183 Avenue B

Manhattan, NY 10009BBL 1-00394-0005Map

Owner of record: Tompkins 183 LLC

183 Avenue B is an elevator apartment building built in 2025 in Manhattan, 10009. It has 12 residential units across 8 floors. The owner of record is Tompkins 183 LLC. HPD has recorded 26 housing violations here, most recently on April 1, 2021.

HPD violations
26
DOB violations
19
ECB violations
28
HPD complaints
28

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Apr 1, 2021

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 26

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 25, 2019

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 5, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 6, 2017

    Closed — Violation dismissed
  • B

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods ,cable tangled on to dropladder

    Nov 22, 2015

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 1, 2015

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required

    Aug 24, 2011

    Closed — Violation closed
  • B

    Properly repair the broken or defective sash chain at the upper sash window at fire escape window in the kitchen located at apt 4r, 4th story, 2nd apartment from west at north

    Aug 5, 2007 · Apt 4R

    Closed — Violation closed
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 4r, 4th story, 2nd apartment from west at north

    Aug 5, 2007 · Apt 4R

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over the ceiling at the stairs at public hall, 4th story

    Aug 5, 2007

    Closed — Violation closed
Show 16 more ↓
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at the rear yard

    Aug 5, 2007

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 4r, 4th story, 2nd apartment from west at north

    Aug 5, 2007 · Apt 4R

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 4r, 4th story, 2nd apartment from west at north

    Aug 5, 2007 · Apt 4R

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the cabinet below the sink in the kitchen located at apt 4r, 4th story, 2nd apartment from west at north

    Aug 5, 2007 · Apt 4R

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over the ceiling in the kitchen located at apt 4r, 4th story, 2nd apartment from west at north

    Aug 5, 2007 · Apt 4R

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 4r, 4th story, 2nd apartment from west at north

    Aug 5, 2007 · Apt 4R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceiling, walls with fire retarding materials at public hall, 4th story

    Aug 5, 2007

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of wood book case and ladders at public hall, 4th story

    Aug 5, 2007

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of exposed electrical wires at the ceiling at public hall, 1st story

    Aug 5, 2007

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of house-hold items at public hall, 1st story

    Aug 5, 2007

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 3r, 3rd story, 2nd apartment from west at north

    Feb 7, 2006 · Apt 3R

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building rear yard

    Feb 7, 2006

    Closed — Violation closed
  • A

    Cleanse to the satisfaction of this department the floor ., all sty at public hall

    Jul 20, 2005

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper., 1st story

    Jul 20, 2005

    Closed — Violation closed
  • A

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the wood furniture and construction materials at rear yard

    Jul 15, 2005

    Closed — Violation closed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts required

    Dec 27, 2002

    Closed — Violation closed

DOB building violations · 19

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
Show 9 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Mar 27, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    .failure to amintain in code complaint manner. vertical cracks by nort hwindows & by fire escape

    Mar 25, 2014

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Mar 25, 2014

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Oct 10, 2013

    Dob violation - dismissed

ECB violations · 28

  • Class - 2

    Observed active jobsite w/ multiple fire extinguisher w/ dislodged gauge, gauge w/ low pressure, missing in required locations, no monthly inspections, extinguishers not mounted as required by bc and fire code.

    Sep 23, 2025 · Penalty $655

    Resolve
  • Class - 2

    Observed active jobsite w/ makeshift connections on pipe scaffold system @ expo #1. osha planks used to construct guardrails at top bay & wire tied connection in other areas. drawings call for horizontal guardr

    Sep 23, 2025 · Penalty $1,280

    Active
  • Class - 2

    Observed active jobsite w/ missing sections of construction fence at expo #3 and #4 allowing access from 181 ave b rear yard & 603 e 11 st public space. condition allows unauthorized access to hazardous constru

    Sep 23, 2025 · Penalty $1,000

    Resolve
  • Class - 1

    Observed active jobsite w/ multiple temporary const. equipment in place. upon request for daily inspection checklist for sidewalk shed, pipe scaffold non-provided. also observed hazardous temp. platform in plac

    Sep 23, 2025 · Penalty $2,500

    Active
  • Class - 1

    Observed active jobsite w/ no guardrails installed at 7th floor terrace expo #1, multiple balconies expo #3 & #1, hazardous platform area 2nd flr, 3ft x 3ft opening next to elevator shaft 1st flr, elevator shaf

