27 East 7 Street
Manhattan, NY 10003BBL 1-00463-0044Map
Owner of record: 27 E. 7th St LLC
27 East 7 Street is a walk-up apartment building built in 1880 in Manhattan, 10003. It has 11 residential units across 5 floors. The owner of record is 27 E. 7th St LLC. HPD has recorded 3 housing violations here, most recently on November 2, 2022.
- HPD violations
- 3
- DOB violations
- 7
- ECB violations
- 31
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 3
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum required 100 watts (light fixture present) at front areaway, 1st story
Feb 10, 2016
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 200 watts minimum required (light fixtures present)
Apr 23, 2014
Closed — Violation closed
DOB building violations · 7
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 10, 2008
Dob violation - dismissed - Zoning none
Z-zoning none
Apr 10, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 31
- Class - 1
Failure to provide unobstructed exit passageway noted:fire exit passageway to exit into the street @ cellar level.obstructed by stored ladder & wooden mouldings on corridor fl in fronts of exit door.rem:remove
Jul 2, 2014 · Penalty $400
Resolve - Class - 2
Work w/o permit.noted:contractor has failed to obtain a permit for the modification of existing sprinkler system.also no letter of no objection fr fdny.rem:stop all work pursuant to 28-207.2.obtain all approval
Jan 8, 2013
Resolve - Class - 2
Fail to provide approved/accepted plans at job site at time of insp.noted:no plans on site for temp shoring to support old joists;also no demo plans on site.rem:provide plans.
Jan 8, 2013
Resolve - Class - 1
Fail to safeguard all persons/prop affected by const ops.noted:on 4th fl a ladder is straddled over 3'x3' opening in the floor.wood that is used to cover the floor are not stayed fr movement on 1st to 3rd fl.
Jan 8, 2013 · Penalty $2,400
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements.noted:unprotected flr openings missing.handrails construction debris in various locations throughout entire bldg.remedy:maintain adequate house
Oct 4, 2012 · Penalty $400
Resolve - Class - 2
Job #120960718 exp 7.28.13. failure to have approved plans at premisesat time of inspection. full gut renovation under job #120960718 exp 7.28.13 no approved plans on site. remedy:stop all work provide approved
Aug 17, 2012
Resolve - Class - 2
Sidewalk shed does not meet code specifications. noted: sidewalk shed present approx 25' w/light fixtures present & illuminated except for red light to indicate stand pipe. remedy: conform to sidewalk shed
May 9, 2012 · Penalty $400
Resolve - Class - 1
1008.1.4.fail to comply w/exit door floor elevations note:@ front entrance way exist an exit door that when fully opened swings over a 4"-6"high step creating a tripping hazard.remedy:comply w/exit door floor e
Mar 24, 2010 · Penalty $1,600
Resolve - Class - 1
28.209.2.fail to comply w/commissioners peremtory vacate order #166/2009 issued 9/10/09 (partial) to vacate interior rooms w/only 1 means of egress is now occupied w/illegal transient guest.remedy:vacate comply
Mar 24, 2010 · Penalty $1,600
Resolve - Class - 1
Occupancy contrary to that allowed by dob records.illegal occupancy noted:alt typ 1 permit schedule "a"indiactes bldg as a lodging house (use group2)now premises occupied primarily transient hotel(use groups)
Mar 24, 2010 · Penalty $2,400
Resolve
Show 21 more ↓
- Class - 1
(misc)bc1004.1failure to comply with maximum load requirements noted:from 2nd-5th flrs exist 6rms per flr equiped & arranged for up to 8 occupants per room for a total occupant load of 136 people as a primarily
Mar 24, 2010
Resolve - Class - 1
Misc/bc1004.1filure to comply w/design occupant load creating inadequate means of egress for over 130 people.note:from flrs 2nd-5 exit 24 rms with upto 8beds per room creating a total occupant load over 130 peo
Mar 24, 2010
Resolve - Class - 1
Work without permits. work noted at 1st floor kitchen area a new gas line was installed a miniature gas cook top. rem: stop all work: obtainll necessary approvals & permits. to legalize the gas cooking unit or
Sep 10, 2009 · Penalty $1,600
Resolve - Class - 1
Failure to comply with directional swing exit door at various locations. noted: at 1st floor level exist the front 36' left handed door that swings contrary to the flow of egress. rem: discontinue illegal trans
Sep 10, 2009 · Penalty $1,600
Resolve - Class - 1
Failure to comply with maximum load requirements noted: form 2nd 05th loors exist 6 room per floor and 32 beds & 1 room with 6 beds on 1st floor totaling approximately 132 occupancies. rem: discontinue illegal
Sep 10, 2009 · Penalty $1,600
Resolve - Class - 1
Occupancy contrary to that allowed by dept of building records. note alt type i job #110334594
Sep 10, 2009 · Penalty $2,400
Resolve - Class - 1
Failure to comply with door encroachment requirements note: from 2nd-5th floor exist (2) exit doors per floor that when open reduces the required width of vertical exit passageway. rem: discontinue illegal tran
Sep 10, 2009 · Penalty $1,600
Resolve - Class - 1
Failure to comply with spiral stairways as a means of egress requirements. note: from 2nd-5ht floors exist spiral stairways within 2 space more than 250 sqft and serving more than 5 occupants. rem; discontinue
Sep 10, 2009
Resolve - Class - 1
Failure to comply with exit door floor elevation note: at front entranceway exist an exit door when open swings over a 4'6' step cracking a tripping hazard. rem: comply with exit door floor elevation requireme
Sep 10, 2009 · Penalty $1,600
Resolve - Class - 1
Fail to maintain bldg in code-compliant manner: use prob door/hardware1- ceiling- front & rear door- slide bolts front gate padlocked. 2- some corridor door & frames not rated. 3- roof door not self closing. re
Aug 13, 2009 · Penalty $1,000
Resolve - Class - 1
Alt/changed bldg occupied w/o valid c of o per 28-118.3.1-28-118.3.2. transients hotel. remedy: obtain valid c of o or discontinue illegal.
