roofy

55 Chrystie Street

Manhattan, NY 10002BBL 1-00303-0027Map

Owner of record: Lg Chrystie LLC

55 Chrystie Street is an office building built in 1900 in Manhattan, 10002. The owner of record is Lg Chrystie LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
39
ECB violations
51
HPD complaints
3

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 39

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 25, 2018

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 7, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 24, 2017

    Dob violation - resolved
Show 29 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 10, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 27, 2015

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 11, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 22, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 30, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 19, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 26, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 3, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 31, 2008

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Mar 26, 2008

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 21, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 8, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 17, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 26, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 11, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    1p2044

    Jun 6, 2002

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Mar 14, 2002

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Mar 14, 2002

    Vw*-violation - work w/o permit dismissed
  • Elevator elevatorrequired

    1p2044/cease use

    May 16, 2001

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 10, 2000

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll16-local law 16/84 - elevator elevatoroptional

    May 14, 1992

    Vp*-violation unserved ecb- dismissed
  • Plumbing none

    P-plumbing none

    Oct 24, 1990

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Apr 26, 1990

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Apr 26, 1990

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Apr 26, 1990

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Apr 4, 1990

    Dob violation - dismissed
  • Boiler boiler optional

    3a

    Dec 26, 1989

    Dob violation - dismissed
  • Elevator elevatorrequired

    51-car flr repair 52-date & tag gov for 5yr 53-replace light

    Jan 13, 1989

    Dob violation - resolved
  • Elevator elevatorrequired

    (51) car floor repair (52) date and tag governor for 5yr test (53) replace light

    Jan 13, 1989

    Dob violation - resolved

ECB violations · 51

  • Class - 1

    Observed a new sprinkler system installed without any sprinkler permit on file under dob records for the 3rd and 4th floor. all work done 100%, obtain permit

    Apr 11, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Observed a new sprinkler system installed without any sprinkler inspections conducted on the 3rd and 4th floor. no records show any sprinkler inspections under dob records, perform successful hydrostatic pressu

    Apr 11, 2023 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner. at time of inspection observed excessive amounts of combustible/flammable garbage & construction material being stored at roof level obstructing/hindering

    Apr 6, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Work without a permit. at time of inspection observed at roof level existing water tower has been demolished/removed with new installed. also metal conduit with wiring for fire alarm. no job filings or permits

    Apr 6, 2023

    Resolve
  • Class - 1

    97m07: (97-m-07) no door lock monitoring installed in controller as mandated in appendix k of the 2014 building codes. remedy: install dlm file and perform test with dob

    Apr 18, 2021

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order contained in summons/violation#35296656x issued on 11/12/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for work without a permi

    Mar 17, 2020 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to comply with commissioners order contained in summons/violation #35296656x issued on 11-12-2017,and to file a certificate of correction pursuant to 28-201.1 and 1 rcny 102-01.work without a permi comp

    Nov 18, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#35296656x issued on 11/12/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o permit. remedy: comply w/comm's order &/or file a c of

    Jul 24, 2019 · Penalty $12,500

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#35296656x issued on 11/12/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permimt. remedy: comply w/comm's order &/or file

    Jan 14, 2019 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons/violation#35296656x issued on 11/12/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit.rem

    Nov 28, 2018 · Penalty $2,500

    Resolve
Show 40 more ↓
  • Class - 1

    Failure to comply with the commissioner's order contained in summons/violation #35296656x issued 11/02/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. rem: comply with commissi

    Oct 18, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order contained in summons/violation #35337120x issued 07/17/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. unlawful acts. failure to

    Sep 5, 2018

    Resolve
  • Class - 1

    Unlawful act failure to comply w/order of the comm.roof west side erected.failure to comply w/comm's order contained in summ/vio#35337589n issued on 06/01/18 and to file a cofc pursuant to 28-201.1 and 1rcny 10

    Jul 17, 2018

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons/v olation#35326312r issued on 04/18/18 and to file a certificate of cor ection pursuant to 28-201.1 and 1rcny 102-01.@ roof,west side,erected

