roofy

222 Bowery

Manhattan, NY 10012BBL 1-00492-0023Map

Owner of record: 222 Bowery Owners Corp

222 Bowery is a walk-up apartment building built in 1885 in Manhattan, 10012. It has 8 residential units across 3 floors. The owner of record is 222 Bowery Owners Corp. HPD has recorded 1 housing violation here, most recently on May 23, 2018.

HPD violations
1
DOB violations
11
ECB violations
11
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 23, 2018

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 1

  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum of 100 watts as required(light fixture(s) present). at front areaway

    May 23, 2018

    Closed — Violation dismissed

DOB building violations · 11

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 4, 2020

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 8, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 31, 2010

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    C-construction other optional

    Sep 2, 2008

    Vw*-violation - work w/o permit dismissed
  • Landmark none

    Landmk-landmark none

    Nov 23, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
Show 1 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 11

  • Class - 2

    Pedestrian protection does not meet code specification at the time of inspection at 3 story building observed,the sidewalk shed erected in place,there was loose parapet creates hazard condition of pallies in pu

    Aug 20, 2020

    Resolve
  • Class - 2

    Failure to maintain building in a code compliant manner.i observed a broken plate glass window on exposure#1 due to a piece of the facade falling through the window.please note sidewalk shed in place at exposur

    Mar 25, 2020 · Penalty $310

    Resolve
  • Class - 1

    Failure to safeguard at time of arrival observed bicycle extension frame hanging from scaffold frame.scaffold(supported)installed on top of sws.top of supported scaffold extending over 48ft.bicycle extension wa

    Feb 20, 2020 · Penalty $10,000

    Resolve
  • Class - 2

    Work does not conform to approved documents. at the time of inspectionof a 5 story building w/ a sidewalk shed and supported scaffold erected at exp-1 i observed supported scaffold installed that does not confo

    Jan 31, 2020

    Resolve
  • Class - 2

    Work does not conform to approved documents. at the time of inspectioni observed a 5 story building w/ supported scaffold and sws erected atexp-1. upon observation the sws on site does not conform to approved d

    Jan 31, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Bc3314.9=supproted scaffold does not meet code specification loose neeting note at time of inspection on a 5 story building actiev jobsiet at ecxpo #1 i observed inadequate debri neeting all around the pipe sca

    Dec 3, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to provide job site signs. at time of inspection observe a 5 story bldg w/ renovation work in progress. during inspection noted thatthere is a sidewalk shed w/ supported scaffold w/ no permit posted as

    Oct 29, 2019

    Resolve
  • Class - 2

    Bc 3314.4.8 failure to maintain. at time of inspection observed a 5 story bldg w/ renovation work in progress. during inspection noted that the debris netting was loose and not attached to the scaffold as requi

    Oct 29, 2019

    Resolve
  • Class - 2

    Failure to provide sidewalk shed extension. at time of inspection observed a 5 story bldg w/ renovation work in progress. during inspection noted a sidewalk shed w/ supported scaffold at exposure#3. the gc did

    Oct 29, 2019

    Resolve
  • Class - 1

    Prohibited outdoor advertising company sign on sidewalk shed. at time of inspection observed a 5 story bldg w/ renovation work in progress. during inspection noted a sidewalk shed at exposure#1 w/ unlawful adve

    Oct 29, 2019

    Resolve
Show 1 more ↓
  • Class - 2

    Work w/o a permit noted at 1fl interior demolition of interior partition walls removal of fire rated material from ceiling removal of cmu from pool remedy: stop all work except to remove debris and make safe ob

    Sep 2, 2008

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C8)
Year built
1885
Floors
3
Residential units
8
Building area
17,901 ft²
Lot area
4,855 ft²
Zoning
C6-1
Community board
102
Council district
1
Block / lot
492 / 23
Assessed value
$3,575,700
Landmark / historic district
INDIVIDUAL LANDMARK

Questions about 222 Bowery

Who owns 222 Bowery?

The owner of record in NYC Department of City Planning PLUTO data is 222 Bowery Owners Corp.

Does 222 Bowery have violations?

Yes. NYC HPD has recorded 1 housing violations at this property.

Is 222 Bowery rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 222 Bowery built?

City records list 1885 as the year it was built.

How many apartments are in 222 Bowery?

It has 8 residential units and 9 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.