512 East 13 Street
Manhattan, NY 10009BBL 1-00406-0012Map
Owner of record: Bruni Family Irrevocable Living Trust
512 East 13 Street is a walk-up apartment building built in 1900 in Manhattan, 10009. It has 21 residential units across 5 floors. The owner of record is Bruni Family Irrevocable Living Trust. HPD has recorded 245 housing violations here, most recently on June 12, 2026. 17 of the 50 most recent violations are still open.
- HPD violations
- 245
- DOB violations
- 7
- ECB violations
- 7
- HPD complaints
- 245
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 245
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north located at apt 4b, 4th story, 1st apartment from west at north
Jun 12, 2026 · Apt 4B
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective brick and mortar at the north facade at second window from east , 3rd story
Jun 12, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door at bulkhead at roof
Jun 12, 2026
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts and components at all balconies at all stories at north stack at fire escape
Jun 12, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective brick and mortar at the north facade at 1st and 2nd window from east , 2nd story
Jun 12, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 5th story
Jun 12, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story
Jun 12, 2026
Closed — Violation dismissed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling fixtures at public hall, 3rd story
Jun 12, 2026
Closed — Violation dismissed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling fixtures at public hall, 2nd story
Jun 12, 2026
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story
Jun 12, 2026
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3d, 3rd story, 1st apartment from south at west
May 31, 2026 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3d, 3rd story, 1st apartment from south at west
May 31, 2026 · Apt 3D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3d, 3rd story, 1st apartment from south at west
May 31, 2026 · Apt 3D
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3d, 3rd story, 1st apartment from south at west
May 31, 2026 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balconies and all components at building front at fire escape
May 31, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3d, 3rd story, 1st apartment from south at west
May 31, 2026 · Apt 3D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from south at west
May 31, 2026 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 3d, 3rd story, 1st apartment from south at west
May 31, 2026 · Apt 3D
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of stove in front of stairs to bulkhead at public hall, 5th story
May 18, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of gas stove at public hall, 5th story
May 15, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in vestibule at public hall, 1st story
May 15, 2026
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balconies and all components at building front fire escape at fire escape
May 15, 2026
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at all stories, all balconies and all components at building front at fire escape
May 11, 2026
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balconies and all components at building front fire escape
May 4, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4d, 4th story, 1st apartment from south at west
May 4, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood sub-floor in the kitchen located at apt 4d, 4th story, 1st apartment from south at west
May 4, 2026 · Apt 4D
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in vestibule at public hall, 1st story
May 4, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly secure the loose marble tread 3rd from bottom up at public hall stairs, 4th story
May 4, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st story
May 4, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at bulkhead door, roof
Apr 21, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story
Apr 8, 2026
Closed — Violation dismissed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at public hall, 4th story
Apr 8, 2026
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycle at public hall, 1st story
Apr 8, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 1fe, 1st story, 1st apartment from north at east
Apr 8, 2026 · Apt 1FE
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective decorative metal cornice above 1st window from east at south , 4th story
Apr 8, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective upper and lower sash 1st windowfrom east at north in the 1st room from north located at apt 1fe, 1st story, 1st apartment from north at east
Apr 8, 2026 · Apt 1FE
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenette located at apt 1fe, 1st story, 1st apartment from north at east
Apr 8, 2026 · Apt 1FE
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 1st room from north located at apt 1fe, 1st story, 1st apartment from north at east
Apr 8, 2026 · Apt 1FE
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from north located at apt 1fe, 1st story, 1st apartment from north at east
Apr 8, 2026 · Apt 1FE
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor, 1st story
Apr 8, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective decorative metal cornice above 1st, 2nd, 3rd and 4th window from east at south , 4th story
Apr 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire rated door leading to basement at public hall, 1st story
Apr 8, 2026
Open — Not complied with - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at public hall, 2nd story
