roofy

68 Clinton Street

Manhattan, NY 10002BBL 1-00344-0138Map

Owner of record: 68 Clinton Street,

68 Clinton Street is a walk-up apartment building built in 1910 in Manhattan, 10002. It has 7 residential units across 5 floors. The owner of record is 68 Clinton Street,. HPD has recorded 65 housing violations here, most recently on December 15, 2025. 1 of the 50 most recent violations are still open.

HPD violations
65
DOB violations
8
ECB violations
3
HPD complaints
54

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Dec 15, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 65

  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story

    Dec 15, 2025

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story

    Dec 15, 2025

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story

    Dec 15, 2025

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4a, 5th story, 1st apartment from east at south

    Jan 27, 2025 · Apt 4A

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system locked door at basement at boiler room

    Jan 27, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective push/panic bar installed at bulkhead door to roof preventing re-entry to building from roof at public hall stairs, 5th story

    Jan 27, 2025

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood deck installed on roof , 5th story

    Jan 27, 2025

    Open — Nov sent out
  • A

    Repair the broken or defective connection at drain pipe at sink in the kitchen located at apt 1a, 2nd story, 2nd apartment from east at south

    Aug 9, 2022 · Apt 1A

    Closed — Violation dismissed
  • B

    Remove all obstructions and repair all defects in drain pipe at sink in the kitchen located at apt 1a, 2nd story, 2nd apartment from east at south

    Aug 9, 2022 · Apt 1A

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 1a, 2nd story, 2nd apartment from east at south

    Aug 9, 2022 · Apt 1A

    Closed — Violation dismissed
Show 40 more ↓
  • C

    M/d law abate the nuisance consisting of air conditioner protruding from window obstructing egress balcony at 3rd and 4th story balcony at building front

    Oct 7, 2021

    Closed — Violation closed
  • C

    Code: arrange and make self-closing the doors vestibule at public hall, 1st story

    Jul 26, 2021

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective glass pane at front entrance door to building at public hall, 1st story

    Jul 26, 2021

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of garbage bins at public hall, 1st story

    Jul 26, 2021

    Closed — Violation dismissed
  • C

    Arrange and make self-closing the doors ' in the entrance located at apt 2a, 3rd story, 1st apartment from east at south

    Mar 18, 2021 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2a, 2nd story, 2nd apartment from west at north

    Mar 15, 2021 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2a, 2nd story, 2nd apartment from west at north

    Mar 15, 2021 · Apt 2A

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective shut off valve at radiator in the 3rd room from north located at apt 2a, 2nd story, 2nd apartment from west at north

    Mar 15, 2021 · Apt 2A

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 2a, 2nd story, 2nd apartment from west at north

    Mar 15, 2021 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2a, 3rd story, 2nd apartment from east at south

    Mar 9, 2021 · Apt 2A

    Closed — Violation dismissed
  • C

    Arrange and make self-closing the doors ... in the entrance located at apt 2a, 3rd story, 2nd apartment from east at south

    Mar 9, 2021 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2a, 3rd story, 2nd apartment from east at south

    Mar 9, 2021 · Apt 2A

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2a, 3rd story, 2nd apartment from east at south

    Mar 7, 2021 · Apt 2A

    Closed — Violation closed
  • A

    Properly repair the broken or defective bell return buzzer from street entrance to the apartment in the entrance located at apt 2a, 3rd story, 2nd apartment from east at south

    Mar 7, 2021 · Apt 2A

    Closed — Violation dismissed
  • C

    Code: arrange and make self-closing the doors .. in the entrance located at apt 2a, 3rd story, 2nd apartment from east at south

    Mar 7, 2021 · Apt 2A

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at basement

    Mar 7, 2021

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective spring balance at lower sash at window leading to fire escape in the 3rd room from east at north located at apt 2a, 3rd story, 2nd apartment from east at south

    Mar 7, 2021 · Apt 2A

    Closed — Violation dismissed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all story balconies at fire escape at west

    Mar 5, 2021

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of free standing radiators (5) at public hall, 5th story

    Mar 5, 2021

    Closed — Violation closed
  • C

    Arrange and make self-closing the doors to roof at bulkhead at public hall, 5th story

    Mar 5, 2021

    Closed — Violation closed
  • B

    Properly secure the loose faucet at sink in the kitchen located at apt 4a, 5th story, 1st apartment from east at south

    Mar 5, 2021 · Apt 4A

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4a, 5th story, 1st apartment from east at south

    Mar 5, 2021 · Apt 4A

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective ceramic tiles at floor at public hall, 2nd story

    Mar 5, 2021

    Closed — Violation closed
  • C

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the boiler room at cellar

    Mar 5, 2021

    Closed — Violation dismissed
  • C

    Arrange and make self-closing the doors to boiler room at cellar

    Mar 5, 2021

    Closed — Violation closed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all balconies, conponets at all balconies at 1st fire escape from north

