200 Bowery
Manhattan, NY 10012BBL 1-00492-7503Map
Owner of record: 200 Bowery Court Condominium
200 Bowery is a condominium built in 1988 in Manhattan, 10012. It has 35 residential units across 8 floors. The owner of record is 200 Bowery Court Condominium. HPD has recorded 14 housing violations here, most recently on June 5, 2024. 2 of the 14 most recent violations are still open.
- HPD violations
- 14
- DOB violations
- 12
- ECB violations
- 7
- HPD complaints
- 14
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame leading to stairs at public hall, 1st story
Jun 5, 2024
Open — False certification - ANon-hazardous
Refit door leading to stairs at public hall, 1st story
Jun 5, 2024
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 5, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 5, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Jun 5, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 14, 2018
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
Aug 14, 2018
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 14, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 14, 2018
Closed — Violation dismissed
Show 4 more ↓
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Aug 14, 2018
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 14, 2018
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 14, 2018
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Aug 14, 2018
Closed — Violation dismissed
DOB building violations · 12
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 8, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 11, 2020
Dob violation - resolved - Facade safety program facade required
Fisp-facade safety program facade required
Feb 20, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 17, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 17, 2015
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 7, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 19, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 24, 2008
Dob violation - resolved
Show 2 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 1, 2005
Dob violation - resolved - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed
ECB violations · 7
- Class - 2
Observed at exp1 erected/installed illuminated awning/business sign reads "clientele" w/decal with no permit/approvals from dob, obtain all permits; obtain permit
Aug 31, 2026 · Penalty $1,250
Active - Class - 2
No permits for awning installed on exp1, white and orange reads kite., obtain all permits
Jul 28, 2023 · Penalty $1,250
Resolve - Class - 2
Work without a permit in front of the store awning with sign approx. 30ft w x 5ft h x 3ft d, in sign mention ''kite''., obtain all permits; obtain permit
Jul 24, 2023 · Penalty $1,250
Resolve - Class - 1
Class 1: 97.x.10 restore to service & call nycdob for inspection. 25.m.7 fire signage missing. provide required signage at every floor landing.
Nov 28, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building walls and appurtenances.as noted:at time of inspection i observed on exposure #3 west elevation cracked brick mortar joints on parapet brick wall,beneath the coping stone a
Nov 7, 2019
Resolve - Class - 1
Sec. 28-404.1. using hoisting equipment w/o special rigger license. noted: special rigger license. noted: special rigger license #4939 expired on 11.30.12. noted: 1 platform in use @ exp 1. stop all work except
Dec 12, 2012 · Penalty $4,800
Resolve - Class - 1
Using hoisting equipment. (c-hook platform) w/o special rigger license. noted: special rigger license #4939 expired on 11.30.12. noted: 1 platform in use @ exp 1. stop all work except to provide safety. contact
Dec 12, 2012 · Penalty $4,800
Resolve
Complaints
- General
Janitor/super
Nov 18, 2025 · Apt 4A
Close - Plumbing
Toilet
Apr 27, 2024 · Apt 8C
Close - Heat/hot water
Entire building
Mar 29, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 30, 2019 · Apt 8C
Close - Heat/hot water
Entire building
Jan 17, 2019 · Apt 6E
Close - Heat/hot water
Entire building
Oct 17, 2018 · Apt 7A
Close - Elevator
Maintenance
Jul 26, 2018 · Apt BLDG
Close - Flooring/stairs
Floor
Mar 8, 2016 · Apt 3A
Close - Flooring/stairs
Floor
Mar 8, 2016 · Apt 3A
Close
Show 4 more ↓
- Heating
Heat related
Apr 25, 2012 · Apt 3A
Close - Heating
Heat related
Jan 19, 2005 · Apt 2C
Close - Heating
Heat related
Jan 22, 2004 · Apt 3-E
Close - Heating
Heat related
Jan 16, 2004 · Apt 3E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1988
- Floors
- 8
- Residential units
- 35
- Building area
- 26,120 ft²
- Lot area
- 5,000 ft²
- Zoning
- C6-1
- Community board
- 102
- Council district
- 1
- Block / lot
- 492 / 7503
- Assessed value
- $4,643,989
- Landmark / historic district
- No
HPD registration #140767, last renewed Sep 23, 2025.
Questions about 200 Bowery
Who owns 200 Bowery?
The owner of record in NYC Department of City Planning PLUTO data is 200 Bowery Court Condominium.
Does 200 Bowery have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 200 Bowery rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 200 Bowery built?
City records list 1988 as the year it was built.
How many apartments are in 200 Bowery?
It has 35 residential units and 37 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.