    Sep 23, 2025 · Penalty $5,000

    Resolve
  • Class - 1

    Observed active jobsite w/ excessive accumulation of construction debris on multiple floors. also noted excessive amounts of debris bags blocking egress from the 6th flr. stop all accumulation of construction d

    Sep 23, 2025 · Penalty $2,500

    Resolve
  • Class - 1

    Observed active jobsite w/ out handrails in multiple stair location. permanent egress stair has been completed w/ out permanent or temp handrails in place. w/out handrails in place this creates a severe fall ha

    Sep 23, 2025 · Penalty $2,530

    Resolve
  • Class - 2

    At time of inspection, observed construction fence operating under expired permit m00394752-i1-fn (expired 04/30/2025); no new permit on file. contrary to bc 105.8.2 (2014) and bc 106.8.2 (2022). unpermitted fe

    Aug 9, 2025

    Resolve
  • Class - 2

    3308.5 vertical safety netting systems. vertical safety netting shall be installed, maintained, and provided along all unenclosed perimeters. observed vertical netting not properly secured at upper floors on ex

    Jan 20, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    At time of inspection of a proposed 8 storeys new building under construction i observed sidewalk closed for construction fence and yodock barriers on the roadway upon review the dot permit to verify complianc

    Apr 10, 2024

    Resolve
Show 18 more ↓
  • Class - 2

    Bc3301.1.3 manufacturer specifications:yodocks.at time of inspection of 8 story nb observed temporary pedestrian walk way at roadway with yodock barrier not as per manufacturer specification not locked in place

    Sep 16, 2021 · Penalty $625

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specification:requirements for temporary walkways.at time of inspection at 8 story nb observed pedetrian walkway at exp #1 not maintained as per code missing temporary r

    Sep 16, 2021 · Penalty $2,400

    Resolve
  • Class - 1

    Bc3301.2 failure to maintain safety equipment measures temporary construction:pedestrian walkway ramp.at time of inspection observed ramp at pedestrian walkway not as per code & poorly maintained no beveled edg

    Sep 16, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to comply with manufacturer specifications at time of my inspection of a proposed 8 story building closed dobsite i noticed a yodockbarrier system on street due to closed sidewalk used as a pedestrian p

    Mar 31, 2021

    Resolve
  • Class - 1

    Bc 3307.2.1 obstruction of streets or sidewalks note:at time of my inspection of proposed 8 story new building active jobsite.i observed a construction fence built on the pedestrian walkway and also observed de

    Mar 16, 2021 · Penalty $625

    Resolve
  • Class - 1

    Permit holder failed to ensure workers recieve site safety orientationor refresher note:at time of my inspection of proposed 8 story new building active jobsite with 6 workers performing jobs onsite backyard ar

    Mar 16, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Bc330910-no roof or adequate roof protectoin of adjacent properties.attime of demolition monitoring inspection of 4 story building it was observed that no roof protection was installed as per code on roof exp#2

    Jan 17, 2020 · Penalty $2,500

    Resolve
  • Class - 3

    Rcny-3301-03 failure to provide required worker safety information sign as per rcny-3301-03(a) noted: workers on site working under application #123671081 w/o required worker safety information sign posted

    Jan 17, 2020 · Penalty $250

    Resolve
  • Class - 2

    Bc 3301.12.3 failure to maintain record of preshift safety netting foreach worker @time inspection on active jobsite of 4 story demolition monitoring inspection i asked competent person if i could see record of

    Jan 17, 2020 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply with dot regulations.at time of demolition-monitoring inspection,observed container on the street exp#1 not enclosed by approved dot barriers(40docus)as on plan.failure to install barriers cre

    Jan 17, 2020 · Penalty $625

    Resolve
  • Class - 1

    Bc-3314.9.2 supported pipe scaffold(base plat/mud sil) @time of inspection on active jobsite 4 sty demo-monitoring inspect, i observed @3floor supported pipe scaffold being use for demolition operations,

    Jan 17, 2020 · Penalty $625

    Resolve
  • Class - 2

    Bc 3301.9.1 project information panel @time of inspection on a active jobsite, observed that information panel was not eligible.rem: provide & maintain adequate project panel.

    Jan 17, 2020 · Penalty $625

    Resolve
  • Class - 2

    View panels-fence(missing) @time of inspection observed a jobsite fence had no view prots installed in fence.rem: comply with code.

