roofy

79 Eldridge Street

Manhattan, NY 10002BBL 1-00306-0029Map

Owner of record: Eldridge Hotel LLC

79 Eldridge Street is a hotel built in 2018 in Manhattan, 10002. The owner of record is Eldridge Hotel LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
2
ECB violations
47
HPD complaints
1

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 2

  • Construction other optional

    Borough commissioner stop work order application #122826843 due to contractor withdrawal. construction site is closed and padlocked, unable to determine percentage of work completed.

    Oct 29, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 31, 2021

    Dob violation - dismissed

ECB violations · 47

  • Class - 2

    At time of my inspection, i observed that information project panel was not eligble.comply with code

    Nov 21, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Observed 14 story nb with no sidewalk shed at exp#1 where required-uppon checking site safety plan it shows shed should be in place(pedestrian protection) and installed at exp#1(not in place)-uppon checking dob

    Jul 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Work without a permit expired permit.note:observed construction fence was installed without a valid permit.the previous permit#122826843-01-eq-fn expired on 09-15-2022.recurring condition;previously mentioned o

    Apr 5, 2024 · Penalty $3,125

    Resolve
  • Class - 2

    Temporary construction equipment or installation on site expired permit #1228268243-01-eq-fn expired on 09-15-2022. remedy: renew permit.

    Dec 26, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Temporary construction equipment or installation on site expired permit. #122826843-01-e9-fn expired on 09-15-2022. remedy: renew permit

    Aug 29, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Observed 14 str new bldg- topped off, with a sidewalk shed at exp#1. the required red light marking the location of the standpipe connection was not provided on the outside/street-facing side of the sws, as req

    Aug 28, 2023

    Resolve
  • Class - 2

    Observed a sidewalk shed at exp#1 with a loose/warped parapet panel, creating a hazard for pedestrians and/or vehicles. also observed vandalized markings on several parapet panels.

    Aug 28, 2023 · Penalty $2,400

    Resolve
  • Class - 2

    Observed a jobsite fence at exp#1 not fully painted hunter green due excessive vandalized markings throughout, and with the viewing panel also partially painted, making it not fully see-through.

    Aug 28, 2023 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to maintain/display onsite documents required by bc chapter 33as noted at time of inspection on an active construction site,14 storynew building completed to bulkhead,observed at exp4 in place with new

    Mar 2, 2023 · Penalty $625

    Resolve
  • Class - 2

    Temporary construction equipment onsite-construction plywood fence permit expired.as at time of inspection on an active construction site,observed construction plywood fence permit has expired on 9/15/2022 perm

    Mar 2, 2023 · Penalty $3,125

    Resolve
Show 37 more ↓
  • Class - 1

    Failure to notify dept of accident/incident that resulted in fatality or injury.note-worker was on aframe ladder lost balance&fell.worker suffering from pain in his back was taken to hosp.as per check of dept r

    Jun 24, 2022

    Resolve
  • Class - 2

    Posting of unlawful signs information pictorial representation business or advertisting message on protective structures (fence) note:during time of inspection observed inactive job site graphitti on constructi

    Nov 1, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Bc3301.6 failure to provide design drawings for platform.at time of inspection on active 14 story nb construction site observed platforms inside elevator shaft.when requested design drawings for platform was in

    Aug 2, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain adequate guardrail as per code. at time of inspection on active 14 story nb construction site observed on 14th floor opening only maintain with sheetrock being used to close opening that ris

    Aug 2, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    Bc3314.4.8 failure to maintain pipe scaffold as per code.at time of inspection on active 14 story nb construction site observed pipe scaffold at exp #3 not maintained as per code pipe scaffold had inadequate ne

    Aug 2, 2021

    Resolve
  • Class - 2

    Job site construction fence is not maintained.at time of inspection of a 14 story nb.observed job site closed with no construction activity.construction fence installed at exp #1 in poor condition and inadequat

    Jun 2, 2021

    Resolve
  • Class - 2

    Bc3301.7 failure to provide approved pe details/eor noted:atoi for active const site@bulkhead level.observed:12"x12" opening (illegible) in all typical fl corridor slab&steel reinforcement rebar has been cut&re

    May 14, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Bc 3301.7 failure to provide approved p.e design drawing. as noted:at time of inspection for an active construction site 14 stories. observed steel structure stairway installed up to roof level and concrete for

    Jan 8, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements. atthe time of inspection on an active job site currently at roof level,iobserved inadequate housekeeping,consisting of sheetrock,wood planks,m

    Jan 4, 2021

    Resolve
  • Class - 2

    Bc 3314.8.2 debris netting. at the time of inspection on an active jobsite currently at roof level i observed debris netting around pipe scaffold at exposure 3 not properly enclosed to wall creating a potential

    Jan 4, 2021

    Resolve
  • Class - 2

    Sec. 3301.2 safety measures & standars. atthe time of an inspection ofa new bldg under construction,i observed lots of 6-7" holes throughoutthe floor of a slab of a jobsite. improper holes creates penetration

    Sep 1, 2020

    Resolve
  • Class - 2

    Sec. 3308.6 inadequate nettings. at the time of an inspection of a newbldg under construction,i observed inadequate nettings on the guardrails throughout the perimeter & at exp#1,exp#3 of the jobsite. vertical

    Sep 1, 2020

    Resolve
  • Class - 1

    Failure to maintained records of prf-shift safety meeting for each worker.at the time of inspection i observe active jobsite with construction activities on-going ssc a.1(aporch present,upon request of prf-shif

    Jun 29, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    3307.4.3 udocks/barriers not filled/vehicular traffic.at the time of inspection i observe active jobsite with construction activities ongoing.at exposure#1 of proposed job barricade on die striet protecting & c

