50 East 1 Street
Manhattan, NY 10003BBL 1-00443-0052Map
Owner of record: P H A Cooper Cp
50 East 1 Street is a walk-up apartment building built in 1910 in Manhattan, 10003. It has 20 residential units across 5 floors. The owner of record is P H A Cooper Cp. HPD has recorded 25 housing violations here, most recently on May 11, 2026. 2 of the 25 most recent violations are still open.
- HPD violations
- 25
- DOB violations
- 3
- ECB violations
- 3
- HPD complaints
- 32
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
May 11, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3, 1st story, 2nd apartment from south at west
Mar 29, 2026 · Apt 3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 1st story, 2nd apartment from south at west
Mar 29, 2026 · Apt 3
Open — Defect letter issued - BHazardous
Replace with new the missing radiator air valve in the 1st room from north located at apt 3, 1st story, 2nd apartment from south at west
Mar 29, 2026 · Apt 3
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Mar 29, 2026
Open — False certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3, 1st story, 2nd apartment from south at west
Mar 29, 2026 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles at public hall, 2nd story
Mar 29, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall at public hall, 2nd story
Mar 29, 2026
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye device installed at vestibule door , 1st story
Mar 29, 2026
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeding the maximum allowable temperature of 130f at all hot water fixtures in the entire apartment located at apt 3, 1st story, 2nd apartment from south at west
Mar 29, 2026 · Apt 3
Closed — Violation closed
Show 15 more ↓
- ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories and all balconies, at building front at fire escape
Aug 27, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 19, 5th story, 1st apartment from east at south
Jan 23, 2022 · Apt 19
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at public hall, 1st story
Jan 23, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective metal cornice parapet wall at roof at building front
Dec 13, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Dec 13, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 13, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Dec 13, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Dec 13, 2021
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Dec 13, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective metal tread, 10th from bottom at stairs at building entrance
Aug 31, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 16, 4th story, 1st apartment from west at north
Sep 6, 2019 · Apt 16
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 16, 4th story, 1st apartment from west at north
Sep 6, 2019 · Apt 16
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north located at apt 16, 4th story, 1st apartment from west at north
Sep 6, 2019 · Apt 16
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective mortar at west wall in the 1st room from north located at apt 16, 4th story, 1st apartment from west at north
Sep 6, 2019 · Apt 16
Closed — Violation dismissed
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 22, 2012
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 3
- Class - 1
Failure to maintain building in a code compliant manner. observed at first floor rear ceiling in lobby a 2'x2' section is disrepair and in danger of collapsing due to what appears to be a severe water leak., re
Jul 20, 2023 · Penalty $1,250
Resolve - Class - 1
B154,51,50a,50b,50c,50d,50e. 50a-defective chimney; 50c-jacket corroded;50b-pipe hot water relief valve discharge down;50d-chimney may collapse;50e-do not operate coiler until all unsafe conditions are immedia
Jan 22, 2013 · Penalty $1,000
Resolve - Class - 1
Work w/o a permit: at the basement level on the west side of the bldg.having removed all the ceiling fire rated ceiling approx 24'x 68' in area commercial space. stop all work obtain a stop work rescind order
May 21, 2012 · Penalty $1,600
Resolve
Complaints
- Heat/hot water
Apartment only
Mar 28, 2026 · Apt 3
Close - Plumbing
Bathtub/shower
Mar 28, 2026 · Apt 3
Close - Unsanitary condition
Pests
Mar 28, 2026 · Apt 3
Close - Plumbing
Radiator
Mar 28, 2026 · Apt 3
Close - Flooring/stairs
Floor
Mar 25, 2026 · Apt 3
Close - Plumbing
Steam pipe/riser
Mar 25, 2026 · Apt 3
Close - Plumbing
Bathtub/shower
Mar 25, 2026 · Apt 3
Close - Unsanitary condition
Pests
Mar 25, 2026 · Apt 3
Close - Unsanitary condition
Pests
Mar 25, 2026 · Apt 3
Close - Appliance
Refrigerator
Mar 25, 2026 · Apt 3
Close
Show 22 more ↓
- Paint/plaster
Ceiling
Mar 25, 2026 · Apt 3
Close - Appliance
Electric/gas range
Aug 24, 2023 · Apt 17
Close - General
Cooking gas
Aug 24, 2023 · Apt 17
Close - Paint/plaster
Ceiling
Aug 2, 2023 · Apt 17
Close - General
Cooking gas
Aug 2, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 10, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2022 · Apt BLDG
Close - Plumbing
Water supply
Nov 23, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 18, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 10, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 23, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 30, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 28, 2021 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 27, 2019 · Apt 16
Close - Heat/hot water
Entire building
Apr 23, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2018 · Apt 2
Close - Heat/hot water
Entire building
Apr 11, 2014 · Apt 5B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1910
- Floors
- 5
- Residential units
- 20
- Building area
- 8,536 ft²
- Lot area
- 2,423 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 443 / 52
- Assessed value
- $1,108,350
- Landmark / historic district
- No
HPD registration #116929, last renewed Oct 23, 2025.
Questions about 50 East 1 Street
Who owns 50 East 1 Street?
The owner of record in NYC Department of City Planning PLUTO data is P H A Cooper Cp.
Does 50 East 1 Street have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 50 East 1 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 50 East 1 Street built?
City records list 1910 as the year it was built.
How many apartments are in 50 East 1 Street?
It has 20 residential units and 22 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.