514 Broadway
Manhattan, NY 10012BBL 1-00483-0013Map
Owner of record: Soho Plaza Corp
514 Broadway is an elevator apartment building built in 1881 in Manhattan, 10012. It has 40 residential units across 6 floors. The owner of record is Soho Plaza Corp. HPD has recorded 5 housing violations here, most recently on January 26, 2020. 1 of the 5 most recent violations are still open.
- HPD violations
- 5
- DOB violations
- 53
- ECB violations
- 27
- HPD complaints
- 8
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 5
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Jan 26, 2020
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jan 26, 2020
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 26, 2020
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jan 26, 2020
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 26, 2020
Closed — Violation dismissed
DOB building violations · 53
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2019
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Plumbing none
The department of buildings intends to revoke the permit issued in connection with application #103725480 due to suspension of master plumber's license. all plumbing work has been ordered stopped immediately
May 19, 2018
Dob violation - dismissed
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 11, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 11, 2015
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 29, 2013
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 14, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 3, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 3, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2008
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 5, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 27, 2007
Dob violation - resolved - Landmark none
Landmk-landmark none
Jan 4, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 4, 2007
Dob violation - resolved - Construction other optional
C-construction other optional
Sep 15, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 22, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 19, 2002
Dob violation - dismissed - Elevator elevatorrequired
1p2335
Feb 16, 2000
Dob violation - resolved - Elevator elevatorrequired
1p3285
Feb 16, 2000
Dob violation - resolved - Landmark none
Landmk-landmark none
Dec 18, 1995
Dob violation - dismissed - Landmark none
Landmrk-landmark none
Dec 18, 1995
Dob violation - dismissed - Landmark none
Landmk-landmark none
Dec 11, 1995
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 6, 1992
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Aug 6, 1992
Dob violation - active - Construction other optional
C-construction other optional
May 29, 1991
Vp*-violation unserved ecb- dismissed - Plumbing none
P-plumbing none
Nov 15, 1990
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 1990
Dob violation - resolved - Elevator elevatorrequired
(74) provide access to all floors
May 14, 1990
Dob violation - resolved - Construction other optional
C-construction other optional
Jan 26, 1990
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Jan 26, 1990
Dob violation - dismissed - Elevator elevatorrequired
(51)restore frt-elevator to proper working order -or file with the deptment - for dismantle or removal & obtain proper permits
Feb 23, 1989
Dob violation - resolved - Construction other optional
C-construction other optional
Oct 3, 1988
Dob violation - active
ECB violations · 27
- Class - 2
Failure to comply with bc-3307.6.4.4 vertical members and approved drawing. observed sidewalk shed at exposure one has vertical members with inadequate clearance from curb line approximately 9 to 12 inches crea
Mar 26, 2025 · Penalty $2,400
Resolve - Class - 2
Failure to provide approved / accepted plans at job site at time of inspection at time of spot check inspection for sprinkler finish no approved plans on site floors 2,3,4,5,6 , provide approved /accepted const
Jun 5, 2019 · Penalty $655
Resolve - Class - 2
Failure to comply w/comm's order contained in summons/vio #35261645k issued on 09/08/2017, & to file a cert of correction pursuant to 28.201.1 & 1rcny 102-01(d)(2).an acceptible cert has not yet been filed desp
May 17, 2018 · Penalty $1,280
Resolve - Class - 2
Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls and appurtenances reqd by 28-302.4 for control #700893.rem:submit reqd technical report
Mar 7, 2018
Resolve - Class - 2
Failure to file a final insp for completed work w/in 1 year of permit expiration.alt 2 job #120147037 p.c which entails renovation of 6th fl mezzanine & roof plumbing work has been complete & is substantially c
Sep 8, 2017 · Penalty $800
Resolve - Class - 2
Failure to maintain exterior bldg east elev exp#1-end of 1st fl cornice mortar eroded. step cracks fl 2,3,4,5fl. flower pots on window sill at fire escape. 2nd fl brick defective liner window sill. 3rd fl windo
Aug 11, 2016 · Penalty $500
Active - Class - 1
B101 work w/o a permit. installation of replacement boiler peerless gas fired hot water.heating boiler being assembled in boiler room in cellar.no permit or laa in system at time of inspection.obtain permit
Feb 8, 2016
Resolve - Class - 2
Failure to maintain exterior bldg metal cornice dented,4 & 6 floor stone heater chipped-fire escape flowers on 3rd landing-1st fl cornice defective,east wall brick spalling brick missing mortar-1st fl horizonta
Sep 22, 2015 · Penalty $500
Active - Class - 2
28-317.3 failure to register cooling tower. rmdy: comply w/code.
