330 East 6 Street
Manhattan, NY 10003BBL 1-00447-0021Map
Owner of record: 330 E 6 LLC
330 East 6 Street is a walk-up apartment building built in 1863 in Manhattan, 10003. It has 9 residential units across 5 floors. The owner of record is 330 E 6 LLC. HPD has recorded 8 housing violations here, most recently on October 3, 2023.
- HPD violations
- 8
- DOB violations
- 6
- ECB violations
- 19
- HPD complaints
- 12
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 8
- BHazardous
Repair the roof so that it will not leak at ceiling and west wall in the 4th room from east located at apt 5r, 5th story, 1st apartment from east at south
Oct 3, 2023 · Apt 5R
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 4th room from east located at apt 5r, 5th story, 1st apartment from east at south
Oct 3, 2023 · Apt 5R
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling and south wall in the 3rd room from north located at apt 5r, 5th story, 1st apartment from east at south
Oct 3, 2023 · Apt 5R
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 3rd room from north located at apt 5r, 5th story, 1st apartment from east at south
Oct 3, 2023 · Apt 5R
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling and south wall in the 2nd room from east located at apt 5r, 5th story, 1st apartment from east at south
Oct 3, 2023 · Apt 5R
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 2nd room from east located at apt 5r, 5th story, 1st apartment from east at south
Oct 3, 2023 · Apt 5R
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 5, 2018
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor - missing , 1st story
Jul 31, 2016
Closed — Violation dismissed
DOB building violations · 6
- Construction other optional
Stop all work. failure to provide approved plans at job site at time o f inspection. noted: an active site under permit#104792913 and plans p rovided missing details for stuctural connections and underpinning at cellar level. remedy: stop all work. provide/amend plans. call excava tion unit for swo re-inspection at 212 442-1544
Nov 22, 2008
Dob violation - dismissed - Construction other optional
Stop all work. work without permit. noted: at time of inspection work ongoing under permit 104792413 for alti at 6 stories building and not permit for variance to work during weekend. remedy: stop all work. obt ain permit. call excavation unit for re-inspecition at 212 442-1544
Nov 22, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 10, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 19
- Class - 1
Provision of law 27-1009(a) stop all work. miscellaneous violation. failure to provide 3 feet 6 inch guardrail at all floor and perimeter openings. noted: at time of inspection work ongoing under permit # 1047
Nov 22, 2008
Resolve - Class - 1
Provision of law 26-230 stop all work. miscellaneous violations. failure to protect adjoining roofs, skylights, chimneys and outlets affected by construction noted: at time of inspection an active site job #104
Nov 22, 2008
Resolve - Hazardous
27-132 gut renovation shoring & bracing dwgs are inadequate plans are not complete & do not indicate entire nature & extent of lfoor reconstruction & foundation wrk foundations are affected by new bldg proposed
Jun 17, 2008
Resolve - Hazardous
27-157 gut renovation, shoring & bracing dwgs are inadequate plans are not complete & do not indicate entire nature & extent of floor reconstruction & foundation work foundations are affected by alt bldg propos
Jun 17, 2008 · Penalty $800
Resolve - Hazardous
No job site fence - noted there is construction in progress and escavation in progress. there is no 8ft solid fence. in south, elevation #3,rear of building. remedy: provide job site fence. call best for reinsp
Jun 10, 2008 · Penalty $1,000
Resolve - Hazardous
27-147 work w/o a permit. noted there is a construction fence on site in north, elevation #1 approx 14ft there is no design drawings or permit for a fence over 8ft. remedy: make fence conform to code 8ft./obtai
Jun 10, 2008 · Penalty $800
Resolve - Hazardous
Work w/o a permit. noted excavation is in progress in cellar there is no permit available for inspection and not in bis system. remedy: stopall work, obtain permit, provide engineers report for stability, retur
Jun 10, 2008
Resolve - Hazardous
27-1015 no design drawing for high bridge/sidewalk shed. at time of inspection there is a bridge over sidewalk on e 6th st it is approx 14ftin height. no drawing are available for inspection. remedy: conform to
Jun 10, 2008 · Penalty $800
Resolve - Hazardous
Failure to provide at least 2 means of egress - noted there is construction in progress with fine escape as 2nd means of egress. there is sidewalk shed in front north elevation #1. the deck and the column and
Jun 10, 2008 · Penalty $400
Resolve - Hazardous
No fdny permit for storage & use of compressed gases. noted there is 2 tanks on 2nd flr there is no permit (yellow copy) available for inspection. remedy: remove tanks immediately and obtain permit.
