roofy

56 St Marks Place

Manhattan, NY 10003BBL 1-00449-0017Map

Owner of record: St. Marks Equities,

56 St Marks Place is an elevator apartment building built in 2005 in Manhattan, 10003. It has 24 residential units across 8 floors. The owner of record is St. Marks Equities,. HPD has recorded 15 housing violations here, most recently on October 15, 2023. 6 of the 15 most recent violations are still open.

HPD violations
15
DOB violations
18
ECB violations
31
HPD complaints
133

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Oct 15, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 15

  • C

    Replace or repair the self-closing doors that is missing or defective hinges, in the entrance located at apt 9c, 8th story, 1st apartment from south at west

    Oct 15, 2023 · Apt 9C

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 16, 2022

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 1st apartment from north at east

    Oct 23, 2019 · Apt 4A

    Closed — Violation closed
  • C

    Replace with new the broken or defective broken glass panel at awning at entrance to building, , 1st story

    May 11, 2016

    Closed — Violation closed
  • C

    Replace with new the broken or defective glass at canopy over stoop at building front entrance

    May 8, 2016

    Closed — Violation closed
  • C

    Replace with new the broken or defective shattered safety glass panel, at overhead awning entrance to building , 1st story

    Apr 5, 2016

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 25, 2016

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 1, 2015

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 4b, 4th story, 2nd apartment from north at east

    Jun 6, 2015 · Apt 4B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4b, 4th story, 2nd apartment from north at east

    Jun 6, 2015 · Apt 4B

    Closed — Violation dismissed
Show 5 more ↓
  • A

    Provide adequate supply of cold water for the fixtures at patio spigot located at apt 4b, 4th story

    Jun 6, 2015 · Apt 4B

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Oct 4, 2011

    Open — First no access to re- inspect violation
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Oct 4, 2011

    Open — First no access to re- inspect violation
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing sign at lobby at public hall, 1st story

    Oct 4, 2011

    Open — First no access to re- inspect violation
  • I

    D26-35.01 adm code the premises have been vacated by an order of this department and cannot be reoccupied except for caretaker until a new certificate of occupancy has been obtained.

    Jul 13, 1977

    Open — First no access to re- inspect violation

DOB building violations · 18

  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 2, 2014

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 18, 2012

    Dob violation - resolved
Show 8 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 14, 2009

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 21, 2008

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Jun 10, 2006

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    C-construction other optional

    May 27, 2006

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Apr 24, 2006

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 24, 1997

    Vp*-violation unserved ecb- dismissed

ECB violations · 31

  • Class - 2

    Failure to submit an acceptable required cycle 8a and 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#914570.agg1 prior nov#37021123n

    Dec 9, 2022 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle8a report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#814570.agg1:prior nov37011084k under 28-302.4 su

    Apr 1, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control#814570. remedy: submit required technical report

    May 18, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by the c of o. noted: observed at time of inspection the apt#1a/2a at the cellar & baement level has no windows. according to the c of o#102757401f in the cellar level suppose

    Feb 16, 2018 · Penalty $1,200

    Resolve
  • Class - 1

    97x10. wheelchair lift not operative.return to service.

    Sep 11, 2015 · Penalty $250

    Resolve
  • Class - 2

    97xx,05l16.#97-elevator is out of service return to service asap.#05-home restrictor.

    Jul 5, 2014

    Resolve
  • Class - 2

    Altered/changed bldg occupied w/out a valid c/o as per 28-118.3.1/28-118.3.2.defect noted:@ time of inspection the temp c/o under application #102757401t003 has expired as of 05-12-2008.rem-obtain valid c/o or

    Mar 10, 2010

    Resolve
  • Class - 2

    Failure to maintain building wall or appurtenances. noted: at front entrance to building lobby exposure #1 glass awning covering steps to entrance shattered glass panel in danger of shattering & falling complet

    Oct 6, 2009

    Resolve
  • Class - 3

    Occupancy contrary to that allowed by the c of o: noted: cellar basement 1st flr occupied at basement marked 1st flr by laundry rm,boiler rm,compactor rm,etc plus 4 apts. 1a,1b(1c occupied 2 bdrms,1d occupied 2

    Oct 6, 2009

    Resolve
  • Hazardous

    No approved plans for the crane.failure to get a certificate of on -site approval. no 10 e form on site.

