162 1 Avenue
Manhattan, NY 10009BBL 1-00437-0008Map
Owner of record: 246 East 10th Street LLC
162 1 Avenue is a walk-up apartment building built in 1900 in Manhattan, 10009. It has 7 residential units across 4 floors. The owner of record is 246 East 10th Street LLC. HPD has recorded 345 housing violations here, most recently on June 20, 2024.
- HPD violations
- 345
- DOB violations
- 25
- ECB violations
- 16
- HPD complaints
- 430
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 345
- BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at sink in the 1st room from east located at bsmt-apt bsmt, 1st bsmt-apt from south at west
Jun 20, 2024 · Apt BSMT
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at in the bathroom located at bsmt-apt bsmt, 1st bsmt-apt from south at west
Jun 20, 2024 · Apt BSMT
Closed — Violation closed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at celing at basement
Jun 20, 2024
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at north wall in the 1st room from east located at bsmt-apt bsmt, 1st bsmt-apt from south at west
Jun 20, 2024 · Apt BSMT
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective leading to the south yard at public hall, 1st story
Apr 19, 2024
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 15, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retarding material at ceiling ( northsection ) section at cellar
Nov 15, 2021
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Properly repair the source and abate the evidence of a water leak ceiling ( near sewer line ) north section at cellar
Nov 15, 2021
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling at boiler room
Nov 15, 2021
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retarding material at ceiling at boiler room
Nov 15, 2021
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective eroded mortar joints at south exterior wall 3 stys from top down
Jul 15, 2021
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 1, 2021
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 3, 3rd story, 1st apartment from east at south
Feb 25, 2021 · Apt 3
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective bldg entrance at public hall, 1st story
Feb 25, 2021
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 6, 4th story, 1st apartment from east at south
Feb 25, 2021 · Apt 6
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective reglaze bathtub in the bathroom located at apt 6, 4th story, 1st apartment from east at south
Feb 25, 2021 · Apt 6
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation heat riser in the bathroom located at apt 6, 4th story, 1st apartment from east at south
Feb 25, 2021 · Apt 6
Closed — Violation closed - ANon-hazardous
Post and maintain a notice, written in english and in spanish, on the building entrance door or other conspicuous location in the building common area, stating that: (1) the building is in the alternative enforcement program, (2) that occupants may call 311 or the aep at 212-863-8262 to report housing maintenance complaints, (3) the name, telephone, and address of the owner, and, (4) the identity of any financial institution that holds a mortgage on the property. post
Feb 25, 2021
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system cellar door lock at front yard
Feb 25, 2021
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
Feb 25, 2021 · Apt 3
Closed — Violation dismissed - IInformation / order
The premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. charges for repair work done pursuant to this order, if not paid, will become liens on the property
Feb 1, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective cement mortar at north/east corner of parapet wall at cornice, 4th story
Nov 5, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk. at front areaway, 1st story
Nov 5, 2020
Closed — Violation closed - BHazardous
Properly repair the broken or defective mechanical vent at ceiling in the bathroom located at apt 6, 4th story, 1st apartment from east at south
Jul 8, 2020 · Apt 6
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 6, 4th story, 1st apartment from east at south
Jul 8, 2020 · Apt 6
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathroom located at apt 6, 4th story, 1st apartment from east at south
Jul 8, 2020 · Apt 6
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective mortar joint east parapet wall
Apr 23, 2020
Closed — Violation closed - BHazardous
Properly repair the broken or defective mechanical vent at ceiling in the 1st bathroom from north located at apt 6, 4th story, 1st apartment from west at north
Apr 23, 2020 · Apt 6
Closed — Violation closed - BHazardous
Properly secure the loose secure wash basin at north wall in the 1st bathroom from north located at apt 6, 4th story, 1st apartment from west at north
Apr 23, 2020 · Apt 6