Jun 10, 2008 · Penalty $800
Resolve
Show 9 more ↓
- Hazardous
27-1009(a) no guardrails - noted there are no guard rails on rear of building south elevation #3 at perimeter, men are working outside guardrails that are set in approx 9ft in. there also missing at ground leve
Jun 10, 2008 · Penalty $1,250
Resolve - Non-hazardous
Drainage system not in accordance with rs-16. location: kitchen, no air break between grease trap and pot sink, remedy: modify drainage system to conform with rs-16
Mar 14, 2003
Resolve - Hazardous
B4b/50a/50b/50c/50d/50e/34a/34b/38/50f/50g/51. 51 flue from boiler to chemney rotted out. 50a pressure relief valve to be fixed. 50b no steam guage an fistail. 50c pegtail required for pressure tall. (50d) pigt
Mar 3, 2003 · Penalty $400
Resolve - Non-hazardous
Having an installed an awning without a permit. remedy: remove illegal work
Jan 21, 2003
Resolve - Non-hazardous
Having a ground sign projecting beyond the street line. remedy: remove illegal work
Jan 21, 2003
Resolve - Non-hazardous
Having a prohibited illuminated sign in a r7.2 district. remedy: remove illegal signage
Jan 21, 2003
Resolve - Non-hazardous
Residental bldg having a name plate larger than one sq ft. residental bldg having a name plate indicating more than the name and address of the occupant or occupation. remedy:remove illegal signage.
Jan 21, 2003
Resolve - Non-hazardous
Having an identification sign wiht letters an area more than 12 sq ft. remedy:remove illegal signage
Jan 21, 2003
Resolve - Non-hazardous
Having a sign projecting more than 12in across the street line. remedyremove illegal signage
Jan 21, 2003
Resolve
Complaints
- Unsanitary condition
Sewage
Jul 14, 2025 · Apt 1R
Close - Water leak
Slow leak
Sep 29, 2023 · Apt 5R
Close - Water leak
Heavy flow
Sep 29, 2023 · Apt 5R
Close - Unsanitary condition
Pests
Dec 9, 2022 · Apt 1F
Close - Plumbing
Water supply
Feb 4, 2022 · Apt 401
Close - Plumbing
Water supply
Feb 4, 2022 · Apt BLDG
Close - Unsanitary condition
Pests
Sep 1, 2019 · Apt 3R
Close - Electric
Wiring
Jul 15, 2016 · Apt 1F
Close - Electric
Outlet/switch
Jul 15, 2016 · Apt 1F
Close - Heat/hot water
Apartment only
Feb 27, 2016 · Apt 2F
Close
Show 2 more ↓
- Heating
Heat related
Jan 25, 2011 · Apt 5F
Close - Heating
Heat related
Mar 27, 2004 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1863
- Floors
- 5
- Residential units
- 9
- Building area
- 12,125 ft²
- Lot area
- 2,425 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 447 / 21
- Assessed value
- $4,417,200
- Landmark / historic district
- East Village / Lower East Side Historic District
HPD registration #100190, last renewed Oct 16, 2025.
Questions about 330 East 6 Street
Who owns 330 East 6 Street?
The owner of record in NYC Department of City Planning PLUTO data is 330 E 6 LLC.
Does 330 East 6 Street have violations?
Yes. NYC HPD has recorded 8 housing violations at this property.
Is 330 East 6 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 330 East 6 Street built?
City records list 1863 as the year it was built.
How many apartments are in 330 East 6 Street?
It has 9 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.