Aug 13, 2009 · Penalty $500
Resolve - Class - 1
Failure to provide unobstructed means of egress. construction debris in rear of building at fire-escape drop. * this violation supersedes violation #34801706n. rem: immediately remove all obstruction.
Aug 13, 2009 · Penalty $1,600
Resolve - Non-hazardous
Failure to provide at least 2 means of egress from room or space whererequired. noted: garden hose obstructing egress at east fire escape atrear of 27 east 7th st. garden hose wrapped around fire escape from
Apr 17, 2008 · Penalty $480
Resolve - Non-hazardous
Exit door swings against flow of egress exit door at 2nd 3rd 4th and 5th fl opens against flow of egress remedy: repair or replace doors at 2nd 3rd 4th 5th fl hallway
Apr 17, 2008 · Penalty $350
Resolve - Non-hazardous
Occupancy contrary to that allowed by the c of o or bldg dept records for entire bldg remedy: discontinue illegal use or amend c of o (vacate) forthwith rooms 201 202 204 205 301 302 304 305 401 402 404 405 501
Apr 17, 2008 · Penalty $800
Resolve - Hazardous
Work w/o permits on 5fl new construction in progress.note application #104871373 issued 9/7/07 & expires 7/20/08 has been audited # 10 day letter issued w/o response (revoked)for demolition & installing new par
Apr 10, 2008
Resolve - Non-hazardous
Work w/o permits work noted walls removed & installed creating a transient hotel receptionist desk & office as well as a dining room w/multiple tables & chairs for hotel guest.note:at cellar level walls erected
Apr 10, 2008 · Penalty $800
Resolve - Hazardous
B4b,bq9.bq9-existing boiler removed.(2) new boilers being installed w/no permit.-no-(bl,on emg.ara.)taken out.
Dec 21, 2007 · Penalty $5,000
Resolve - Hazardous
Failure to properly store combustible materials & debris. noted: at the time of inspection the bldg had old debris stored in the 1st fl, 2ndfl, 3rd fl, & 5th fl. noted: old 2x4, plaster, sheetrock & other
Sep 25, 2007 · Penalty $1,000
Resolve - Non-hazardous
Work does not conform to approved plans. work noted: at the time of inspection of job #104871373 plan date 08.22.07. the work in progress demo work on 1st fl rear, 2nd - 5th fl demo. 1st fl on plan ( ). the
Sep 25, 2007
Resolve - Non-hazardous
Work w/o a permit. work noted: on 2nd fl & 3rd fl. gut/demo to interior walls & ceiling partial new metal framing to ceiling & walls. also noted plumbing riser installed throughout. remedy- stop all work.
Jul 9, 2007 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Apartment only
Dec 20, 2022 · Apt 5R
Close - Heat/hot water
Apartment only
Nov 19, 2022 · Apt 5R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1880
- Floors
- 5
- Residential units
- 11
- Building area
- 8,160 ft²
- Lot area
- 1,958 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 463 / 44
- Assessed value
- $2,292,750
- Landmark / historic district
- East Village / Lower East Side Historic District
HPD registration #143769, last renewed Aug 29, 2025.
Questions about 27 East 7 Street
Who owns 27 East 7 Street?
The owner of record in NYC Department of City Planning PLUTO data is 27 E. 7th St LLC.
Does 27 East 7 Street have violations?
Yes. NYC HPD has recorded 3 housing violations at this property.
Is 27 East 7 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 27 East 7 Street built?
City records list 1880 as the year it was built.
How many apartments are in 27 East 7 Street?
It has 11 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.