273 Mott Street
Manhattan, NY 10012BBL 1-00509-0036Map
Owner of record: R F S C INC
273 Mott Street is a walk-up apartment building built in 1910 in Manhattan, 10012. It has 10 residential units across 5 floors. The owner of record is R F S C INC. HPD has recorded 7 housing violations here, most recently on November 15, 2023.
- HPD violations
- 7
- DOB violations
- 5
- ECB violations
- 13
- HPD complaints
- 26
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 7
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Feb 27, 2022 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Feb 27, 2022 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Refit lower sash windows (total 3) at west wall in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from west at north
Feb 27, 2022 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Make safe by properly repairing the structural defect diagonal cracklines under fire escape form 2nd to 5th story ,building front exterior wall
Oct 7, 2014
Closed — Violation closed - CImmediately hazardous
Fire escape defective. properly secure front bottom member to bottom bracket at 3rd story balcony , front east fire escape
Oct 7, 2014
Closed — Violation closed - CImmediately hazardous
Fire escape defective. properly secure front bottom member at 2nd story balcony , front east fire escape
Oct 7, 2014
Closed — Violation closed
DOB building violations · 5
- Construction other optional
C-construction other optional
Sep 22, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 13
- Class - 1
Failure to maintain building walls noted: at exposure #1 vertical crack from 1st to 5th flr building leaning south with a separation of approx 3"to 4" apt 2f cracks in ceiling & walls interior wall bulging in
Jun 24, 2009 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain bldg.defects noted:1-bldg leaning towards south.2-at front facade (east side)vertical cracks at parapet ne corner and stone crack at se corner over entry door.metal cornice rusted throughout
Sep 30, 2003
Resolve - Non-hazardous
Having installed a sign without a permit. remedy: remove illegal work
May 16, 2003 · Penalty $800
Resolve - Non-hazardous
Having installed an awning without a permit. remedy: remove illegal work
May 16, 2003 · Penalty $800
Resolve - Non-hazardous
Having installed a flagpole without a permit, (2) remedy: remove illegal work
May 16, 2003
Resolve - Non-hazardous
Having signage ( double or multifaced) projecting more than 18 in across the stree line. remedy: remove illegal signage.
May 16, 2003 · Penalty $800
Resolve - Non-hazardous
Failure to provide approved plans at time of inspection noted work in progress under permit #103225984 appr 8/8/02 without providing approved plans at time of inspection. remedy: stop all work provide approved.
Oct 9, 2002 · Penalty $130
Resolve - Hazardous
Failure to maintain exterior bldg.wall noted:at east facade south line of windows and stone lintels and brick cracked,displaced at 2nd and 3rd flrs.at west elev.ground fl.masonry wall bulged,displaced,cracked.
Apr 2, 2001
Resolve - Hazardous
Failure to maintain exterior building wall.noted:rear building wall building outward approx 10" between 1st & 2nd floors.wood 2"x6" lumber used for shoring against building wall.south wall of buld.(bearing wall
Mar 27, 2001
Resolve - Hazardous
Failure to maintain exterior bldg. wall.noted:at east elevation so. line of windows -stone lintels and brick masonry cracked and displaced 2nd and 3rd fls. and @ west elevation -ground fl. brick masonry wall
Jul 10, 2000 · Penalty $2,000
Resolve
Show 3 more ↓
- Hazardous
Failure to maintain bldg. exterior noted:at rear of bldg. 1-2 fl. level wall bulging outward. 2)entire bldg. lening in a soutward direction approx. 4".3)spalling and defective so. parapet brickwork lentels &
Jun 28, 2000 · Penalty $2,000
Resolve - Hazardous
Failure to maintain building exterior noted: at rear of bldg 1st -2nd floor level rear wall buldging outward and seperating 2- rear wall brick work and lintels eroded spalling and defective throughout 3- verti
Dec 29, 1999
Resolve - Hazardous
Failure to maintain exterior building wall. noted: west side (rear) of building is bulging outward approx 1' between 1st & 2nd floors. 4 pair of 2"x6" boards in a letter a configuration have been installed
Nov 19, 1999 · Penalty $800
Resolve
Complaints
- Heat/hot water
Entire building
May 25, 2026 · Apt BLDG
Close - Door/window
Window frame
Feb 15, 2022 · Apt 3R
Close - Heat/hot water
Apartment only
Feb 15, 2022 · Apt 3R
Close - Door/window
Window frame
Feb 7, 2022 · Apt 3R
Close - Heat/hot water
Apartment only
Feb 7, 2022 · Apt 3R
Close - Heat/hot water
Entire building
Nov 2, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 26, 2018 · Apt 3R
Close - Electric
Power outage
Sep 16, 2014 · Apt 5F
Close - Heating
Heat related
Dec 28, 2013 · Apt 5F
Close
Show 16 more ↓
- General
Locks
Sep 28, 2011 · Apt 5F
Close - Construction
Roof
Sep 28, 2011 · Apt 5F
Close - Plumbing
Water-leaks
Sep 28, 2011 · Apt 5F
Close - Plumbing
Toilet
Jul 6, 2011 · Apt 5F
Close - Plumbing
Water-leaks
Jan 14, 2010 · Apt 5F
Close - Plumbing
Water-leaks
Jan 14, 2010 · Apt 5F
Close - Heating
Heat related
Feb 6, 2009 · Apt 2R
Close - Heating
Heat related
Nov 23, 2005 · Apt 4R
Close - General
Doors
Oct 7, 2005 · Apt 5F
Close - Plumbing
Water-leaks
Mar 14, 2005 · Apt 5F
Close - Paint/plaster
Ceiling
Mar 14, 2005 · Apt 5F
Close - Construction
Roof
Dec 31, 2004 · Apt BLDG.
Close - Paint/plaster
Wall
Dec 31, 2004 · Apt BLDG.
Close - General
Floor
May 10, 2004 · Apt 2F
Close - General
Floor
May 10, 2004 · Apt 2F
Close - Electric
Electric-supply
Oct 9, 2003 · Apt 5F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1910
- Floors
- 5
- Residential units
- 10
- Building area
- 5,045 ft²
- Lot area
- 1,860 ft²
- Zoning
- C6-2
- Community board
- 102
- Council district
- 1
- Block / lot
- 509 / 36
- Assessed value
- $1,784,700
- Landmark / historic district
- No
HPD registration #107770, last renewed Aug 24, 2025.
Questions about 273 Mott Street
Who owns 273 Mott Street?
The owner of record in NYC Department of City Planning PLUTO data is R F S C INC.
Does 273 Mott Street have violations?
Yes. NYC HPD has recorded 7 housing violations at this property.
Is 273 Mott Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 273 Mott Street built?
City records list 1910 as the year it was built.
How many apartments are in 273 Mott Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.