    Jul 3, 2006 · Penalty $1,500

    Resolve
Show 21 more ↓
  • Hazardous

    Failure to provide adequate protection for sidewalk during constr. operations. in that constr. has reached a height of over 40 ft & no sidewalk shed has been provided to protect sidewalk as required. remedy: st

    Jan 31, 2006 · Penalty $2,000

    Resolve
  • Non-hazardous

    Work does not conform to approved plans.non-conforming work noted:aiti# 102757401 app. sept 22, 2003,exp 4-29-05. excavation of (1)pit to accomadate footing for temp. shoring of existing temp shoring of adjacen

    Apr 7, 2005 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain: observed cracks in plaster walls in ceiling in apt 4g as well as in hallway from 1st to 4th flrs. telltales posted incracks on hallways. remedy: submit structural report by p.e. or r.a. &

    Nov 11, 2004 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work without a permit work noted installing structual steel the 2nd and 3rd floors for shoring and bracing of exterior walls without first obtaining permits and approvals as required.remedy:obtain permit and ap

    Apr 16, 2004 · Penalty $500

    Resolve
  • Hazardous

    Work contrary to approved department of bldg plans and application 102757401.in that exterior walls at front and rear have been demolished to 2nd story level contrary to plans.remedy:stop all work expired

    Feb 26, 2004

    Resolve
  • Hazardous

    Failure to file tri for underpinning prior to start of controlled workremedy:file form tri

    Feb 11, 2004

    Resolve
  • Hazardous

    Failure to safeguard public and property effected by construction operations violations noted:the followinf unsafe hazardous condition existed:(1)work men throwing demolition debris from 5ft floor rear into

    Dec 5, 2003

    Resolve
  • Hazardous

    Failure to provide required means of egress from all floors.violation noted:the only means of egress provide was through hole cut through adj.bldg @ 54 st marks place.note existing stairs were demolished and

    Dec 5, 2003 · Penalty $480

    Resolve
  • Non-hazardous

    Failure to provide approved plans at construction site.violation noted:contractor failed to provide approved plans at construction site at time of inspection work in progress noted:all interior existing floor

    Dec 5, 2003 · Penalty $250

    Resolve
  • Non-hazardous

    Work w/out a permit fence. department of bldg show that a permit was not obtained for 8'-0" plywood fence erected at the front of bldg(at st marks place n side)remedy:obtain fence permit

    Dec 5, 2003 · Penalty $400

    Resolve
  • Hazardous

    Failure to protect adjacent property.violation noted:demolition debristhat were been thrown off 5 floor into rear backyard fell inside west side and rear of adjacent property at 58 st marks place.remedy:stop

    Dec 5, 2003

    Resolve
  • Hazardous

    Work w/out a permit.violation noted:all plumbing piping and fixtures bath and kitchen 1st to 5th flr was removed.however department of bldg records show that a valid plumbing was not obtained prior to the

    Dec 5, 2003 · Penalty $800

    Resolve
  • Hazardous

    Improper / defective installation of scaffold to building. upon inspection at the above property scaffold was on to sidewalk shed up to roof and not properly secure to building. remedy: secure scaffold as per

    Dec 9, 2002

    Resolve
  • Non-hazardous

    Failure to maintain siddewalk shed noted at sidewalk shed approx 24'longx14'high constructed of plywood 3x10 post 2x4 bravcing has had a section of west end suport post large chunk of wood

    Sep 6, 2002 · Penalty $1,000

    Resolve
  • Non-hazardous

    Fsailure to obtain permit for sidewalk shed fence noted a sidewalk fence constructed of plywood and 2x4 wood studs size approx 24'x10' has been improperly built and without permits it has loose and buldging se

    Sep 6, 2002 · Penalty $400

    Resolve
  • Hazardous

    Improper / defective installation of scaffold to building at time of inspection pipe scaffold was erected on the top of sidewalk shed up to roof which was not rigidly tied to builidng only wire was provided. re

    Aug 20, 2002 · Penalty $1,000

    Resolve
  • Non-hazardous

    No design drawing for scaffold was erected on the top of sidewalk shedupto roof. and no design drawing was available remedy : obtian a design drawing for auditect or engineer

    Aug 20, 2002

    Resolve
  • Hazardous

    Failure to safeguardpublic and property affected by construction operations.noted:renovation at 56 st mark:place with permit #102757401 exp 2/18/02 and dates plans 4/19/01 has installation of 12 guage metal joi

