89 Clinton Street
Manhattan, NY 10002BBL 1-00348-0023Map
Owner of record: 89 Clinton Holdings LLC
89 Clinton Street is a walk-up apartment building built in 1920 in Manhattan, 10002. It has 12 residential units across 5 floors. The owner of record is 89 Clinton Holdings LLC. HPD has recorded 41 housing violations here, most recently on October 10, 2026. 2 of the 41 most recent violations are still open.
- HPD violations
- 41
- DOB violations
- 6
- ECB violations
- 2
- HPD complaints
- 65
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 41
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1f, 1st story, 1st apartment from north at east
Oct 10, 2026 · Apt 1F
Open — Violation open - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at basement
Feb 1, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at basement
Feb 1, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1r, 1st story, 1st apartment from south at west
Feb 1, 2023 · Apt 1R
Open — False certification - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling at basement
Feb 1, 2023
Closed — Violation closed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the debris at basement at public hall
Jun 3, 2022
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Jun 3, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Jun 3, 2022
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st bathroom from east located at apt 3f, 3rd story, 1st apartment from north at east
Jun 3, 2022 · Apt 3F
Closed — Violation closed
Show 31 more ↓
- BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east
Jun 3, 2022 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east
Jun 3, 2022 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east
Jun 3, 2022 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st bathroom from east located at apt 3f, 3rd story, 1st apartment from north at east
Jun 3, 2022 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical light fixture at ceiling in the 2nd room from north located at apt 3f, 3rd story, 1st apartment from north at east
Jun 3, 2022 · Apt 3F
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east
Jun 3, 2022 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt phr, 5th story, 1st apartment from west at north
Feb 23, 2022 · Apt PHR
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt phr, 5th story, 1st apartment from west at north
Feb 23, 2022 · Apt PHR
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents rats at cellar
Feb 23, 2022
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the 2nd room from east at south located at apt 4f, 4th story, 1st apartment from north at east
Dec 9, 2021 · Apt 4F
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the 2nd room from east at south located at apt 4f, 4th story, 1st apartment from north at east
Dec 9, 2021 · Apt 4F
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4f, 4th story, 1st apartment from north at east
Dec 9, 2021 · Apt 4F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at bulkhead to roof at public hall, 5th story
Nov 16, 2021
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the 1st room from east at center located at apt phf, 5th story, 1st apartment from north at east
Nov 16, 2021 · Apt PHF
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east at center located at apt phf, 5th story, 1st apartment from north at east
Nov 16, 2021 · Apt PHF
Closed — Violation dismissed - BHazardous
Provide a piece of garden hose 10 feet in length with female coupling and a 10 quart pail on premises to test sprinkler system.
Nov 16, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt phf, 5th story, 1st apartment from north at east
Nov 16, 2021 · Apt PHF
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt phf, 5th story, 1st apartment from north at east
Nov 16, 2021 · Apt PHF
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt gf, 1st story, 1st apartment from east at south
Jul 1, 2021 · Apt GF
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of household items hindering fire escape egress at north on roof at fire escape
Mar 11, 2021
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at roof bulkhead at public hall, 4th story
Mar 11, 2021
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 20, 2021
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt gr, 1st story, 1st apartment from south at west
Jan 20, 2021 · Apt GR
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt gr, 1st story, 1st apartment from south at west
Jan 20, 2021 · Apt GR
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt phf, 5th story, 1st apartment from north at east
Dec 24, 2020 · Apt PHF
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit installed at window 5th story balcony at building front
Sep 2, 2020
