138 Bowery is a hotel built in 2016 in Manhattan, 10013. It has 27 residential units across 8 floors. The owner of record is 142 Emmut Properties, LLC. HPD has recorded 8 housing violations here, most recently on June 13, 2025. 2 of the 8 most recent violations are still open.
- HPD violations
- 8
- DOB violations
- 30
- ECB violations
- 22
- HPD complaints
- 6
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 8
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 11, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at at public hall, 1st story
Apr 11, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 20, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2019
Closed — Violation dismissed
DOB building violations · 30
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 5, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 5, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2019
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 18, 2017
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 18, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 26, 2017
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed
Show 20 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 29, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 28, 1993
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Jan 28, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 28, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 28, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 28, 1993
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Jan 28, 1993
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Jan 28, 1993
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Jan 28, 1993
Dob violation - dismissed
ECB violations · 22
- Class - 1
Atoi observed hvac unit on roof of second floor of above premises no permits on file for this unit. issued nov for work without a permit., obtain permit
May 28, 2026 · Penalty $2,500
Active - Class - 1
Atoi observed hvac unit on roof of second floor of above premises no electric permits on file for this unit. issued nov for work without a permit, obtain permit
May 28, 2026 · Penalty $2,500
Active - Class - 2
3301.7 failure to provide p.e. approved design drawings.as noted:at the time of inspection at an active construction site observed 2 workersat floor #6 tied off to the king and jack studs of the rough opening
Aug 16, 2017 · Penalty $400
Resolve - Class - 2
No logs on site. at time of inspection of construction of 8story bldg i requested to see the superintendent's log, none was provided. rmdy: provide logs as per code, call best.
Jul 26, 2017 · Penalty $400
Resolve - Class - 2
Failure to maintain/provide approved design drawings.at time of inspection of 8story bldg, i requested design drawing for needle beams and platforms on exp4 on 5th floor.none were provided. rmdy:provide engine
Jul 26, 2017 · Penalty $250
Resolve - Class - 2
1rcny3301-02 fail to maintain &/or make job site logs available.@ the time of inspection of a 8 story nb currently @ roof level upon requestto observe the daily log book none was provided.construction superinte
Jul 22, 2017 · Penalty $400
Resolve - Class - 1
Failure to maintain adequate housekeeping.@ the time of inspection of a 8 story nb currently @ roof level i observed trash piled up on everyfl in trash bags 3ft high & misc debris & combustible materials all ov
Jul 22, 2017 · Penalty $400
Resolve - Class - 1
Work w/o permit/contrary.@ the time of my inspection of a 8 story nb currently @ roof level.i observed work being performed when i arrived @7:55am.the after hours variance permit obtained by the contractor allo
Jul 22, 2017 · Penalty $800
Resolve - Class - 2
Bc3301.7 failure to provide p.e. approved design drawings. as noted: at time of inspection at an active construction site.observed a work at work at floor #8, no p.e. approve detail design for elevator shaft
Apr 26, 2017 · Penalty $250
Resolve - Class - 1
Failure to institute/maintain safety equipment measure on temporary construction- no guardrails. as noted: @ time of insp @ an active construction site observed @ flr#8 rebar work exp#2,4 staircase & elevator s
Apr 26, 2017 · Penalty $1,200
Resolve
Show 12 more ↓
- Class - 2
Wrk does not conform to approved construction documents.as noted:at time of inspection at an active construction site,observed at exposure #2 foundation wall,rebar not installed in accordance with structural dr
Dec 2, 2016 · Penalty $250
Resolve - Class - 2
Failure to provide approved/accepted plans at jobsite at time of inspection at the time of inspection it was observed major excavation work was done at exp#4 w/no approved soe drawing. remedy: provide plans.
Oct 11, 2016 · Penalty $250
Resolve - Class - 2
3307.7.3 view panels not provided. noted: demolition jobsite exp#1 along bowery sites 138-142 do not have any code required viewing pan els. i cannot see into site, bldgs have been removed to grade. rmdy:\
Apr 16, 2016 · Penalty $400
Resolve - Class - 1
33099 weatherproof integrity of adjoining properties.note:t time of inspection demolition jobsite. at exp#2 the adj property wall at 136 bowery is not properly water/weather protected. appears at not level ther
Apr 16, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to provide required notification prior to the commencement of demolition at the time of my inspection demolition work in progress. demolishing a 3story bldg. a search of dob records show demolition con
Feb 2, 2016 · Penalty $1,200
Resolve - Class - 1
Bc3307.6.2 failure to provide overhead protection for adjacent building courtyard. at the time of my inspection construction demo work in progress i observed no overhead protection was provided for adjacent
Feb 2, 2016 · Penalty $1,600
Resolve - Class - 1
Bc3314.8 at the time of my inspection, demolition work in progress, iobseved 2 workers using a supported pipe scaffold 12'high at exp4.no guardrails was provided for the safety of workers creating a hazardous
Feb 2, 2016 · Penalty $400
Resolve - Class - 1
Bc3314.5 failure to fully planked supported pipe scaffold flatform.atthe time of my inspection demo work in progress. i observed workers using a supported pipe scaffold 12'high flatform not fully planked in li
Feb 2, 2016 · Penalty $800
Resolve - Class - 1
Failure to comply w/commissioner's order contained in nov#35013908k issued on 8/21/13/ for work w/o a permit. at cellar and 1st flr created large opening in bearing walls containing buildings 136 and 138.rmdy:
Mar 4, 2014 · Penalty $12,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov#35013908k issued on 8/21/13. for work w/o a permit at cellar and 1st floor, created large opening in bearing walls containing buildings 136 and 13
Jan 8, 2014 · Penalty $12,000
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35013908k issued on 8/21/13 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.
Oct 15, 2013 · Penalty $830
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #35013908k issued on 8/21/13. work w/o permit: at cellar & 1stfl,created large openings in bearing walls combining bldgs 136 & 138
Oct 15, 2013 · Penalty $2,430
Resolve
Complaints
- Unsanitary condition
Pests
Dec 3, 2023 · Apt 305
Close - Water leak
Damp spot
Aug 12, 2023 · Apt 8D
Close - Unsanitary condition
Pests
Sep 13, 2019 · Apt 404
Close - Heat/hot water
Apartment only
Nov 10, 2014 · Apt 3R
Close - Plumbing
Water supply
Apr 5, 2004 · Apt 3R
Close - Plumbing
Water supply
Apr 5, 2004 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H3)
- Year built
- 2016
- Floors
- 8
- Residential units
- 27
- Building area
- 44,251 ft²
- Lot area
- 7,716 ft²
- Zoning
- C6-1G
- Community board
- 102
- Council district
- 1
- Block / lot
- 470 / 53
- Assessed value
- $5,186,250
- Landmark / historic district
- No
HPD registration #144678, last renewed Oct 20, 2025.
Questions about 138 Bowery
Who owns 138 Bowery?
The owner of record in NYC Department of City Planning PLUTO data is 142 Emmut Properties, LLC.
Does 138 Bowery have violations?
Yes. NYC HPD has recorded 8 housing violations at this property.
Is 138 Bowery rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 138 Bowery built?
City records list 2016 as the year it was built.
How many apartments are in 138 Bowery?
It has 27 residential units and 76 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.