154 Stanton Street
Manhattan, NY 10002BBL 1-00350-0037Map
Owner of record: Y&K 155 LLC
154 Stanton Street is a store building built in 1920 in Manhattan, 10002. It has 1 residential unit across 2 floors. The owner of record is Y&K 155 LLC. HPD has recorded 16 housing violations here, most recently on February 8, 2020. 16 of the 16 most recent violations are still open.
- HPD violations
- 16
- DOB violations
- 11
- ECB violations
- 19
- HPD complaints
- 12
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 16
- BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective counter balances at lower sash 2nd window from east in the 5th room from north at west located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall in the 5th room from north at east located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at electrical outlet at east wall in the 5th room from north at east located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Properly secure the loose electrical outlet at east wall in the 5th room from north at east located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in closet at east in the 1st room from north at east located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north at east located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at east wall in closet in the 1st room from north at east located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Properly repair the broken or defective counter balances at lower sash at window in the bathroom located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Properly repair the broken or defective counter balances at lower sash at window at west wall in the 1st room from north at east located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out
Show 6 more ↓
- ANon-hazardous
Refit upper and lower sash at window at west wall in the 4th room from north at west located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture in the 4th room from north at west located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Properly repair the broken or defective counter balances at lower sash at 1st window from east in the 5th room from north at center located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlet at center of floor in the 1st room from north at east located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture in the bathroom located at apt unit2, 2nd story, 1st apartment from west at north
Feb 8, 2020 · Apt UNIT2
Open — Nov sent out
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Boiler boiler optional
32 dirty boiler room/remove all old blr sections
Nov 21, 1989
Dob violation - dismissed
Show 1 more ↓
- Boiler boiler optional
B-boiler boiler optional
Dec 14, 1988
Dob violation - dismissed
ECB violations · 19
- Class - 2
General contractor failed to file certificate of correction with the dob. no corrective measures on record for violation# 039555236z, issued on 6.08.2026. ..
Aug 6, 2026 · Penalty $1,280
Active - Class - 1
At the time of my inspection observed site without any immediate ingress/egress access for active workers, emt respondents, & inspectors 3303.9 site must provide these safety factors on all active demo/construc
Jun 8, 2026 · Penalty $5,000
Resolve - Class - 1
At the time of my inspection observed site without any guardrail system installed throughout active site during demo/construction operations. site under permit # m00978747-i1 failed to address immediate need fo
Jun 8, 2026 · Penalty $5,000
Resolve - Class - 2
At the time of my inspection observed cs wasn't present but competent was but the site conditions 3301.13.7 cs failed to address, open ledges without installing guardrail system,no egress/ingress access,active
Jun 8, 2026 · Penalty $5,000
Active - Class - 1
At the time of my inspection observed active site failed to address housekeeping duties with overloaded debris obstructing pathways for active workers, emt respondents, & inspectors. bc 3303.4 & 27-1018 site mu
Jun 8, 2026 · Penalty $2,500
Resolve - Class - 1
At the time of inspection observed site without demo notification under permit # m00978747 bc 3306.3& 27-195 .site failed to address nor provide demolition notification for actively commencing ongoing demo oper
Jun 8, 2026 · Penalty $2,500
Active - Class - 2
At time of inspection, observed sidewalk shed lighting not illuminated at exposures 1 and 2 of inactive 4-story building located at 154 stanton street and 162-164 suffolk street, contrary to bc 3307.6.4.7. cond
May 12, 2026 · Penalty $2,400
Resolve - Class - 2
At time of inspection i observed sidewalk shed installed on exposure #1 and 2 with inoperable light bulbs at underside the shed to bring illumination failure to provide lighting creates unsafe and mugging condi
Mar 27, 2026 · Penalty $2,400
Resolve - Class - 2
During my inspection of a closed proposed 4-story alt. i observed the jobsite fence in place, not maintained, heavily plastered with posters and graffiti. not as per bc 3307.7.8
Feb 9, 2026 · Penalty $1,000
Resolve - Class - 2
Closed site 4story alteration. upon research observed sws built contrary to plans as per dobrecords. conditions onsite are not as per pages eq-001 & eq-002 of approved sws drawings. a section of the sws @expo1
Jan 21, 2026
Resolve
Show 9 more ↓
- Class - 2
Enlargement from existing 2 story plus + cellar to 4 story plus cellar residential building . observed site closed , on fence exposure 1,2 noted non construction related signage and graffiti . contrary to bc 3
Sep 11, 2025 · Penalty $2,500
Resolve - Class - 1
Atoi no active construction is in progress. fence erected in the property is contrary to the approved plans submitted to the department. construction rolling gate is in a wrong location., conform work to approv
Jul 22, 2025 · Penalty $2,500
Resolve - Class - 2
Work w/o a permit. noted: at roof level,found wood deck approx 25ft x 45ft installed w/o a permit. remedy: obtain a permit.