    Mar 3, 2021

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of garbage bin at public hall, 1st story

    Jan 27, 2021

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Jan 27, 2021

    Closed — Violation closed
  • C

    Code: arrange and make self-closing the doors . in the entrance located at apt 4b, 5th story, 1st apartment from north at east

    Jan 27, 2021 · Apt 4B

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 5th story, 1st apartment from north at east

    Jan 27, 2021 · Apt 4B

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4b, 5th story, 1st apartment from north at east

    Jan 27, 2021 · Apt 4B

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system no door leading to basement at boiler room, 1st story

    Jan 27, 2021

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4a, 5th story, 1st apartment from east at south

    Jan 19, 2021 · Apt 4A

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system boiler room door locked at basement

    Jan 19, 2021

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Jan 19, 2021

    Closed — Violation dismissed
  • C

    Code: arrange and make self-closing the doors in the entrance located at apt 4b, 5th story, 1st apartment from north at east

    Jan 19, 2021 · Apt 4B

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story

    Jan 19, 2021

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4b, 4th story, 1st apartment from west at north

    Dec 18, 2020 · Apt 4B

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system basement door locked at boiler room

    Dec 18, 2020

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north

    Dec 18, 2020 · Apt 4B

    Closed — Violation closed

DOB building violations · 8

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 3

  • Class - 2

    Occupancy contrary to that allowed by the certificate of occupancy or building dept records: observed on roof added structure and deckin gas shown in plans for job#122438558 professionally certified and signed

    Aug 11, 2017 · Penalty $1,200

    Resolve
  • Class - 2

    B254,15,24b,32a,38,44c,48b,50,50a,50b. 50-both steam controls on one 1/4 pipe to boiler; 50a-hwh flue unsupported and in contact w/gas pipe50b-louver thru boiler room wall to locker room

    Jul 28, 2015 · Penalty $500

    Active
  • Class - 2

    B254,4a,6a,24b

    Jul 28, 2015

    Resolve

Complaints

  • Appliance

    Electric/gas range

    Feb 13, 2026 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2025 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Dec 12, 2025 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2025 · Apt BLDG

    Close
  • Plumbing

    Toilet

    Dec 5, 2025 · Apt 4A

    Close
  • Plumbing

    Toilet

    Dec 5, 2025 · Apt 4A

    Close
  • Plumbing

    Toilet

    Dec 5, 2025 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Nov 18, 2025 · Apt 4A

    Close
  • Safety

    Carbon monoxide detector

    Nov 18, 2025 · Apt 4A

    Close
Show 40 more ↓
  • Safety

    Smoke detector

    Nov 18, 2025 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Nov 13, 2025 · Apt 4A

    Close
  • Safety

    Smoke detector

    Nov 13, 2025 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Jan 23, 2025 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Nov 14, 2024 · Apt 1A

    Close
  • Electric

    Power outage

    Sep 23, 2023 · Apt 4A

    Close
  • Plumbing

    Basin/sink

    Jul 27, 2022 · Apt 1A

    Close
  • Plumbing

    Basin/sink

    Jul 27, 2022 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Feb 15, 2022 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Jan 9, 2022 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Nov 17, 2021 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Oct 30, 2021 · Apt 2A

    Close
  • Door/window

    Door

    Jul 12, 2021 · Apt BUILDI

    Close
  • Outside building

    Roof door/hatch

    May 4, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 16, 2021 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Mar 16, 2021 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Mar 15, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 13, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 9, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 8, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 7, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 6, 2021 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Mar 6, 2021 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Mar 3, 2021 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Mar 1, 2021 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Feb 26, 2021 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2021 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Jan 26, 2021 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2020 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Dec 15, 2020 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2020 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Dec 9, 2020 · Apt 4B

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2020 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Jan 6, 2018 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Jan 1, 2018 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Feb 11, 2015 · Apt 3B

    Close
  • Heat/hot water

    Apartment only

    Nov 14, 2014 · Apt 3B

    Close
  • Nonconst

    Vermin

    Aug 19, 2012 · Apt 2B

    Close
  • Heating

    Heat related

    Dec 4, 2008 · Apt 3B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1910
Floors
5
Residential units
7
Building area
5,655 ft²
Lot area
1,637 ft²
Zoning
R7A
Community board
103
Council district
1
Block / lot
344 / 138
Assessed value
$1,969,650
Landmark / historic district
No

HPD registration #129422, last renewed Sep 11, 2025.

Questions about 68 Clinton Street

Who owns 68 Clinton Street?

The owner of record in NYC Department of City Planning PLUTO data is 68 Clinton Street,.

Does 68 Clinton Street have violations?

Yes. NYC HPD has recorded 65 housing violations at this property.

Is 68 Clinton Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 68 Clinton Street built?

City records list 1910 as the year it was built.

How many apartments are in 68 Clinton Street?

It has 7 residential units and 8 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.