Owner of record: NYC Department Of Homeless Services

282 East 3 Street is a care facility built in 1975 in Manhattan, 10009. The owner of record is NYC Department Of Homeless Services. HPD has recorded 2 housing violations here, most recently on December 18, 2018.

HPD violations
2
DOB violations
41
ECB violations
49
HPD complaints
4

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Dec 18, 2018

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 2

  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Dec 18, 2018

    Closed — Violation closed
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 410, 4th story, apartment at south

    Feb 14, 2016 · Apt 410

    Closed — Violation closed

DOB building violations · 41

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 25, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 21, 2020

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 8, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 25, 2012

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Feb 27, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 5, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 5, 2007

    Dob violation - resolved
Show 31 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 28, 2004

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 21, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p30932

    Jun 20, 2000

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    May 31, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Jun 28, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 22, 1992

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatoroptional

    1

    Jun 29, 1990

    Dob violation - dismissed
  • Elevator elevatorrequired

    (51) properly tag governor (52) properly wire controller (53) secure all items on the controller

    Feb 15, 1989

    Dob violation - resolved

ECB violations · 49

  • Class - 2

    Found weil mclain(model# 588) dual fuel boiler not registered, correct violating condition submit certificate of correction

    Dec 23, 2025 · Penalty $1,250

    Active
  • Class - 2

    Found weil mclain(model# 588 dual fuel boiler not registered correct violating condition submit certificate of correction

    Dec 23, 2025 · Penalty $1,250

    Active
  • Class - 2

    Observed obstructed sprinkler heads throughout the building, missing insulation on bathroom traps, lack of firestopping around sprinkler line on the 6th floor stairwell a , and a leaking sink waste line on fist

    Dec 23, 2025 · Penalty $1,250

    Active
  • Class - 2

    Found a o smith (model#hw 670) gas fired boiler not registered correct violating condition submit certificate of correction

    Dec 23, 2025 · Penalty $1,250

    Active
  • Class - 2

    Observed in basement damaged sprinkler head; the door opens into sprinkler line, and the drain line is in the dedicated electrical room which contrary to code section bc 101.4.5, repair and/or replace

    Dec 23, 2025 · Penalty $1,250

    Active
  • Class - 3

    Observed on the 6th floor ac room leak on the cap of the water line, also on the roof level staircase standpipe not painted. as per 102.3 of the plumbing code, repair and or replace

    Apr 4, 2024 · Penalty $500

    Resolve
  • Class - 1

    Only elevator in the building out of service. restored to service immediately and contact nycdob. at [email protected] for a complete inspection.

    Mar 27, 2024 · Penalty $3,125

    Resolve
  • Class - 1

    Class 1: upon inspection found device to be out of service. this presents a hazzardous condition to residents & staff. this is a recurring condition. restore to service repair immiedately as per 1rcny 11-02. wh

    Nov 15, 2023 · Penalty $3,125

    Resolve
  • Class - 1

    R t s . elevator in building out of service , upon inspection , device is found to be out of service, restore to service immediately

    Sep 8, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    97x17 the only elevator in building out of service.upon inspection thedevice is found to due out of service creating a hazardous condition as per 1rcny 11-02.remedy restore to serice immediately and notify nycd

    May 26, 2023 · Penalty $1,250

    Resolve
Show 39 more ↓
  • Class - 1

    Elevator out of service. repair and call the dob elevator division for a proper inspection. 97-x-17

    Jan 26, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    As per one natural gas burning, ao smith domestic hot water boiler. model no. hw-670 200, serial no. 1937m000013; boiler not registered as per dob records.

    Dec 9, 2022 · Penalty $625

    Active
  • Class - 2

    As per one, natural gas burning, weil mclain, hot water boiler, model 588 series 1, boiler no. 100473-02; boiler not registered as per dob records; register boiler and call for an inspection.

    Dec 9, 2022 · Penalty $625

    Active
  • Class - 2

    As per one natural gas burning, hot water boiler model 588 series 1, boiler no. 100473-01. boiler not registered as per dob records; register boiler and call for an inspection.