Sep 21, 2015
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Dec 12, 2014
Resolve
Show 17 more ↓
- Class - 2
Pswo (supported scaffold) issued pursuant to 28-207.2 posted off outrigger beams in connection w/suspended scaffold. noted: outrigger beams in connection w/suspended scaffold. noted: outrigger beams installed
Sep 17, 2014 · Penalty $400
Resolve - Class - 2
Pswo (supported scaffold) issued pursuant to 28-207.2 posted work doesnot conform to approved construction documents. noted supported scaffold on exp #3 has multiple levels w/trusses & put logs on indicated on
Sep 17, 2014
Resolve - Class - 2
The permit holder shall post a readily visible sign on the sidewalk shed such sign shall include: the name,address,telephone # of the permmit holder. the permit #. the expiration date of the permit. noted: no
Jan 15, 2009
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rules & regulation
Nov 28, 2008
Resolve - Non-hazardous
Work w/o a permit. noted : mezz, 1st floor & cellar levels - renovation (store) under way (new metal partitions & studs, ceiling & wall, sheet gypsum boards, electrical, plumbing & hvac) also floor openings fo
Mar 9, 2004
Resolve - Non-hazardous
10b07,36o02,48v16,22r10. 10b07-provide and install additional gibs (2)per door panel 48u16-provide rope data tags 22r10-renew locking device per exit cover
May 13, 2003
Resolve - Non-hazardous
B14-16a09-16h11. 31-b-14 seal shaftway in pit area and in overhead remove woodin overhead 16-a-09 remove door stop on inside of shaftway doors 16-h-11 repair door hinges lobby door.
Nov 1, 2002
Resolve - Non-hazardous
Work without a permit. noted: steel rolldown shutter gates installed at front entrance door & display window. dba active wear house. location: 1st fl comm. remedy: obtain permits and approval.
Nov 3, 1997 · Penalty $500
Resolve - Non-hazardous
Work without a permit.work noted erected wood deck on roof south-east over apt 6-h with stair erected from a/a to roof.enclosed bulk head. (note work completed)remedy:obtain a permit or remove deck and stair,b
Nov 28, 1995
Resolve - Non-hazardous
Work without a permit work noted - steel grill as rolder shutters in- stalled in front of entrance door and display window without approval and permit. remedy:obtain approved and nessary permits from landmark
Jan 28, 1994 · Penalty $350
Resolve - Non-hazardous
Occupancy contrary to that allowed by the cofo #83238. from ilegal electrical meter room. to illegal: living quarter. remedy:discontinue illegal use .
Nov 16, 1992
Resolve - Non-hazardous
Failure to maintain .defect:holes in floors.location:sidewalk vault at 5214 broadway.sidewalk vault at 66 crosby st.remedy:make all necessary repair.
Sep 4, 1992
Resolve - Hazardous
Failure to maintain. brick and mortar loose and defective. arch header missing brick. non bearing wall. location cellar rear water damage throughout brick wall. (hazardous)
Aug 6, 1992 · Penalty $800
Resolve - Hazardous
Failure to maintain. double eye beam girder rusted and deteriorated. brick and motor loose and defective rear wall of building water damage under mining supporting column. in sub cellar (hazardous)
Aug 6, 1992
Resolve - Non-hazardous
Failure to maintain. defect: removal of fire rating on ceiling location: throughout cellar and sub cellar. remedy: obtain a permit, and install sheetrock for fire rating
Aug 6, 1992 · Penalty $350
Resolve - Non-hazardous
Occupancy contrary to that allowed by the certificater of occupancy c of o number 83238 from iegal: basement and storage to illegal: showroom and office location: in basement. remedy: discontinue illegal use.
May 29, 1991
Resolve - Non-hazardous
Work without a permit. work noted<; remove fire wall between lobby and lobby and commercial space south of lobby. install new sheet rock in lobby. all done without first obtaining a permit from bldg dept.
Oct 17, 1990 · Penalty $285
Resolve
Complaints
- Heat/hot water
Entire building
Jan 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 10, 2017 · Apt 4E
Close - Heat/hot water
Apartment only
Nov 7, 2017 · Apt 4E
Close - Heating
Heat related
Oct 13, 2012 · Apt 3A
Close - Heating
Heat related
Mar 20, 2009 · Apt 4E
Close - Heating
Heat related
Mar 4, 2008 · Apt 6G
Close - Heating
Heat related
Oct 24, 2006 · Apt 2B
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Mar 26, 2026 | Non-market transfer | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D0)
- Year built
- 1881
- Floors
- 6
- Residential units
- 40
- Building area
- 76,550 ft²
- Lot area
- 14,015 ft²
- Zoning
- M1-5/R9X
- Community board
- 102
- Council district
- 1
- Block / lot
- 483 / 13
- Assessed value
- $12,089,700
- Landmark / historic district
- SoHo-Cast Iron Historic District
Questions about 514 Broadway
Who owns 514 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Soho Plaza Corp.
Does 514 Broadway have violations?
Yes. NYC HPD has recorded 5 housing violations at this property.
Is 514 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 514 Broadway built?
City records list 1881 as the year it was built.
How many apartments are in 514 Broadway?
It has 40 residential units and 42 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.