Closed — Violation dismissed - ANon-hazardous
Provide safety caps/covers for electrical outlets at south wall at public hall, 5th story
Aug 10, 2020
Closed — Violation dismissed - ANon-hazardous
Provide safety caps/covers for electrical outlets at south wall at public hall, 4th story
Aug 10, 2020
Closed — Violation dismissed - ANon-hazardous
Provide safety caps/covers for electrical outlets at south wall at public hall, 3rd story
Aug 10, 2020
Closed — Violation dismissed - ANon-hazardous
Provide safety caps/covers for electrical outlets at south wall at public hall, 2nd story
Aug 10, 2020
Closed — Violation dismissed - ANon-hazardous
Provide safety caps/covers for electrical outlets at south wall at public hall, 1st story
Aug 10, 2020
Closed — Violation dismissed
DOB building violations · 6
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 2
- Non-hazardous
No permit for sidewalk shed
Mar 19, 2008
Resolve - Non-hazardous
Work without permit noted interiro demolition of all interior partition walls to relocate /make all new walls with new layout which falls under nmagor repair remedy 1-stop all work 2-obtain permit & approval fr
Feb 10, 1997 · Penalty $350
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 9, 2026 · Apt 1F
Open - Unsanitary condition
Mold
Apr 29, 2026 · Apt 1F
Close - Water leak
Slow leak
Apr 29, 2026 · Apt 1F
Close - Flooring/stairs
Floor
Apr 29, 2026 · Apt 1F
Close - Paint/plaster
Ceiling
Apr 29, 2026 · Apt 1F
Close - Heat/hot water
Entire building
Apr 18, 2026 · Apt BLDG
Close - Plumbing
Water supply
Apr 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Nov 14, 2024 · Apt 1F
Close - Unsanitary condition
Mold
Nov 14, 2024 · Apt 1F
Close
Show 40 more ↓
- Unsanitary condition
Mold
Oct 9, 2023 · Apt 4R
Close - Unsanitary condition
Mold
Aug 29, 2023 · Apt 2R
Close - Unsanitary condition
Pests
Aug 29, 2023 · Apt 2R
Close - Paint/plaster
Wall
Aug 29, 2023 · Apt 2R
Close - Water leak
Slow leak
Jul 19, 2023 · Apt GR
Close - Unsanitary condition
Pests
Jan 28, 2023 · Apt GR
Close - Unsanitary condition
Pests
Jan 27, 2023 · Apt 1R
Close - Door/window
Door
Jan 26, 2023 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
Jan 26, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 26, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 17, 2022 · Apt GR
Close - Unsanitary condition
Pests
May 25, 2022 · Apt 3F
Close - Unsanitary condition
Pests
Feb 13, 2022 · Apt PHR
Close - Unsanitary condition
Pests
Feb 10, 2022 · Apt PHR
Close - Heat/hot water
Apartment only
Jan 14, 2022 · Apt PHF
Close - Water leak
Damp spot
Dec 1, 2021 · Apt 4F
Close - Unsanitary condition
Mold
Dec 1, 2021 · Apt 4F
Close - Heat/hot water
Apartment only
Nov 15, 2021 · Apt PHF
Close - Heat/hot water
Apartment only
Nov 12, 2021 · Apt PHF
Close - Water leak
Slow leak
Nov 7, 2021 · Apt 4F
Close - Unsanitary condition
Pests
Aug 30, 2021 · Apt PHR
Close - Heat/hot water
Apartment only
Aug 29, 2021 · Apt 4R
Close - Water leak
Slow leak
Jun 22, 2021 · Apt GF
Close - Unsanitary condition
Mold
Jun 22, 2021 · Apt GF
Close - Unsanitary condition
Pests
Jun 22, 2021 · Apt GF
Close - Heat/hot water
Apartment only
Jan 19, 2021 · Apt GR
Close - Heat/hot water
Apartment only
Dec 23, 2020 · Apt PHF
Close - Heat/hot water
Apartment only
Dec 20, 2020 · Apt PHF
Close - Water leak
Damp spot
Nov 17, 2020 · Apt APTPHR
Close - Water leak
Slow leak
Nov 17, 2020 · Apt APTPHR
Close - Door/window
Window pane
Sep 23, 2020 · Apt GR
Close - Unsanitary condition
Mold
Sep 23, 2020 · Apt GR
Close - Water leak
Heavy flow
Sep 18, 2020 · Apt GR
Close - General
Ventilation system
Sep 18, 2020 · Apt GR
Close - Safety
Fire escape
Sep 18, 2020 · Apt GR
Close - Unsanitary condition
Mold
Sep 18, 2020 · Apt GR
Close - Paint/plaster
Wall
Aug 20, 2020 · Apt PHR
Close - Water leak
Damp spot
Aug 20, 2020 · Apt PHR
Close - Safety
Smoke detector
Aug 6, 2020 · Apt APTPHR
Close - Water leak
Slow leak
Aug 6, 2020 · Apt APTPHR
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 5
- Residential units
- 12
- Building area
- 10,381 ft²
- Lot area
- 2,500 ft²
- Zoning
- R7A
- Community board
- 103
- Council district
- 1
- Block / lot
- 348 / 23
- Assessed value
- $2,205,000
- Landmark / historic district
- No
HPD registration #102290, last renewed Oct 16, 2025.
Questions about 89 Clinton Street
Who owns 89 Clinton Street?
The owner of record in NYC Department of City Planning PLUTO data is 89 Clinton Holdings LLC.
Does 89 Clinton Street have violations?
Yes. NYC HPD has recorded 41 housing violations at this property.
Is 89 Clinton Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 89 Clinton Street built?
City records list 1920 as the year it was built.
How many apartments are in 89 Clinton Street?
It has 12 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.