    Dec 9, 2022 · Penalty $625

    Active
  • Class - 2

    Observed: at second floor, terrace, concrete tiles are split /cracked and deteriorated., repair and/or replace

    Dec 5, 2022 · Penalty $625

    Active
  • Class - 2

    Observed: from first floor to 6th floor, mechanical room, gas meter/generator rms, exposed steel structure (columns, girders, trusses, beams,) is requirements for structural members and assemblies to be fire pr

    Dec 5, 2022 · Penalty $1,250

    Active
  • Class - 2

    Noted: observed pipes and electrical conduits penetrating through each floor and ceiling within all ac rooms with no fire stopping provided., provide/maintain fire stopping

    Nov 23, 2021 · Penalty $3,125

    Active
  • Class - 1

    Counterweight roller broken off right side (cu). emergency stop switch works but no buzzer. alarm bell no buzzer. car gate roller damage replace. sprinkler system in the machine room .

    Sep 30, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Sections on middle left side of boiler are corroded. correct violating condition and submit a certificate of correction.

    Sep 15, 2021 · Penalty $625

    Resolve
  • Class - 2

    Ao smith boiler missing combustion air fan proving switch. correct violating conditions and submit certificate of correction

    Feb 12, 2020 · Penalty $625

    Resolve
  • Class - 2

    Weil mclain 588 boiler #2 missing combustion air fan proving switch. correct violating conditions and submit certificate of correction

    Feb 12, 2020 · Penalty $625

    Resolve
  • Class - 2

    Weil mclain 588 boiler #1 missing proving switch for combustion air fan. correct violating conditions and submit certificate of correction

    Feb 12, 2020 · Penalty $625

    Resolve
  • Class - 1

    28-104.8.4 inadequate tenant protection plan. noted:at time of inspection reading the tpp section 3:does not say the methods to be used for dust control and in section 6:does not say the hours and day they will

    Dec 16, 2019 · Penalty $6,250

    Resolve
  • Class - 2

    70o02,29m07,40b07,40p16. 70o02-pit area diryt; 29m07-door operator cover missing and wires are exposed; 40b07 ladder to roof leading to machine room need to provide additional ladder rungsto properly step o

    May 8, 2019

    Resolve
  • Class - 1

    Cease use(05l10) 26b07, 35m07, 71x10, 71b10, 80b10, 70o02, 39m07. ceaseue use item=05-l=repair door restrictor & contact nyc dob for restoreto service re-insp*26-b provide manual reset switch *35-m=provide b0x

    Apr 11, 2019

    Resolve
  • Class - 2

    39q03,58b10,42b10,70o02,80m07,64m07. 39q-provide and install; 58b-repair; 42b-provide readable fuses. 70o-clean hoistway pit; 80m-provide and install. 64m-provide and install in car

    Feb 26, 2019

    Resolve
  • Class - 1

    Cu32h11,59b7,cu59h10. 32h11-replaced counterweight guide face roller worn; 59b7-brake maintenance tag insufficient missing date test was peformed; 59h10-brake shoes worn. must have weights for reinspection ful

    Feb 7, 2019

    Resolve
  • Class - 2

    Failure to maintain building wall(s) or appurtenances. noted: at roof 2nd level bulkhead exterior wall has loose cracked and shifting bricksalso at roof, bricks loose and shifting at chimney at exposure #1 at

    Sep 26, 2018

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. observed on 9/26/18 at above address fernco coupling and jim caps installed in basement. remedy: repair and or replace

    Sep 26, 2018

    Resolve
  • Class - 2

    50. spill switch missing. current all violating conditions & submit c of c.

    Jul 3, 2018

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. no fire stopping per bc 712.3 27-345. noted: at cellar level section of wall missing above door and holes in ceiling and walls. that were not fire stopped

    May 18, 2018

    Active
  • Class - 2

    Failure to maintain building walls or appurtenances. noted: crack in chimney and cracks in bulkhead ext wall where machine room is. rmdy: maintain exterior building wall.