    Jan 17, 2020 · Penalty $500

    Resolve
  • Class - 1

    Bc3301131-failure to provide site safety plan as per lock law 81 of 2017.at time of demolition monitoring inspection i need the competent person william t. hanft for site safety plan his responce was that they

    Jan 17, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction:no guardrails.at time of my inspeciton of demo monitoring 4 story bldg,observed no guard rails installed throuout jobsite.no con

    Jan 17, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    Work does not to approved const documents-sidewalk shed drawing.observed sidewalk shed erected in front of 183 ave b contrary to approved sidewalk shed design drawing.sidewalk shed erected due to const site nex

    Aug 13, 2014

    Resolve
  • Non-hazardous

    Failure to obtain permit for sidewalk shed noted sidewalk shed erected at front of bldg approx 20 long it permitavilable remedy obtain a permit sidewalk shed does not neet bldg code spacification noted shed

    Jun 4, 1999 · Penalty $2,200

    Resolve
  • Non-hazardous

    Failure t oprovide approved plans at time of inspection noted no approved plans availbe for alt 101938441 remedy stop all work make area safe provide approved plans

    Jun 4, 1999 · Penalty $130

    Resolve

Complaints

  • Paint/plaster

    Wall

    Jul 28, 2007 · Apt 4R

    Close
  • Nonconst

    Rubbish

    Jul 28, 2007 · Apt 4R

    Close
  • Plumbing

    Water-leaks

    Jul 28, 2007 · Apt 4R

    Close
  • Nonconst

    Vermin

    Jul 28, 2007 · Apt 4R

    Close
  • General

    Windows

    Jul 28, 2007 · Apt 4R

    Close
  • Nonconst

    Rubbish

    Jul 28, 2007 · Apt 4R

    Close
  • Plumbing

    Water-leaks

    Jul 28, 2007 · Apt 4R

    Close
  • General

    Windows

    Jul 28, 2007 · Apt 4R

    Close
  • Paint/plaster

    Wall

    Jul 28, 2007 · Apt 4R

    Close
  • Nonconst

    Vermin

    Jul 28, 2007 · Apt 4R

    Close
Show 18 more ↓
  • Plumbing

    Water-leaks

    Jul 26, 2007 · Apt 4R

    Close
  • General

    Windows

    Jul 26, 2007 · Apt 4R

    Close
  • Paint/plaster

    Wall

    Jul 26, 2007 · Apt 4R

    Close
  • Heating

    Heat related

    Oct 25, 2006 · Apt BLDG

    Close
  • Nonconst

    Janitor/super

    Oct 25, 2006 · Apt 3R

    Close
  • Heating

    Heat related

    Oct 25, 2006 · Apt 3R

    Close
  • Heating

    Heat related

    Oct 24, 2006 · Apt BLDG

    Close
  • Heating

    Heat related

    Oct 23, 2006 · Apt 3R

    Close
  • Paint/plaster

    Ceiling

    Jan 26, 2006 · Apt 3R

    Close
  • General

    Doors

    Jan 26, 2006 · Apt 3R

    Close
  • General

    Doors

    Jan 26, 2006 · Apt 3R

    Close
  • General

    Doors

    Dec 5, 2005 · Apt BLDG

    Close
  • Nonconst

    Janitor/super

    Dec 5, 2005 · Apt BLDG

    Close
  • Nonconst

    Rubbish

    Dec 5, 2005 · Apt BLDG

    Close
  • Nonconst

    Janitor/super

    Jun 3, 2005 · Apt ANON

    Close
  • Nonconst

    Rubbish

    Jun 3, 2005 · Apt ANON

    Close
  • Nonconst

    Janitor/super

    May 15, 2005 · Apt NA

    Close
  • Nonconst

    Rubbish

    May 15, 2005 · Apt NA

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2025
Floors
8
Residential units
12
Building area
10,509 ft²
Lot area
1,779 ft²
Zoning
R7A
Community board
103
Council district
2
Block / lot
394 / 5
Assessed value
$429,750
Landmark / historic district
No

HPD registration #122831, last renewed Nov 20, 2020.

Questions about 183 Avenue B

Who owns 183 Avenue B?

The owner of record in NYC Department of City Planning PLUTO data is Tompkins 183 LLC.

Does 183 Avenue B have violations?

Yes. NYC HPD has recorded 26 housing violations at this property.

Is 183 Avenue B rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 183 Avenue B built?

City records list 2025 as the year it was built.

How many apartments are in 183 Avenue B?

It has 12 residential units and 13 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.