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the 1st bathroom from north located at apt 6, 4th story, 1st apartment from west at north
Apr 23, 2020 · Apt 6
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
Apr 17, 2020
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 17, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 17, 2020
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 6, 4th story, 1st apartment from east at south
Apr 17, 2020 · Apt 6
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 6, 4th story, 1st apartment from east at south
Apr 17, 2020 · Apt 6
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the 1st bathroom from north located at apt apt6, 4th story, 1st apartment from east at south
Jan 28, 2020 · Apt APT6
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective mechanical ventilation at ceiling in the 1st bathroom from north located at apt apt6, 4th story, 1st apartment from east at south
Jan 28, 2020 · Apt APT6
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlet at west wall in the 2nd room from north at west located at apt apt6, 4th story, 1st apartment from east at south
Jan 28, 2020 · Apt APT6
Closed — Violation closed - ANon-hazardous
Properly secure the loose wash basin at east wall in the bathroom located at apt apt6, 4th story, 1st apartment from east at south
Jan 28, 2020 · Apt APT6
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt apt6, 4th story, 1st apartment from east at south
Jan 28, 2020 · Apt APT6
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east and north walls in the 1st bathroom from north located at apt apt6, 4th story, 1st apartment from east at south
Jan 28, 2020 · Apt APT6
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt apt6, 4th story, 1st apartment from east at south
Jan 28, 2020 · Apt APT6
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective mechanical ventilation at ceiling in the kitchen located at apt apt6, 4th story, 1st apartment from east at south
Jan 28, 2020 · Apt APT6
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt apt6, 4th story, 1st apartment from east at south
Jan 28, 2020 · Apt APT6
Closed — Violation closed - BHazardous
Properly repair the broken or defective upper sash 2nd window from north at west in the 2nd room from north at west located at apt apt6, 4th story, 1st apartment from east at south
Jan 28, 2020 · Apt APT6
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors ... in the entrance located at apt apt6, 4th story, 1st apartment from east at south
Jan 28, 2020 · Apt APT6
Closed — Violation closed
DOB building violations · 25
- Construction other optional
Observed at exposure#1 ground level damage to bricks with a vertical crack approximately 8' and roll down gate caved in and broken glass.
Jul 8, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Construction other optional
Ftm bldg safe cond:exp2 parapet lean&removd&replcd per commish order# 050720feu10301ik face brck@exp2 parapet&roof bulkhead separating from back up loose brcks&deterior @exp4 wall¶pt.gap btwn wd@exp1 cornce lvl&gutter&roof.ownr retn pe evalu entre bldg&devlp compr repr plans & contr to perf reprs undr prmt.file ap 8/1/20 begn 8/15/20.compl 1/1/21
May 20, 2020
Dob violation - dismissed - Construction other optional
Emerg wrk.approx 7'l portion exp2 parapet along e10st begin at corner exp1 along 1st ave leaning out over public row.rack at roof/parapet at exp1 rear corner/intersect of lean parapet@exp1,gap btwn wood/cornice level.owner retan nys lic pe&contrc-extnd sws cover public sdwlk@exp1 brace/remove&rplc inknd lean parapt.sws 5/11,wrk 5/12 ewo 2 busn days
May 7, 2020
Dob violation - dismissed - Immediate emergency anythingoptional
Install sidewalk approximately 25 linear feet at front exposure#1 and 50 linear feet at exposure#2 (total of 75 linear feet)
Feb 21, 2020
Dob violation - dismissed
Show 15 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 19, 2020
Dob violation - dismissed - Construction other optional
Failure to maintain building walls or appurtenances. at time of inspection observed brick parapet wall at roof level of 4 story building on exposure #2 in extreme state of disrepair. parapet wall is extremely out of plumb and leaning toward public sidewalk on east 10th street. step cracking on exposure #1 also noted.
Feb 18, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 30, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 26, 2008
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Jan 13, 2008
Vw*-violation - work w/o permit dismissed - Construction other optional
Work w/out permit
Jan 13, 2008
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
ECB violations · 16
- Class - 1
Observed at exposure#1 ground level damage to bricks with a vertical crack approximately 8' and roll down gate caved in and broken glass., repair and/replace; make repairs as per code.
