roofy

111 Bowery

Manhattan, NY 10002BBL 1-00304-0009Map

Owner of record: Karamal Realty Corp

111 Bowery is a store building built in 1900 in Manhattan, 10002. It has 2 residential units across 4 floors. The owner of record is Karamal Realty Corp. HPD has recorded 32 housing violations here, most recently on September 19, 2024. 3 of the 32 most recent violations are still open.

HPD violations
32
DOB violations
0
ECB violations
2
HPD complaints
34

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Sep 19, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 32

  • B

    Repair the roof so that it will not leak over ceiling at public hall, 4th story

    Sep 19, 2024

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 19, 2024

    Closed — Violation dismissed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Sep 19, 2024

    Closed — Violation dismissed
  • A

    Provide ventilation for water closet compartment and/or bathroom and file application for approval before doing work , in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Sep 19, 2024 · Apt 2

    Open — Invalid certification
  • B

    Properly repair or replace the broken or defective bell/buzzer intercom system from building entrance to unit at north wall panel in the 3rd room from east at south located at apt 2, 2nd story, 1st apartment from north at east

    Sep 19, 2024 · Apt 2

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department east wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Sep 19, 2024 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Sep 19, 2024 · Apt 2

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 3rd room from east at south located at apt 2, 2nd story, 1st apartment from north at east

    Sep 19, 2024 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 3rd room from east at south located at apt 2, 2nd story, 1st apartment from north at east

    Sep 19, 2024 · Apt 2

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Sep 19, 2024 · Apt 2

    Closed — Violation dismissed
Show 22 more ↓
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Sep 19, 2024 · Apt 2

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective brick and mortar at north wall in the 1st room from east located at apt 2, 2nd story, 1st apartment from north at east

    Sep 19, 2024 · Apt 2

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling at public hall, 4th story

    Sep 19, 2024

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story

    Sep 19, 2024

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from north at east

    Sep 19, 2024 · Apt 2

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from north at east

    Sep 19, 2024 · Apt 2

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Sep 19, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story

    Sep 19, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Sep 19, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Sep 19, 2024

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from north at east

    Sep 19, 2024 · Apt 2

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from north at east original violation 17287711 issued 19-sep-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Sep 19, 2024 · Apt 2

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Aug 9, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 9, 2024

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Aug 9, 2024

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Aug 9, 2024

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Aug 9, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Aug 9, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Aug 9, 2024

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Jul 18, 2024 · Apt 2

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east original violation 17127883 issued 18-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jul 18, 2024 · Apt 2

    Open — First no access to re- inspect violation
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 2

  • Class - 2

    Failure of permit holder to provide inspection access to and/or expose ongoing construction or work on an active and permitted worksite., provide access and/or exposure to ongoing construction or work

    Jul 10, 2024 · Penalty $6,250

    Resolve
  • Class - 2

    At the time of inspection i observed hanging and unsecured wires ungrounded water heater and exposed wires in the basement in the area where the fire damage occur, comply with ec

    Jun 26, 2023 · Penalty $830

    Active

Complaints

  • Flooring/stairs

    Floor

    Sep 17, 2024 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Sep 17, 2024 · Apt 2

    Close
  • Electric

    Outlet/switch

    Sep 17, 2024 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Sep 17, 2024 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Sep 17, 2024 · Apt 2

    Close
  • General

    Bell/buzzer/intercom

    Sep 17, 2024 · Apt 2

    Close
  • General

    Ventilation system

    Sep 17, 2024 · Apt 2

    Close
  • Door/window

    Window frame

    Sep 17, 2024 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Sep 17, 2024 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Sep 17, 2024 · Apt 2

    Close
Show 24 more ↓
  • Water leak

    Slow leak

    Sep 17, 2024 · Apt 2

    Close
  • Plumbing

    Water supply

    Sep 17, 2024 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Jul 29, 2024 · Apt 2

    Close
  • Electric

    Wiring

    Jul 29, 2024 · Apt 2

    Close
  • Water leak

    Slow leak

    Jul 16, 2024 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Jul 16, 2024 · Apt 2

    Close
  • General

    Ventilation system

    Jul 16, 2024 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jul 16, 2024 · Apt 2

    Close
  • Plumbing

    Radiator

    Oct 25, 2023 · Apt 2

    Close
  • Water leak

    Slow leak

    Oct 25, 2023 · Apt 2

    Close
  • Water leak

    Damp spot

    Oct 25, 2023 · Apt 2

    Close
  • Door/window

    Window frame

    Oct 25, 2023 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Oct 25, 2023 · Apt 2

    Close
  • General

    Bell/buzzer/intercom

    Oct 16, 2023 · Apt 2NDFL

    Close
  • Door/window

    Window frame

    Oct 16, 2023 · Apt 2NDFL

    Close
  • Flooring/stairs

    Floor

    Oct 16, 2023 · Apt 2NDFL

    Close
  • General

    Ventilation system

    Oct 16, 2023 · Apt 2NDFL

    Close
  • Paint/plaster

    Ceiling

    Oct 16, 2023 · Apt 2NDFL

    Close
  • Safety

    Carbon monoxide detector

    Oct 16, 2023 · Apt 2NDFL

    Close
  • Safety

    Smoke detector

    Oct 16, 2023 · Apt 2NDFL

    Close
  • Appliance

    Electric/gas range

    Oct 16, 2023 · Apt 2NDFL

    Close
  • Paint/plaster

    Wall

    Oct 16, 2023 · Apt 2NDFL

    Close
  • Heat/hot water

    Apartment only

    Oct 16, 2023 · Apt 2NDFL

    Close
  • General

    Cooking gas

    Oct 5, 2023 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Store building (K4)
Year built
1900
Floors
4
Residential units
2
Building area
6,992 ft²
Lot area
2,180 ft²
Zoning
C6-1G
Community board
103
Council district
1
Block / lot
304 / 9
Assessed value
$1,282,050
Landmark / historic district
No

HPD registration #144805, last renewed Aug 29, 2025.

Questions about 111 Bowery

Who owns 111 Bowery?

The owner of record in NYC Department of City Planning PLUTO data is Karamal Realty Corp.

Does 111 Bowery have violations?

Yes. NYC HPD has recorded 32 housing violations at this property.

Is 111 Bowery rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 111 Bowery built?

City records list 1900 as the year it was built.

How many apartments are in 111 Bowery?

It has 2 residential units and 5 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.