    May 18, 2018

    Resolve
  • Class - 3

    Failure to maintain building code compliant manner. i observed in boiler room in cellar os and y valve on the back of the boiler leakingand the fire pump also leaking. photos taken. rmdy: repair and/or repl

    Apr 27, 2018

    Resolve
  • Class - 2

    Failure to maintain building code compliant manner. i observed in cellar gas meter and gas piping installed in the same room as the firepump which is contrary to the requirements of the nfpa as adopted by

    Apr 27, 2018

    Active
  • Class - 2

    Failure to maintain building wall(s) or appurtenances.noted:at bulkhead exterior wall crack above bulkheaddddddddd exit door to roof.also atbulkhead above bulkhead esit door, coping stone at bulkhead room loose

    Aug 31, 2017

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner.observed on 08/308/31/17 at above adsdress fernco couplings installed on cast iron pipes waste in water meter room.remedy:repair and or replace

    Aug 31, 2017

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner.not fire stopping per bc 712.3;27-345.noted: at cellar in fire pump room and in electrical panel room sheet rock missing and openings around plumbing elimin

    Aug 31, 2017

    Resolve
  • Class - 1

    404.1 gas piping prohibited location-fire pump room.observed on 8/31/17 at above address gas meter is located in teh fire pump room. remedy:comply with summons.

    Aug 31, 2017

    Active
  • Class - 1

    Gas piping in a prohibited location-fire pump room observed on 3/21/17gas piping installed in fire pump room. rmdy: comply with summons. photos taken.

    Mar 21, 2017

    Active
  • Class - 2

    Failure to maintain building in code compliant manner. installation/maintenance of plumbing materials/equipment per pc102.3p;27-902. observed on 3/21/17 fernco couplings installed throughout basement.rmdy:remov

    Mar 21, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner: no fire stopping per bc712.3; 27-345. noted: missing fire stopping at riser pipe penetration throughout entire floors (1st thru 6th floors)rmdy:seal penetrat

    Sep 27, 2016

    Resolve
  • Class - 2

    Failure to maintain bldg wall(s) or appurtenances. defects noted:bulk head on roof has loose bricks/mortar joints, cracks and loose copings.rmdy: comply with nov.

    Sep 27, 2016

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner:failure to comply with law for drainage system per pc 702.1; 27-911.at the time of my inspection, 1:25pm on 9/27/2016 at the above place of occurrence addre

    Sep 27, 2016

    Resolve
  • Class - 2

    Failure to maintain building wall(s) or appurtenances (exterior). defects noted: bulkhead on roof has loose bricks mortar joints and loose copings. rmdy: repair and/or replace noted defects.

    Feb 2, 2016

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner:provide requiredcorridor w/per bc 1016.2; 27-369 (partial obstruction) noted: at base ment stair "c" apprx 50% obstruction w/clothings,boxes and plastic con

    Feb 2, 2016

    Resolve
  • Non-hazardous

    19b-a.o. smith hotwater boiles used for donestic hot water has asme "h" stamp and is subiject to n.y.c boiler code. need aquastat with resetbuttom.

    Aug 8, 2001 · Penalty $180

    Resolve
  • Non-hazardous

    02x11 14i12 09i12 74h12 16h12 30z11 31q03 36t07 36d06 50t07 54t07 34t07 52m07 74-h12,car saddle, 16h-12, lobby gibs, 4fl gibs 30-z11, from roof 31-q03, top of car splice box. 37-50, 54-t-07 city id#s 57-m

    May 22, 2001 · Penalty $350

    Resolve
  • Non-hazardous

    75u 22d

    Feb 9, 1999 · Penalty $350

    Resolve
  • Hazardous

    56x,55x,73m,22d,74aq,11q,74bx,74cx.56-repair oit swicth 55-rpair pit light,73-id equipment 22-properly secire emergency exit 74a-provide guard for frw 11-provide fuard for car light 74b-repair top of car sw 74c

    Jan 29, 1997 · Penalty $1,000

    Resolve

Complaints

  • Heating

    Heat related

    Mar 17, 2007 · Apt A14

    Close
  • Heating

    Heat related

    Mar 17, 2007 · Apt 3FL

    Close
  • Nonconst

    Vermin

    Oct 29, 2006 · Apt BLDG

    Close
  • Nonconst

    Vermin

    Mar 21, 2005 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Care facility (N2)
Year built
1975
Floors
6
Residential units
—
Building area
23,530 ft²
Lot area
4,424 ft²
Zoning
R8B
Community board
103
Council district
2
Block / lot
372 / 14
Assessed value
$1,386,450
Landmark / historic district
No

Questions about 282 East 3 Street

Who owns 282 East 3 Street?

The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Homeless Services.

Does 282 East 3 Street have violations?

Yes. NYC HPD has recorded 2 housing violations at this property.

Is 282 East 3 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 282 East 3 Street built?

City records list 1975 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.