Jul 8, 2026 · Penalty $2,500
Active - Class - 1
Failure to comply with the commissioners order contained in summons/violation# 35474051m issued on 11/13/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. failure to file truth
May 14, 2024
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation# 35474051m issued on 11/13/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. (filed a certificate, f
Feb 9, 2024 · Penalty $6,250
Resolve - Class - 1
Unlawful acts: failure to comply with the commissioners order contained in summons/violation 3 35474051m issued on 11/13/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01, compl
Dec 14, 2023 · Penalty $6,250
Resolve - Class - 2
As per class 2ýb265¨ 28-303.7 failure to file a complete boiler inspection report as per dob records;correct violation and submit the certificate of correction
Feb 24, 2022 · Penalty $1,562
Resolve - Class - 1
Filed a certificate containing false statement. note:at time of inspection,observed permit filed for the aforementioned job #. the pw-1 associated w/ this job # states building has no tenants occupying bldg but
Nov 13, 2020 · Penalty $5,000
Resolve - Class - 1
Cease use boiler
Nov 2, 2020 · Penalty $3,125
Resolve - Class - 2
No manual reset low water cut off missing. blow down on back flow needed. holes in walls and chimney. seal chimney openings
Nov 2, 2020 · Penalty $1,562
Resolve - Class - 2
Failure to maintain building in code-compliant manner. noted:at time of inspection i observed at exposure#1 at roof level parapet is leaningoutwards also facade has missing masonry/loose,and exhaust covers and
Feb 21, 2020 · Penalty $1,563
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. noted at facade exp#1 parapet leaning out more than 1/3 also facade has missing masonry/loose exhaust covers & skylight metal cae not securely fastned risk of
Jan 3, 2020 · Penalty $6,250
Resolve
Show 6 more ↓
- Class - 1
Failure to maintain building in code compliant manner at roof exposure1/2 parapet severely leaning out more than 1/3 also facade has missingmasonry at several locations. remedy: repair/replace
Nov 23, 2019
Resolve - Class - 2
Hb smith g-300 boiler. incorrect gauge flue pipe. improper support for flue. missing air gap and discharge piping on back-flow preventer. missing lighting in boiler room. missing chimney clean out. missing chec
Nov 6, 2019 · Penalty $625
Resolve - Class - 1
Failure to maintain bldg walls or appurtenance. note at roof level of exp#1&4 parapet wall leaning out of plumb w/defective coping stones. remedy: maintain bldg exterior walls.
Oct 9, 2019
Resolve - Class - 1
Failure to maintain building walls or appurtenances at time of inspection noted corner facade of exp#1 #4 parapet leaning out of plumb by more than 1/3 and defective coping stones at roof level.rem:maintain bui
Jul 30, 2019 · Penalty $6,250
Resolve - Class - 1
Oath violation warranted for leaning parapet, uneven coping stone, defective wooden cleats in roof level at expo # 01 & 02., maintain exterior building wall; provide overhead protection, obtain structural engin
May 11, 2019 · Penalty $2,500
Active - Non-hazardous
Stop all work. ground floor store under complete renovation. all new structural work, electrical & plumbing work being done on store within any permits drop ceiling hung by wire only. no threaded (rods) or
Jan 13, 2008
Resolve
Complaints
- General
Janitor/super
Jul 7, 2026 · Apt 6
Close - Water leak
Damp spot
Jun 20, 2024 · Apt 5
Close - Heat/hot water
