25 Clinton Street
Manhattan, NY 10002BBL 1-00350-0029Map
Owner of record: 25 Clinton Street Associates, .
25 Clinton Street is a walk-up apartment building built in 1920 in Manhattan, 10002. It has 16 residential units across 5 floors. The owner of record is 25 Clinton Street Associates, .. HPD has recorded 17 housing violations here, most recently on April 1, 2021. 1 of the 17 most recent violations are still open.
- HPD violations
- 17
- DOB violations
- 8
- ECB violations
- 13
- HPD complaints
- 36
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 17
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 202, 2nd story, 2nd apartment from west at north
Jan 31, 2019 · Apt 202
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room at basement
Jan 31, 2019
Open — Not complied with - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 5th story
Dec 11, 2018
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story
Dec 11, 2018
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling at public hall, 5th story
Dec 11, 2018
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling. in the 1st room from east at south located at apt 501, 5th story, 1st apartment from east at south
Nov 19, 2018 · Apt 501
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 1st room from east at south located at apt 501, 5th story, 1st apartment from east at south
Nov 19, 2018 · Apt 501
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the kitchen located at apt 501, 5th story, 1st apartment from east at south
Nov 19, 2018 · Apt 501
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling. at public hall, 3rd story
Nov 19, 2018
Closed — Violation dismissed
Show 7 more ↓
- BHazardous
Repair the roof so that it will not leak over the ceiling. at public hall, 5th story
Nov 19, 2018
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling. at public hall, 5th story
Nov 19, 2018
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling. at public hall, 5th story
Nov 19, 2018
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling. at public hall, 3rd story
Nov 19, 2018
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors .. in the entire apartment located at apt 203, 2nd story, 1st apartment from west at north
Oct 26, 2018 · Apt 203
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 304, 3rd story, 2nd apartment from east at south
Jan 28, 2015 · Apt 304
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 28, 2015
Closed — Violation dismissed
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 21, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 21, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 21, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 21, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 21, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 21, 2011
Dob violation - dismissed - Plumbing none
P-plumbing none
May 23, 1991
Dob violation - dismissed
ECB violations · 13
- Class - 1
Occupancy contrary to that allowed by the c of o or building dept records. noted: building having occupied on 4th fl. apt 403 & on 5th fl apt #501 as transient hotel,contrary to c of o #56437 dated 10-1-62
Jun 15, 2011 · Penalty $800
Resolve - Class - 1
Sec. 1011.1 failure to provide exit signs where required for exits & exit doors. noted: building occupied as transient hotel in rooms #403 & 501 w/o providing exit signs. remedy: provide exit signs.
Jun 15, 2011 · Penalty $800
Resolve - Class - 1
Sec. 1001.4 failure to provide required means of egress from room or space. noted: apts #403 & 501 located on 4th & 5th floors occupied as transient hotel w/o providing 2 means of egress. remedy: discontinue
Jun 15, 2011 · Penalty $800
Resolve - Class - 1
Sec. 903.2.7 failure to provide automatic sprinkler system. building occupied as transient hotel w/o providing automatic sprinkler system. remedy: discontinue illegal occupancy.
Jun 15, 2011 · Penalty $800
Resolve - Class - 1
Sec. 907.2.8 failure to provide fire alarm system. noted: building occupied as transient hotel w/o providing fire alarm system. remedy: discontinue illegal occupancy.
Jun 15, 2011 · Penalty $800
Resolve - Class - 1
Sec. 1008.1.2.2 failure to comply door swing w/direction of egress travel. noted: building occupied as transient hotel having exit door (outer main entrance room) on ground floor swings against egress travel.
Jun 15, 2011 · Penalty $800
Resolve - Class - 2
Sec. 22-00 illegal use in residential district. noted: building occupied as a transient hotel in apts #403 & 501 in r7a general residential district,contrary to zoning resolution. remedy: discontinue illegal
Jun 15, 2011 · Penalty $800
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments. noted: erected non-illuminated accessory business projecting sign wording "sachiko's on clinton" horizontally mounted to the
Jun 15, 2011
Resolve - Class - 2
Work w/o a permit. work noted: erected store front 2 in direct illuminated accessory business awning signs wording "sachiko's on clinton" w/o 1st obtaining dob permit. remedy: stop all work,obtain permit to
Jun 15, 2011
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order noted: removed equipment scaffold suspended pic. remedy:comply with stop workorder
Dec 20, 2008
Resolve
Show 3 more ↓
- Class - 1
Supervision or use of rigging equipment w/o a rigger's license. noted:installed 2 suspended scaffolds w/o rigger license. remedy: comply w/code.
