roofy

279 East 10 Street

Manhattan, NY 10009BBL 1-00438-0038Map

Owner of record: 279 E. 10th LLC

279 East 10 Street is a walk-up apartment building built in 1910 in Manhattan, 10009. It has 16 residential units across 5 floors. The owner of record is 279 E. 10th LLC. HPD has recorded 22 housing violations here, most recently on September 17, 2026. 2 of the 22 most recent violations are still open.

HPD violations
22
DOB violations
6
ECB violations
11
HPD complaints
95

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 17, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 22

  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1r, 1st story, 1st apartment from south at west

    Sep 17, 2026 · Apt 1R

    Open — First no access to re- inspect violation
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder secure using appropriate nuts and bolts at north exterior wall fire escape. at fire escape

    Jul 23, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    Jul 23, 2026

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... approximately 10 sq ft at the north wall at lower level in the 1st room from north located at apt 1r, 1st story, 1st apartment from south at west

    Jan 11, 2024 · Apt 1R

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department the east wall at lower level in the 1st room from north located at apt 1r, 1st story, 1st apartment from south at west

    Jan 11, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at east wall at lower level in the 1st room from north located at apt 1r, 1st story, 1st apartment from south at west

    Jan 11, 2024 · Apt 1R

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the 2nd room from north located at apt 1r, 1st story, 1st apartment from south at west

    Jan 11, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections wash basin and water closet in-conjuction with upper level at cellar in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Oct 5, 2023 · Apt 1R

    Closed — Violation dismissed
  • B

    Discontinue use of rooms for living purposes two sleeping rooms erected in-conjuction with upper level at cellar in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Oct 5, 2023 · Apt 1R

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partitions erected creating rooms in-conjuction with upper level at cellar in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Oct 5, 2023 · Apt 1R

    Closed — Violation dismissed
Show 12 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective hinge at door leading to rear yard in the 1st room from north located at apt 1r, 1st story, 1st apartment from south at west

    Oct 5, 2023 · Apt 1R

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood fence erected dividing two parts at rear yard

    Oct 5, 2023

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... 40 sq ft at south wall, section of west at cellar

    Oct 5, 2023

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6, 3rd story, 1st apartment from north at east

    Jan 23, 2022 · Apt 6

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6, 3rd story, 1st apartment from north at east

    Jan 23, 2022 · Apt 6

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at public hall, 1st story

    Jan 23, 2022

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 6, 3rd story, 1st apartment from north at east

    Jan 23, 2022 · Apt 6

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 25, 2019

    Closed — Violation dismissed
  • A

    Remove device preventing door from being self-closing hook and eye bolt at building door from street to vestibule

    Mar 4, 2014

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household item(long bench...)at 1st story public hall

    Mar 4, 2014

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of household items (water fountain bottles...)at 2nd story public hall

    Mar 4, 2014

    Closed — Violation dismissed
  • B

    D26-10.01, 10.05 adm code fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate 4th sty rear east apt 10. located at apt 10

    Apr 28, 1989 · Apt 10

    Closed — Violation dismissed

DOB building violations · 6

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 11

  • Class - 1

    Permanent dwelling used/converted for other than permanent residentialpurposes. department of buildings records indicates the premises to belegally approved as a class "a" multiple dwelling. illegal occupancy n

    Aug 14, 2026 · Penalty $57,500

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner. lack of required number of means of egress for every floor as per bc 1018.1(2008 code), 27-366, b. c. 1021.1(2014 code); b. c. 1006.3(2022 code) for transi

    Aug 14, 2026 · Penalty $6,250

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner. lack of a system of automatic sprinkler where is required as per b.c. 903.2 and 27-954 for transient use at unit #1 on the 2nd floor. previous violation #3

    Aug 14, 2026 · Penalty $6,250

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner. failure to provide fire alarm system class "j" as per b. c. 907.2.8 for transient useat unit #1 on the 2nd floor. previous violation #35725778r. remedy: di

    Aug 14, 2026 · Penalty $6,250

    Active
  • Class - 2

    Permanent dwelling used/converted for other than permanent residentialpurposes. department of buildings records indicates premises to be legally approved as a class "a" multiple dwelling. illegal occupancy note

    Jan 29, 2026 · Penalty $10,000

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner. lack of required number of means of egress for every floor as per b. c. 1018.1(2008 code), 27-366; b. c. 1021.1(2014 code); b. c. 1006.3(2022 code) for tra