    Aug 17, 2001

    Resolve
  • Non-hazardous

    51-boiler (weil mclawn)gas was sealed because of chimney being clogged up.at base (boiler sealed)

    Jul 2, 2001 · Penalty $400

    Resolve
  • Hazardous

    No guard rails. noted: new floor framing in progress. no guard rails at saftways ends of floors creating hazardous working coorditions. locations: all floors. remedy: stop all work immedratory other than instal

    Jun 18, 2001 · Penalty $1,000

    Resolve
  • Non-hazardous

    Failure to maintain exterior bldg.wall noted:badly spalling stairs & entrance way stone linter above entrance is cracked and badly spalling windows at 1st & 3rd fl.broken location:front of bldg.remedy:repair al

    Mar 20, 2000 · Penalty $2,500

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Jan 26, 2026 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Oct 20, 2023 · Apt 9C

    Close
  • Heat/hot water

    Apartment only

    Oct 14, 2023 · Apt 9C

    Close
  • Heat/hot water

    Apartment only

    Dec 3, 2019 · Apt 5C

    Close
  • Heat/hot water

    Entire building

    Nov 21, 2019 · Apt 7A

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 19, 2019 · Apt 4A

    Close
  • Plumbing

    Water supply

    Oct 13, 2019 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Dec 17, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 17, 2018 · Apt 2B

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Dec 17, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 17, 2018 · Apt 8A

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2018 · Apt 1D

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2018 · Apt 4B

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2018 · Apt 8D

    Close
  • Heat/hot water

    Apartment only

    Dec 15, 2018 · Apt 7C

    Close
  • Heat/hot water

    Entire building

    Dec 10, 2018 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Dec 9, 2018 · Apt 7C

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2018 · Apt 7C

    Close
  • Heat/hot water

    Entire building

    Nov 28, 2018 · Apt 8D

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2018 · Apt 6C

    Close
  • Heat/hot water

    Entire building

    Nov 23, 2018 · Apt 9B

    Close
  • Heat/hot water

    Entire building

    Nov 23, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 23, 2018 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Nov 18, 2018 · Apt 7C

    Close
  • Heat/hot water

    Entire building

    Nov 18, 2018 · Apt 7C

    Close
  • Heat/hot water

    Apartment only

    Nov 15, 2018 · Apt 7C

    Close
  • Heat/hot water

    Apartment only

    Nov 15, 2018 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Nov 14, 2018 · Apt 8D

    Close
  • Heat/hot water

    Entire building

    May 18, 2016 · Apt BLDG

    Close
  • Safety

    Window guard broken/missing

    May 10, 2016 · Apt BLDG

    Close
  • Safety

    Window guard broken/missing

    May 10, 2016 · Apt 5C

    Close
  • Plumbing

    Water supply

    May 10, 2016 · Apt 5C

    Close
  • Heat/hot water

    Entire building

    May 10, 2016 · Apt 5C

    Close
  • Heat/hot water

    Entire building

    May 4, 2016 · Apt 7C

    Close
  • Heat/hot water

    Entire building

    Apr 30, 2016 · Apt 6D

    Close
  • Heat/hot water

    Entire building

    Apr 30, 2016 · Apt 1D

    Close
  • Heat/hot water

    Entire building

    Apr 30, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 29, 2016 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2016 · Apt 5C

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2016 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2016 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2016 · Apt 6D

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2016 · Apt 4C

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2016 · Apt 1D

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2016 · Apt 2C

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2016 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2016 · Apt 6D

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
2005
Floors
8
Residential units
24
Building area
16,454 ft²
Lot area
4,876 ft²
Zoning
R8B
Community board
103
Council district
2
Block / lot
449 / 17
Assessed value
$3,727,800
Landmark / historic district
No

HPD registration #107831, last renewed Oct 24, 2025.

Questions about 56 St Marks Place

Who owns 56 St Marks Place?

The owner of record in NYC Department of City Planning PLUTO data is St. Marks Equities,.

Does 56 St Marks Place have violations?

Yes. NYC HPD has recorded 15 housing violations at this property.

Is 56 St Marks Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 56 St Marks Place built?

City records list 2005 as the year it was built.

How many apartments are in 56 St Marks Place?

It has 24 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.