Apr 8, 2026
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 5th story
Apr 8, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story
Apr 8, 2026
Open — Invalid certification - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 5th story
Apr 8, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective (hinges) leading to roof
Apr 8, 2026
Open — False certification - CImmediately hazardous
Properly repair with similar material the broken or defective metal lintel above 1st window from east at south , 4th story
Nov 2, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective lintel above 1st and 4th window from east at south , 3rd story
Nov 2, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective lower window sash from east in the 1st room from east located at apt 1fe, 1st story, 1st apartment from east at south
Oct 19, 2025 · Apt 1FE
Open — Nov sent out
DOB building violations · 7
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 2, 2022
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 7
- Class - 1
Failure to maintain building wall(s) or appurtenances. at time of inspection, facade damage remains the same. window cornices at 2nd ,3rd ,4th, and 5th floor still in disrepair, parts of the window corners spal
Oct 9, 2025 · Penalty $12,530
Active - Class - 1
At front of building, above windows at 3rd, 4th and 5th floor,decorative masonry is missing and spalling,also noted at 3rd and 4th floors window exterior moulding missing and open to the elements., maintain ext
Oct 17, 2024 · Penalty $12,500
Active - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39048962r issued on 10/8/2021 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no cofc on file.remedy:
Nov 22, 2021 · Penalty $3,125
Resolve - Class - 1
At time of inspection observed emergency exit gate from apt # 1fe obstructed with metal garbage container at expo # 01. metal container welded & bolted into sidewalk concrete and not removable., remove obstruct
Oct 8, 2021 · Penalty $6,250
Active - Class - 2
Failure to maintain bldg in code-compliant manner.during physical inspi observed gas piping loc in the hallway from the 3rd flr to the 5th flr.also noted 1/2 gas piping connected on the gas range on the 5th flr
Apr 14, 2014 · Penalty $500
Active - Hazardous
Failure to maintain hazardous defect is ceiling 5th floor front apt 5a collapsed due to water leak remedy repair and make safe forthwith
Sep 20, 1989
Resolve - Hazardous
No sidewalk shed working on parapet wall and metal cornice of 5 sty building without providing protection for public remedy stop all work until sidewalk shed has been provided
Sep 20, 1989
Resolve
Complaints
- Unsanitary condition
Pests
Aug 24, 2026 · Apt 3C
Close - Unsanitary condition
Pests
Jul 24, 2026 · Apt 3C
Close - Unsanitary condition
Pests
Jul 24, 2026 · Apt 3C
Close - Water leak
Heavy flow
May 18, 2026 · Apt 3D
Close - Flooring/stairs
Floor
May 3, 2026 · Apt 4D
Close - Flooring/stairs
Floor
May 3, 2026 · Apt 4D
Close - Flooring/stairs
Floor
May 3, 2026 · Apt 4D
Close - Unsanitary condition
Mold
May 3, 2026 · Apt 4D
Close - Heat/hot water
Entire building
Apr 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 21, 2026 · Apt 1FE
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 11, 2026 · Apt 1FE
Close - Heat/hot water
Entire building
Mar 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2026 · Apt 1FE
Close - Heat/hot water
Entire building
Feb 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2026 · Apt BLDG
Close - Plumbing
Radiator
Jan 16, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt BLDG
Close - Water leak
Slow leak
Dec 1, 2025 · Apt 2C
Close - Heat/hot water
Entire building
Nov 3, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 31, 2025 · Apt 1F
Close - Heat/hot water
Entire building
Oct 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2025 · Apt 5B
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt 1FE
Close - Water leak
Slow leak
Oct 10, 2025 · Apt 2C
Close - Plumbing
Toilet
Oct 2, 2025 · Apt 2C
Close - Water leak
Slow leak
Sep 1, 2025 · Apt 2C
Close - Door/window
Window pane
Aug 7, 2025 · Apt 1FE
Close - Door/window
Window frame
Aug 7, 2025 · Apt 1FE
Close - Heat/hot water
Apartment only
Aug 7, 2025 · Apt 1FE
Close - Heat/hot water
Entire building
Dec 10, 2024 · Apt BLDG
Close - Door/window
Window frame
Oct 16, 2024 · Apt 6
Close - General
Cooking gas
Sep 13, 2024 · Apt 2C
Close - Water leak
Slow leak
May 30, 2024 · Apt 1FE
Close - Heat/hot water
Entire building
May 10, 2024 · Apt BLDG
Close - Paint/plaster
Wall
Feb 21, 2024 · Apt 1FE
Close - Water leak
Heavy flow
Feb 21, 2024 · Apt 1FE
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2023 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| May 29, 2026 | Non-market transfer | Rentals - walkup apartments | 21 |
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1900
- Floors
- 5
- Residential units
- 21
- Building area
- 9,150 ft²
- Lot area
- 2,581 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 406 / 12
- Assessed value
- $1,297,350
- Landmark / historic district
- No
HPD registration #134928, last renewed Oct 31, 2025.
Questions about 512 East 13 Street
Who owns 512 East 13 Street?
The owner of record in NYC Department of City Planning PLUTO data is Bruni Family Irrevocable Living Trust.
Does 512 East 13 Street have violations?
Yes. NYC HPD has recorded 245 housing violations at this property.
Is 512 East 13 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 512 East 13 Street built?
City records list 1900 as the year it was built.
How many apartments are in 512 East 13 Street?
It has 21 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.