    Jan 29, 2026 · Penalty $12,500

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner. lack of a system of automatic sprinkler where is required as per b. c. 903.2 and 27-954, for transient use at apartment #1 on the 2nd floor. remedy: discon

    Jan 29, 2026 · Penalty $12,500

    Active
  • Class - 1

    B. c. 907.2.8. failure to maintain building in a code-compliant manner. failure to provide fire alarm system class "j" as per b. c. 907.2.8,for transient use at apartment #1 on the 2nd floor. remedy: discontinu

    Jan 29, 2026 · Penalty $12,500

    Active
  • Class - 1

    Occupancy contrary to that allowed by the cert of occupancy or buildings dept records. cellar recreation rooms (2) identified on signed off job #122227580 have been converted to (2) bedrooms with no natural lig

    Nov 27, 2023 · Penalty $6,250

    Resolve
  • Class - 2

    Work does not conform to approved construction documents.noted:@ 5th flr the flr has been leveled using nominal 2"x6"bolted to existing joist with no detail for same in approved construction documents.aslo @

    Dec 15, 2010 · Penalty $2,500

    Resolve
Show 1 more ↓
  • Class - 1

    Failure to maintain bldg wall; noted: at exp #1 front exterior wall, masonry lintel broken-off-cracked at 2nd flr window also between 2nd and 3rd flr windows east side of exp #1 bricks bulging, misaligned

    Oct 14, 2009 · Penalty $1,000

    Resolve

Complaints

  • Water leak

    Heavy flow

    Sep 8, 2026 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Sep 8, 2026 · Apt 1R

    Close
  • Water leak

    Heavy flow

    Jul 18, 2026 · Apt BASEME

    Close
  • Unsanitary condition

    Mold

    Nov 27, 2023 · Apt 1R

    Close
  • Water leak

    Heavy flow

    Nov 27, 2023 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Oct 30, 2023 · Apt 1R

    Close
  • Water leak

    Heavy flow

    Oct 30, 2023 · Apt 1R

    Close
  • Water leak

    Heavy flow

    Sep 30, 2023 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Sep 30, 2023 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Apr 6, 2022 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Apr 3, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 30, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 15, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 14, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 14, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 12, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 11, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 10, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 18, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 17, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 16, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 15, 2022 · Apt 14

    Close
  • Heat/hot water

    Entire building

    Feb 15, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 13, 2022 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2022 · Apt 4

    Close
  • Heat/hot water

    Apartment only

    Feb 2, 2022 · Apt 15

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2022 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2022 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2022 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2022 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2022 · Apt 9

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2022 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Jan 23, 2022 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Jan 22, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 18, 2022 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Apr 17, 2018 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Apr 17, 2018 · Apt 1R

    Close
  • Water leak

    Heavy flow

    Apr 17, 2018 · Apt 1R

    Close
  • Plumbing

    Water supply

    Mar 8, 2018 · Apt 16

    Close
  • Plumbing

    Water supply

    Mar 8, 2018 · Apt 16

    Close
  • Unsanitary condition

    Pests

    Mar 8, 2018 · Apt 16

    Close
  • Water leak

    Slow leak

    Mar 8, 2018 · Apt 16

    Close
  • Unsanitary condition

    Pests

    Feb 24, 2018 · Apt 16

    Close
  • Heat/hot water

    Entire building

    Feb 11, 2018 · Apt 12

    Close
  • Plumbing

    Water supply

    Dec 27, 2016 · Apt 16

    Close
  • Plumbing

    Water supply

    Dec 27, 2016 · Apt 16

    Close
  • Plumbing

    Water supply

    Dec 27, 2016 · Apt 9

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1910
Floors
5
Residential units
16
Building area
7,755 ft²
Lot area
2,369 ft²
Zoning
R8B
Community board
103
Council district
2
Block / lot
438 / 38
Assessed value
$1,631,700
Landmark / historic district
No

HPD registration #128489, last renewed Sep 11, 2025.

Questions about 279 East 10 Street

Who owns 279 East 10 Street?

The owner of record in NYC Department of City Planning PLUTO data is 279 E. 10th LLC.

Does 279 East 10 Street have violations?

Yes. NYC HPD has recorded 22 housing violations at this property.

Is 279 East 10 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 279 East 10 Street built?

City records list 1910 as the year it was built.

How many apartments are in 279 East 10 Street?

It has 16 residential units and 18 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.