.
Sep 21, 1996
Resolve
Show 1 more ↓
- Hazardous
Failure to provide at least two means of egress from room or space where required rear apartments 2r,3r,&4r.fire escape at rear of building termwaters at 1 story balcony no exit to street secord means of egress
Sep 19, 1995 · Penalty $475
Active
Complaints
- Water leak
Slow leak
Aug 19, 2026 · Apt 2
Close - Water leak
Damp spot
Aug 19, 2026 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
Jul 18, 2026 · Apt MAINLO
Close - Heat/hot water
Entire building
Jul 16, 2025 · Apt 3
Close - Heat/hot water
Entire building
Jun 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 19, 2025 · Apt 1B3
Close - Heat/hot water
Entire building
May 16, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Mar 31, 2025 · Apt 3
Close - Heat/hot water
Entire building
Mar 28, 2025 · Apt 3
Close - Unsanitary condition
Mold
Feb 24, 2023 · Apt 4W
Close
Show 40 more ↓
- Safety
Smoke detector
Feb 24, 2023 · Apt 4W
Close - Safety
Carbon monoxide detector
Feb 24, 2023 · Apt 4W
Close - Paint/plaster
Ceiling
Feb 24, 2023 · Apt 4W
Close - Paint/plaster
Ceiling
Feb 24, 2023 · Apt 4W
Close - Plumbing
Toilet
Feb 24, 2023 · Apt 4W
Close - Heat/hot water
Entire building
May 7, 2022 · Apt 3
Close - Heat/hot water
Entire building
May 7, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 30, 2021 · Apt 1B
Close - Heat/hot water
Entire building
Apr 17, 2021 · Apt 3
Close - Heat/hot water
Entire building
Jan 16, 2020 · Apt 1B
Close - Heat/hot water
Entire building
Jan 5, 2020 · Apt 3
Close - Heat/hot water
Entire building
Jan 5, 2020 · Apt 1B
Close - Door/window
Door
Dec 23, 2019 · Apt 31B
Close - Heat/hot water
Entire building
Dec 5, 2019 · Apt 1B
Close - Heat/hot water
Entire building
Dec 2, 2019 · Apt 1B
Close - Heat/hot water
Entire building
Dec 1, 2019 · Apt 3
Close - Heat/hot water
Entire building
Oct 21, 2018 · Apt 1B
Close - Heat/hot water
Entire building
Oct 18, 2018 · Apt 1B
Close - Water leak
Slow leak
Aug 13, 2018 · Apt 3
Close - Heat/hot water
Entire building
Feb 13, 2018 · Apt 1B
Close - Heat/hot water
Entire building
Feb 8, 2018 · Apt 1B
Close - Door/window
Window pane
Feb 8, 2018 · Apt 1B
Close - Heat/hot water
Entire building
Nov 8, 2017 · Apt 1B
Close - Heat/hot water
Entire building
Nov 7, 2017 · Apt 1B
Close - Plumbing
Water supply
Dec 27, 2016 · Apt 3
Close - Heat/hot water
Entire building
Nov 23, 2015 · Apt ALL
Close - Heat/hot water
Entire building
Nov 21, 2015 · Apt 3
Close - General
Bell/buzzer/intercom
Aug 19, 2015 · Apt 1B
Close - Heat/hot water
Entire building
Apr 25, 2015 · Apt 3
Close - Heat/hot water
Entire building
Jan 6, 2015 · Apt 1B
Close - Heat/hot water
Entire building
Dec 3, 2014 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 2, 2014 · Apt 4
Close - Heat/hot water
Entire building
Nov 30, 2014 · Apt 1B
Close - Heat/hot water
Entire building
Nov 13, 2014 · Apt 1B
Close - Heat/hot water
Entire building
Aug 31, 2014 · Apt 3
Close - Electric
Electric-supply
Mar 12, 2013 · Apt 1B
Close - Electric
Electric-supply
Mar 12, 2013 · Apt 1B
Close - Heating
Heat related
Mar 7, 2013 · Apt NA
Close - Heating
Heat related
Mar 7, 2013 · Apt 1B
Close - Heating
Heat related
Nov 7, 2010 · Apt 1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S3)
- Year built
- 1869
- Floors
- 4
- Residential units
- 3
- Building area
- 3,741 ft²
- Lot area
- 1,000 ft²
- Zoning
- C6-1
- Community board
- 102
- Council district
- 2
- Block / lot
- 529 / 43
- Assessed value
- $1,599,300
- Landmark / historic district
- NoHo East Historic District
HPD registration #119399, last renewed Sep 9, 2025.
Questions about 3 Bleecker Street
Who owns 3 Bleecker Street?
The owner of record in NYC Department of City Planning PLUTO data is Bowery Corner Owner LLC.
Does 3 Bleecker Street have violations?
Yes. NYC HPD has recorded 32 housing violations at this property.
Is 3 Bleecker Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3 Bleecker Street built?
City records list 1869 as the year it was built.
How many apartments are in 3 Bleecker Street?
It has 3 residential units and 4 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.