Entire building
Apr 18, 2024 · Apt 2
Close - Heat/hot water
Entire building
Nov 19, 2022 · Apt 7
Close - General
Janitor/super
Nov 15, 2022 · Apt 6
Close - Unsanitary condition
Garbage/recycling storage
Nov 15, 2022 · Apt 6
Close - Unsanitary condition
Mold
Nov 15, 2022 · Apt 6
Close - Water leak
Slow leak
Nov 15, 2022 · Apt 6
Close - Unsanitary condition
Garbage/recycling storage
Nov 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2022 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 4, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 21, 2022 · Apt 6
Close - Heat/hot water
Entire building
Feb 14, 2022 · Apt 6
Close - Unsanitary condition
Garbage/recycling storage
Apr 17, 2021 · Apt 6
Close - Heat/hot water
Entire building
Apr 17, 2021 · Apt 6
Close - Heat/hot water
Entire building
Mar 23, 2021 · Apt 6
Close - Heat/hot water
Apartment only
Feb 1, 2021 · Apt 6
Close - Heat/hot water
Apartment only
Feb 1, 2021 · Apt 6
Close - Plumbing
Radiator
Feb 1, 2021 · Apt 6
Close - Heat/hot water
Apartment only
Jan 30, 2021 · Apt 6
Close - Heat/hot water
Entire building
Nov 2, 2020 · Apt 6
Close - Heat/hot water
Entire building
Nov 2, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 31, 2020 · Apt BLDG
Close - General
Ventilation system
Oct 30, 2020 · Apt 6
Close - Plumbing
Radiator
Oct 30, 2020 · Apt 6
Close - Plumbing
Radiator
Oct 30, 2020 · Apt 6
Close - Door/window
Window frame
Oct 30, 2020 · Apt 6
Close - Heat/hot water
Apartment only
Oct 30, 2020 · Apt 6
Close - Flooring/stairs
Floor
Oct 30, 2020 · Apt 6
Close - Heat/hot water
Apartment only
Oct 30, 2020 · Apt 6
Close - Heat/hot water
Entire building
Oct 30, 2020 · Apt 6
Close - Heat/hot water
Entire building
Oct 30, 2020 · Apt 6
Close - Heat/hot water
Apartment only
May 8, 2020 · Apt 6
Close - Heat/hot water
Entire building
May 8, 2020 · Apt 6
Close - Heat/hot water
Entire building
Apr 30, 2020 · Apt 6
Close - Heat/hot water
Apartment only
Apr 26, 2020 · Apt 6
Close - Heat/hot water
Apartment only
Apr 26, 2020 · Apt 6
Close - Heat/hot water
Entire building
Apr 22, 2020 · Apt 6
Close - Plumbing
Basin/sink
Apr 21, 2020 · Apt 6
Close - General
Ventilation system
Apr 21, 2020 · Apt 6
Close - Door/window
Window frame
Apr 21, 2020 · Apt 6
Close - Flooring/stairs
Floor
Apr 21, 2020 · Apt 6
Close - Plumbing
Radiator
Apr 21, 2020 · Apt 6
Close - Paint/plaster
Wall
Apr 21, 2020 · Apt 6
Close - Heat/hot water
Apartment only
Apr 21, 2020 · Apt 6
Close - Heat/hot water
Apartment only
Apr 17, 2020 · Apt 6
Close - Heat/hot water
Entire building
Apr 16, 2020 · Apt 6
Close - General
Janitor/super
Apr 15, 2020 · Apt 6
Close - Heat/hot water
Entire building
Apr 15, 2020 · Apt 6
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1900
- Floors
- 4
- Residential units
- 7
- Building area
- 4,478 ft²
- Lot area
- 1,266 ft²
- Zoning
- R7A
- Community board
- 103
- Council district
- 2
- Block / lot
- 437 / 8
- Assessed value
- $1,642,050
- Landmark / historic district
- No
HPD registration #106362, last renewed Oct 30, 2025.
Questions about 162 1 Avenue
Who owns 162 1 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 246 East 10th Street LLC.
Does 162 1 Avenue have violations?
Yes. NYC HPD has recorded 345 housing violations at this property.
Is 162 1 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 162 1 Avenue built?
City records list 1900 as the year it was built.
How many apartments are in 162 1 Avenue?
It has 7 residential units and 8 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.