    Jun 1, 2018

    Resolve
  • Class - 1

    Failure to comply with commissioners order contained summons/violation#35249608j issued on 08/31/17 amd to file certificate of correction p ursuants to 28-201.1 and 1rcny 102-01.rem:comply with commissioner ord

    Apr 9, 2018

    Resolve
  • Class - 1

    Failure to comply w/comm's order contained in summ/vio#35296656x iss'don 11/02/15 and to file a cofc pursuant to 28-201.1 and 1rcny 102-01. in roof west side of roof erected wooden wall approx 6ft high 20ft lon

    Jan 25, 2018 · Penalty $6,000

    Resolve
  • Class - 1

    Work w/o a permit. in roof west side of roof erected wooden wall approx 6ft hight 20ft long & erected decking on roof. remedy: obtain all required permit.

    Nov 2, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Work w/o a permit. noted: in commercial space 2 1st fl observed const.work done w/o a permit as new metal studs,new gypsum board installed. approx. 30ft length of a c duct installed including hvac unit,new bx w

    Aug 24, 2017 · Penalty $2,000

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in nov #35153330h issued on 1/12/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.

    Jan 20, 2016 · Penalty $800

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in nov#35153330h issued on 01/12/15 and to file a certificate of correction pursuant to 28-201.1, 28-204.4 and 1rcny102-01. work w/o permit. rmdy: comply w

    Oct 13, 2015 · Penalty $800

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order contained in notice in violation #35153330h issued on 01/12/15.work w/o a permit.no current permit on file @ time of original violation for work in room 504.rem:c

    Feb 25, 2015 · Penalty $2,430

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35153330h issued on 11/23/14. noted: no record of compliance. no relevant jobs filed. remedy: comply w/the comm's order.

    Jan 12, 2015 · Penalty $12,000

    Resolve
  • Class - 1

    Work w/o a permit work noted-installed struetural steel beams,framing work for drop ceilling new plumbing work & electrical work in progressin room #504 5th fl.50% work completed.all work in progress are w/out

    Nov 23, 2014 · Penalty $1,630

    Resolve
  • Class - 3

    Work w/o a permit work noted: @cellar level having erected full heightpartitions to create to additional rooms. plumbing & electrical work as well.noted: 90% of work done."partial stop work order @cellar level

    Aug 2, 2014

    Resolve
  • Class - 1

    Sec. 303.3. gas appliances and/or appurtenances installed in a prohibited location. observed the installation of a gas meter in the waiting area of the bus station located on the 1st flr. the meter is enclosed

    Jul 8, 2009

    Resolve
  • Class - 1

    Gas meter installed in an improper location. upon inspection for above application witnessed installation of meter in waiting area of bus station commercial space. rem: inform utility & relocate meter to proper

    Feb 5, 2009

    Resolve
  • Class - 2

    Altered/changed bldg occupied w/o a valid c of o as per 28-118.3.1 - 28-118.3.2. noted: altered bldg - (alt 1 #104539885) currently having occupied all fls (cellar to 5th fl) w/o a c of o. remedy: obtain valid

    Jan 7, 2009

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway. obstruction noted: bldg having in front of bldg. blocked swing balancing movement steps of fire escape stairs by erected metal framed awning for "happy store".

    Jan 6, 2009 · Penalty $1,200

    Resolve
  • Non-hazardous

    Work w/o a permit. work noted: at basement level demolished full height partitions, subpartitions, electrical wiring. note: work 100% is done. remedy: obtain permit or restore to prior legal condition.