    Jun 29, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to safeguard/failure maintained safety operations.at the time of inspection i observe active construction jobsite.upon making walk through with designed ssc i observe various looking of caz(control acce

    Jun 29, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Work contrary to stop work order at the time of my inspection responding to complaint#1538934,i observed hoist working against a stop work order that was posted 03-16-2020 violation#35469156m/57/y/58x work whil

    Mar 17, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Bc330910-protectoin of roof/overhead.note:at the time of my inspectionof an active job site 14 story new building i observed missing roof protection for adj.property as exp#2-rear yard.also i observed inadequat

    Mar 16, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and or approved amendments.at the time of inspection i observed active constructionsite at 14 story new building.hoist at exp#1.temporary hoist as does n

    Mar 16, 2020 · Penalty $625

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments.note:at the time of inspection i observed active construction.construction site at 14 story new building.also i observed tempo

    Mar 16, 2020 · Penalty $625

    Resolve
  • Class - 2

    Bc 3301.2 failure to instittute/maintain safety measures @time of inspection of a 14 sty building under const i observed street/road enclosure equipment (yodocs) @exp.1 in the street.the yodocks were not filled

    Nov 1, 2019

    Resolve
  • Class - 2

    Job site fence not constructed or maintained pursuant to subsection. @time of inspection of a 14 sty building under const, i observed a const fence with a gate,@exp.1 the gate was learning heavily & was crooked

    Nov 1, 2019

    Resolve
  • Class - 1

    Bc33012-failure to institute/maintain safety measures.at time of inspection of a 14 story building under construction i observed that the top floor working deck had guard rails covered with plastic not allwed a

    Nov 1, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 3301.2 failure to maintain safety measures @time of inspection of aa 14 sty building under const, i observed that the sidewalk shed erected @xp.1 had a pipe/cross brace that partially blocked the fire escape

    Nov 1, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    28-301.1 failure to comply with dob high winds advisory. @time of inspection of a 14 sty building under const i observed that the horizontalnetting was left open (down) @exp.1+2 as per a dob weather advisory

    Nov 1, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 3307.6 sidewalk shed nnot constructed/maintained as required. @timeof inspection of a 14 sty new building under const, i observed a sidewalk shed with the following conditions:missing cross brakes. standpipe

    Nov 1, 2019 · Penalty $625

    Resolve
  • Class - 2

    Bc33086-failure to or maintain horizontal safety netting where required.at time of inspection of a 14 story new building under construction i observed horizontal safety netting at exp 1 & 2,more than 2 stories

    Nov 1, 2019

    Resolve
  • Class - 1

    Failure to perform to successfull hydrostattic pressure test of standpipe system. @time of inspection of a 14 sty new building under const, observed that the 10th floor had been pored. upon review of the dob

    Nov 1, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    Inadequate guardrails. at time of inspection i observed inadequate guardrails at the perimeter of the site at multiple levels. failure tocomply with osha regulations is a violation, and creates a hazard.

    May 30, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to safeguard all persons and property affected by constructionoperations. at time of inspection on an active construction site, notice that the sidewalls shed was built that in that it was obstructing

    May 30, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    3305.3.4 work not to approve drawings on construction site. at time of inspection on an active construction site 14 story new building, notice concrete formwork taking place on floors 6 and 7 a closer look at

    May 30, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Gaps/holes/openings unprotected or inadequate protection at floors, multiple levels. at time of inspection i observed multiple holes/openings through floor slabs at multiple levels. this creates a possible fall

    May 30, 2019 · Penalty $10,000

    Resolve
  • Class - 1

    Work not conforming to approve construction documetns. sidewalk shed. at time of inspection on an active construction site, notice that the sidewalk shed was not built according to what was on the approve plans

    May 30, 2019 · Penalty $625

    Resolve
  • Class - 1

    Work not to site safety plan on site. at time of inspection on an active construction site, notice that dot approve barriers, pedestrianwalkway and partial sidewalk closure sign directions all were not in

    May 30, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Housekeeping. at time of inspection i observed slip/trip hazards at the cellar, 1st, 4,5,6,and 7th floors. this is a failure to maintain housekeeping violation. rmdy: stop all new maintain housekeepig throug

    May 30, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to provide approved /accepted construction documents.at the time of inspection. at time of inspection it was observed that constractor failed to provide approved drawings for foundation and support.

    Oct 10, 2018

    Resolve
  • Class - 2

    3307.3.2 failure to provide lot line fence. at the time of insepction observed no construction fence installed at exp#3 and exp#4 the contractor did not totally enclose his construction site and did not protect

    Oct 10, 2018

    Resolve
  • Class - 1

    Sec. 3310.5.2 site safety not present. at time of inspection of a 14 sty bldg,currently on the foundation phase i observed 4 workers in the site conducting rebar installation. i requested to speak to the site

    Jul 18, 2018 · Penalty $10,000

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Sep 9, 2025 · Apt ROOM4D

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H3)
Year built
2018
Floors
14
Residential units
—
Building area
19,120 ft²
Lot area
2,525 ft²
Zoning
C6-1G
Community board
103
Council district
1
Block / lot
306 / 29
Assessed value
$2,994,300
Landmark / historic district
No

Questions about 79 Eldridge Street

Who owns 79 Eldridge Street?

The owner of record in NYC Department of City Planning PLUTO data is Eldridge Hotel LLC.

Does 79 Eldridge Street have violations?

NYC HPD has no housing violations on record for this property.

Is 79 Eldridge Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 79 Eldridge Street built?

City records list 2018 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.