Mar 25, 2015 · Penalty $400
Resolve - Class - 2
Occupancy contrary to c of o. noted: at roof level. found installationof wood deck approx 25ft x 45ft & gazebo 12ft x 12ft & space is being occupied for social gathering,contrary to c/o 28659,which indicates no
Mar 25, 2015 · Penalty $600
Resolve - Class - 2
Sec. 1001.3 failure to maintain egress clear & unobstructed. noted: atfront exposure,roll-up gate is obstructing extension of fire escape drop ladder & obstructing egress. remedy: comply w/notice of violation.
Mar 25, 2015
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #35153118k issued on 10/9/14. for work w/o a permit. erected partitions & installed plumbing lines at 2nd fl level. remedy: comply
Dec 5, 2014
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35153117z issued on 10/9/14 pursuant to 28-204.4 & 1rcny 102-01. for occupancy contrary to that
Dec 5, 2014
Resolve - Class - 1
Occupancy contrary to that allowed by cofo or dob records.cert of occupancy #28659 indicates premises 1st story two stores.@ 2nd story:showroom.illegal occupancy noted:@ 2nd fl created a class "a"apt w/full bat
Oct 9, 2014
Resolve - Class - 1
Work w/o a permit. work noted: at 2nd fl installed water & waste linesfor a bathtub at bathroom & residential sink at kitchen. installed gasline for gas stove at kitchen. at roof installed wooden deck approx 25
Oct 9, 2014
Resolve
Complaints
- Unsanitary condition
Pests
Feb 5, 2020 · Apt UNIT2
Close - Door/window
Window frame
Feb 5, 2020 · Apt UNIT2
Close - Electric
Outlet/switch
Feb 5, 2020 · Apt UNIT2
Close - Water leak
Heavy flow
Feb 5, 2020 · Apt UNIT2
Close - Heat/hot water
Apartment only
Jan 17, 2020 · Apt 42
Close - Electric
Wiring
Jan 17, 2020 · Apt 42
Close - Paint/plaster
Ceiling
Jan 17, 2020 · Apt 42
Close - Safety
Carbon monoxide detector
Jan 17, 2020 · Apt 42
Close - Water leak
Damp spot
Jan 17, 2020 · Apt 42
Close - Door/window
Window frame
Jan 17, 2020 · Apt 42
Close
Show 2 more ↓
- Unsanitary condition
Pests
Jan 17, 2020 · Apt 42
Close - Electric
Outlet/switch
Jan 17, 2020 · Apt 42
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1920
- Floors
- 2
- Residential units
- 1
- Building area
- 3,600 ft²
- Lot area
- 1,675 ft²
- Zoning
- R7A
- Community board
- 103
- Council district
- 2
- Block / lot
- 350 / 37
- Assessed value
- $436,050
- Landmark / historic district
- No
Questions about 154 Stanton Street
Who owns 154 Stanton Street?
The owner of record in NYC Department of City Planning PLUTO data is Y&K 155 LLC.
Does 154 Stanton Street have violations?
Yes. NYC HPD has recorded 16 housing violations at this property.
Is 154 Stanton Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 154 Stanton Street built?
City records list 1920 as the year it was built.
How many apartments are in 154 Stanton Street?
It has 1 residential units and 2 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.