153 Avenue C
Manhattan, NY 10009BBL 1-00392-0034Map
Owner of record: 153 Avenue C Property Owner LLC
153 Avenue C is a walk-up apartment building built in 1951 in Manhattan, 10009. It has 8 residential units across 5 floors. The owner of record is 153 Avenue C Property Owner LLC. HPD has recorded 11 housing violations here, most recently on May 22, 2026. 1 of the 11 most recent violations are still open.
- HPD violations
- 11
- DOB violations
- 8
- ECB violations
- 2
- HPD complaints
- 38
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 11
- CImmediately hazardous
Properly repair or replace the broken or defective ...lock at building front entrance door , 1st story
May 22, 2026
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing ...kikc stand install at building front entrance door , 1st story
May 22, 2026
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing ...kikc stand install at vestibule door , 1st story
May 22, 2026
Closed — Violation closed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at front
Oct 31, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story
Feb 6, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Feb 6, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Feb 6, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 6, 2019
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 200 watts minimum required (light fixtures present)
Apr 26, 2014
Closed — Violation dismissed
Show 1 more ↓
- BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 4fs, 4th story, 1st apartment from east at south
Jun 20, 2013 · Apt 4FS
Closed — Violation dismissed
DOB building violations · 8
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Electric signs none
Es-electric signs none
Apr 5, 1990
Dob violation - dismissed
ECB violations · 2
- Class - 1
Plumbing work w/o permit.noted:installed approx 60' of new waste pipe (black) into existing pipe & was done in cellar.dob records indicate no permit has been issued.obtain permit.
Sep 15, 2010 · Penalty $1,600
Resolve - Hazardous
Failure to maintain:(hazardous)defect is wood floor at 1st floor laundromat is sagging approximately 8'inches throughout due to rotted wood beams. heavy washing machines creating problem. remedy:make all necess
Jul 19, 1991
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Aug 16, 2026 · Apt BLDG
Close - Door/window
Door
May 15, 2026 · Apt 5FS
Close - Plumbing
Water supply
Apr 29, 2026 · Apt 4C
Close - Heat/hot water
Entire building
Apr 29, 2026 · Apt 4C
Close - General
Signage missing
Apr 29, 2026 · Apt 4C
Close - Unsanitary condition
Pests
Oct 8, 2025 · Apt 2RN
Close - Safety
Fire escape
Sep 7, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Nov 29, 2022 · Apt 3RN
Close - Unsanitary condition
Mold
Nov 1, 2022 · Apt 3RN
Close - Water leak
Slow leak
Nov 1, 2022 · Apt 3RN
Close
Show 28 more ↓
- General
Janitor/super
Nov 1, 2022 · Apt 3RN
Close - Unsanitary condition
Mold
Oct 17, 2022 · Apt 3RN
Close - Unsanitary condition
Mold
Oct 17, 2022 · Apt 5RN
Close - Paint/plaster
Wall
Oct 5, 2022 · Apt 3RN
Close - Water leak
Slow leak
Oct 4, 2022 · Apt 4RN
Close - Water leak
Heavy flow
Oct 4, 2022 · Apt 4RN
Close - Water leak
Heavy flow
Oct 4, 2022 · Apt 3RN
Close - Heat/hot water
Apartment only
Feb 1, 2019 · Apt 2FN
Close - Heat/hot water
Apartment only
Feb 1, 2019 · Apt 2FN
Close - Plumbing
Water supply
Oct 9, 2018 · Apt 3F
Close - Paint/plaster
Ceiling
Dec 16, 2014 · Apt 5RS
Close - Water leak
Heavy flow
Dec 16, 2014 · Apt 5RS
Close - Paint/plaster
Ceiling
Dec 16, 2014 · Apt 5RS
Close - Nonconst
Rubbish
Sep 26, 2013 · Apt 3RN
Close - Nonconst
Vermin
Sep 26, 2013 · Apt 3RN
Close - Nonconst
Rubbish
Aug 17, 2013 · Apt 3RN
Close - Nonconst
Vermin
Aug 17, 2013 · Apt 3RN
Close - Nonconst
Vermin
Aug 17, 2013 · Apt 3RN
Close - General
Locks
Jun 19, 2013 · Apt 4FS
Close - Heating
Heat related
Dec 11, 2011 · Apt 5RS
Close - Heating
Heat related
Dec 11, 2011 · Apt 5RS
Close - Plumbing
Water-leaks
Sep 1, 2011 · Apt 5RS
Close - Heating
Heat related
Oct 19, 2009 · Apt BLDG
Close - Nonconst
Vermin
May 28, 2008 · Apt 4FS
Close - Nonconst
Vermin
May 28, 2008 · Apt 4FS
Close - Nonconst
Vermin
Aug 31, 2006 · Apt 3FF
Close - Heating
Heat related
Oct 23, 2003 · Apt 2RE
Close - Heating
Heat related
Oct 4, 2003 · Apt 2RE
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| May 14, 2026 | $6,850,000 | Rentals - walkup apartments | 9 |
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1951
- Floors
- 5
- Residential units
- 8
- Building area
- 6,245 ft²
- Lot area
- 1,909 ft²
- Zoning
- R7A
- Community board
- 103
- Council district
- 2
- Block / lot
- 392 / 34
- Assessed value
- $2,723,850
- Landmark / historic district
- No
HPD registration #135062, last renewed Jun 30, 2026.
Questions about 153 Avenue C
Who owns 153 Avenue C?
The owner of record in NYC Department of City Planning PLUTO data is 153 Avenue C Property Owner LLC.
Does 153 Avenue C have violations?
Yes. NYC HPD has recorded 11 housing violations at this property.
Is 153 Avenue C rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 153 Avenue C built?
City records list 1951 as the year it was built.
How many apartments are in 153 Avenue C?
It has 8 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.