228 East 13 Street
Manhattan, NY 10003BBL 1-00468-0024Map
Owner of record: 228 East 13th Street Owners Corp
228 East 13 Street is a walk-up apartment building built in 1900 in Manhattan, 10003. It has 28 residential units across 6 floors. The owner of record is 228 East 13th Street Owners Corp. HPD has recorded 35 housing violations here, most recently on February 15, 2022. 33 of the 35 most recent violations are still open.
- HPD violations
- 35
- DOB violations
- 7
- ECB violations
- 1
- HPD complaints
- 2
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 35
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following , 200 watts required.
Jun 3, 2009
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures cooking appliance range 5 st east apt 51. , section '' ''
Mar 21, 1990 · Apt 51
Open — Nov sent out - ANon-hazardous
Refit cellar door boiler room.
Jul 27, 1989
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing 3 sty northwest apt 13 dan. located at apt 13
Jul 27, 1989 · Apt 13
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors entrance to 3 sty northwest apt 13. located at apt 13
Jul 27, 1989 · Apt 13
Open — Nov sent out - ANon-hazardous
Replace with new the missing missing kitchen cabinet drawer 3 sty northwest apt 13. located at apt 13
Jul 27, 1989 · Apt 13
Open — Nov sent out - CImmediately hazardous
D26-10.01 adm code fire escape defective. properly secure gooseneck ladder loose from parapet wall roof at west er1.
Jul 27, 1989
Open — Nov sent out - ANon-hazardous
Thoroughly whitewash or paint with a light color the surfaces ceilings and walls throughout cellar.
Jul 27, 1989
Open — Nov sent out
Show 25 more ↓
- ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration metal studs and sheet rock installed public halls all stys decreasing size appx 4in.
Jul 27, 1989
Open — Nov sent out - ANon-hazardous
Section 178, 217 m/d law provide skylight ventilation of at least 40 sq.in. or fixed or movable louvres, or movable sash bulkhead to roof.
Jul 27, 1989
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing.
Jul 27, 1989
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Jul 27, 1989
Open — Nov sent out - BHazardous
Install and maintain sufficient light or lights of at least 100 watts incandescent or equivalent each, to light adequately from sunset to sunrise the est court.
Jul 27, 1989
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots 1 to 5 stys rear stack.
Jul 27, 1989
Open — Nov sent out - BHazardous
Replace with new the missing ceramic tile walls and floors 3 sty northwest apt 13 bathroom. , section '' ''
Jul 27, 1989 · Apt 13
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls 3 sty northwest apt 13 bathroom. , section '' ''
Jul 27, 1989 · Apt 13
Open — Nov certified late - BHazardous
Replace with new the broken or defective radiator valve 3 sty northwest apt 13 center room. , section '' ''
Jul 27, 1989 · Apt 13
Open — Nov certified late - BHazardous
Remove all encumbrances consisting of consisting of wood boards roof.
Jul 27, 1989
Open — Nov sent out - ANon-hazardous
Provide metal screen above & below skylight 6 sty public hall.
Jul 27, 1989
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes courtyard at west.
Jul 27, 1989
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cement floor at cellar boiler room.
Jul 27, 1989
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color loose & unkeyed plaster 3 sty front east apt 14 kitchen and bathroom. , section '' ''
Oct 7, 1988 · Apt 14
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of exposed electric wires 3 sty front east apt 14 throughout. , section '' ''
Oct 7, 1988 · Apt 14
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling 3 sty front east apt 14 throughout. , section '' ''
Oct 7, 1988 · Apt 14
Open — Nov sent out - BHazardous
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing 3 sty front east apt 14. , section '' ''
Oct 7, 1988 · Apt 14
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of moisture penetrating ceiling and wall 3 sty front east apt 14 kitchen and bathroom. , section '' ''
Oct 7, 1988 · Apt 14
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors 3 sty rear west apt 15 entrance. , section '' ''
Aug 17, 1987 · Apt 15
Open — Nov sent out - ANon-hazardous
D26-10.01 adm code replace with new the broken or defective pull chain electric switch bathroom 2nd sty rear east apt 12. , section '' ''
Apr 30, 1987 · Apt 12
Open — Nov sent out - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration public hall partition removed at 4 and 6 sty and made part of thr apts at front east.
Apr 30, 1987
Open — Nov sent out - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective ceiling rear east cellar.
Apr 30, 1987
Open — Nov sent out - BHazardous
D26-11.01, 11.03, 11.05 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the throughout cellar.
Apr 30, 1987
Open — Nov sent out - BHazardous
D26-10.01 adm code properly repair the broken or defective interior wooden trim at entrance door 2 sty rear east apt 12. located at apt 12
Apr 30, 1987 · Apt 12
Open — Nov sent out - BHazardous
D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling 2nd sty rear east apt 12 bathroom. , section '' ''
Apr 30, 1987 · Apt 12
Open — Nov sent out
DOB building violations · 7
- Facade facade optional
Ll10/80-local law 10/80 - facade facade optional
Jan 19, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 8, 1988
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 15, 1988
Dob violation - dismissed
ECB violations · 1
- Class - 2
Occupancy contrary to that allowed by cert of occupancy or building dept records. noted entire roof of (6) story multiple dwelling is occupied as recreation area which is contrary to building dept records., dis
Apr 19, 2024 · Penalty $1,250
Active
Complaints
- Plumbing
Water supply
Jan 15, 2025 · Apt BLDG
Close - Water leak
Heavy flow
Jan 17, 2018 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1900
- Floors
- 6
- Residential units
- 28
- Building area
- 13,110 ft²
- Lot area
- 2,951 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 468 / 24
- Assessed value
- $1,830,150
- Landmark / historic district
- No
HPD registration #122165, last renewed Sep 22, 2025.
Questions about 228 East 13 Street
Who owns 228 East 13 Street?
The owner of record in NYC Department of City Planning PLUTO data is 228 East 13th Street Owners Corp.
Does 228 East 13 Street have violations?
Yes. NYC HPD has recorded 35 housing violations at this property.
Is 228 East 13 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 228 East 13 Street built?
City records list 1900 as the year it was built.
How many apartments are in 228 East 13 Street?
It has 28 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.