Dec 1, 2008
Resolve - Hazardous
Failure to maintain building. (haz) noted: bricks at front facade south side (5th floor) have broken & have fallen to sidewalk below creating a hazardous condition to the public. (2) stone bands & lintels are
Mar 25, 2003
Resolve - Hazardous
Failure to maintain bldg(haz)noted:(1) 2 bricks at front facade south side(5ht floor) have broken and have fallen to sidewalk below creatinga hazardous condition to the public.(2)stone bands and lintels are
Mar 25, 2003
Resolve
Complaints
- Heat/hot water
Apartment only
Feb 9, 2026 · Apt 404
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 404
Close - Heat/hot water
Apartment only
Jan 28, 2025 · Apt 303
Close - Plumbing
Water supply
Jan 22, 2025 · Apt 303
Close - Heat/hot water
Apartment only
Jan 21, 2025 · Apt 303
Close - Plumbing
Water supply
Dec 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2019 · Apt 401
Close - Heat/hot water
Apartment only
Mar 23, 2019 · Apt 504
Close
Show 26 more ↓
- Heat/hot water
Apartment only
Feb 12, 2019 · Apt 501
Close - Heat/hot water
Entire building
Jan 30, 2019 · Apt 201
Close - Heat/hot water
Entire building
Dec 20, 2018 · Apt 303
Close - Heat/hot water
Apartment only
Dec 8, 2018 · Apt 203
Close - Water leak
Slow leak
Dec 4, 2018 · Apt 501
Close - Water leak
Heavy flow
Dec 4, 2018 · Apt 501
Close - Heat/hot water
Apartment only
Dec 4, 2018 · Apt 501
Close - Water leak
Slow leak
Nov 17, 2018 · Apt 501
Close - Water leak
Heavy flow
Nov 17, 2018 · Apt 501
Close - Heat/hot water
Apartment only
Nov 17, 2018 · Apt 501
Close - Heat/hot water
Apartment only
Nov 8, 2018 · Apt 504
Close - Heat/hot water
Entire building
Oct 29, 2018 · Apt 203
Close - Heat/hot water
Apartment only
Oct 25, 2018 · Apt 203
Close - Heat/hot water
Apartment only
Oct 18, 2018 · Apt 203
Close - Heat/hot water
Entire building
Jan 7, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 31, 2015 · Apt 304
Close - Heat/hot water
Apartment only
Jan 26, 2015 · Apt 304
Close - Heat/hot water
Apartment only
Jan 22, 2015 · Apt 304
Close - Heat/hot water
Apartment only
Jan 14, 2015 · Apt 304
Close - Heat/hot water
Entire building
Nov 3, 2014 · Apt 304
Close - Heating
Heat related
Jan 17, 2007 · Apt 502
Close - Heating
Heat related
Oct 27, 2006 · Apt 204
Close - Heating
Heat related
Jan 26, 2006 · Apt 504
Close - Heating
Heat related
Jan 15, 2006 · Apt BLDG
Close - Heating
Heat related
Dec 12, 2005 · Apt 501
Close - Heating
Heat related
Jan 24, 2005 · Apt 304
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 5
- Residential units
- 16
- Building area
- 7,825 ft²
- Lot area
- 1,875 ft²
- Zoning
- R7A
- Community board
- 103
- Council district
- 2
- Block / lot
- 350 / 29
- Assessed value
- $1,688,850
- Landmark / historic district
- No
HPD registration #104230, last renewed Jul 14, 2025.
Questions about 25 Clinton Street
Who owns 25 Clinton Street?
The owner of record in NYC Department of City Planning PLUTO data is 25 Clinton Street Associates, ..
Does 25 Clinton Street have violations?
Yes. NYC HPD has recorded 17 housing violations at this property.
Is 25 Clinton Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 25 Clinton Street built?
City records list 1920 as the year it was built.
How many apartments are in 25 Clinton Street?
It has 16 residential units and 18 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.