    Dec 3, 2007 · Penalty $250

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by building department records- in that building has been converted into a school and day care center at the 2nd floor and offices from the 3rd to 5th floors contrary to

    May 12, 2006 · Penalty $800

    Resolve
  • Non-hazardous

    12b/ 49a/ 49b/ a9a no dischange pipe on saftey value 49b boiler surroundings congested and ddirty

    Jun 11, 2002 · Penalty $350

    Resolve
  • Non-hazardous

    Altered for occupancy as a dwelling for more than the approved number of families 2 floor room #3 arouded and accupied as a dwelling with 2 rooms with beds full kitchen and 3 pc barthroom with shower (clothing

    Mar 14, 2002 · Penalty $3,050

    Resolve
  • Non-hazardous

    Illegal & highly unsafe 33 bed sro hotel in room #5 2 floor. location altered for occupared as a dwelling for more than the legal number families. 2 floor room #5 aronald with 10 rooms 33 beds (1s per bed per n

    Mar 14, 2002 · Penalty $1,300

    Resolve
  • Hazardous

    15r12-50d6-22m06-73o02-57o02 15-basement door illegal-cease use until door is replaced and by possed door lock is repaired. 50 secure secure frayed cable inside drum.call 312-8737 when ready for service.

    Apr 6, 2001 · Penalty $500

    Resolve
  • Non-hazardous

    Flue pepe left in alley way exhausting hot gage in the fl area.it shall be installed as per bldg. code and the plans 2)handholes welded produced receipt of certified welder holding "r"stamp.also bring proof of

    Jun 16, 2000 · Penalty $180

    Resolve
  • Non-hazardous

    3a -49 - handholes bottom welded receipt by certified welder holding "r" stamp to produce 2 water column drain reduced 3 low water cut out manual reset switch nor connected.

    Jun 16, 2000 · Penalty $400

    Resolve
  • Non-hazardous

    49 -water column and blow down drains.reduced 2 large to fit with drain pipe 3 - handrails welded receipt from certified welder holding "r" stamp to produce 4 boiler not accessible for inspection on right side

    Jun 16, 2000 · Penalty $180

    Resolve
  • Non-hazardous

    Handhole welded recript from certified welder holding "r"stamp to produce 2)water column drain reduced 3)low water cut out manual reset switch in the boiler id fulton n.b. 30317yea 1974 panel box missing 4 drai

    Jun 16, 2000 · Penalty $350

    Resolve
  • Non-hazardous

    36 - 49 water column drain reduced.rt bottom handhole welded receipt by certified welder holding "r"stamp to produce (boiler not in use)

    Jun 16, 2000 · Penalty $500

    Resolve
  • Non-hazardous

    22d6,17i11,27q11,37l11,42l11,42q11,46u13,75o5. -22 secure top exit, -17 repair vision panel, -27 provide covers, -37 repair contacts, -42 repair machine limit cover, -46 hoist cables reshackle, -75 perform 5yr

    Oct 13, 1998

    Resolve
  • Hazardous

    19m7,46h12,48h12,49h12,22m12. -19 cease use till parking device is installed at first floor hoistway door, -46,48 & 49 replace all hoist ropes - excessive wear

    Sep 30, 1998 · Penalty $500

    Resolve
  • Non-hazardous

    50y, (74) repair car operating handle.

    Oct 13, 1995 · Penalty $200

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by bldg.dept.records.noted:basementbeing used as kniting factory dept records is storage with no means of egress.remedy;discontinue illegal use.

    Aug 11, 1995 · Penalty $800

    Resolve
  • Non-hazardous

    Work without apermit work noted: constructed a loft storage & office at 6th story storage space at west side of bld. remedy: obtain apermit if feasble or restore permises to prior legal condition

    Jul 26, 1994

    Resolve
  • Non-hazardous

    Failure to maintain building defect is broken steps on interior fire stairs between 2 & 3 floor. remedy: repair defective stair

    Jul 26, 1994

    Resolve
  • Hazardous

    Exit door: total obstruction. noted: interior fire stairs door at 2nd floor blocked with bar across door &partition with locked door erected around exit door. remedy: remove partition with door & other obstruct

    Jul 25, 1994 · Penalty $475

    Resolve
  • Hazardous

    Failure to file a report of compliance with local law 16/84 certifyingto the installation of required fire protection systems. remedy: file report.

    May 14, 1992 · Penalty $860

    Resolve
  • Non-hazardous

    08i,11q,14m,33i,53m,48t,49t,73o,17i. (#33) replace oeverhead door.

    Feb 21, 1991

    Resolve
  • Hazardous

    Failure to file a report of compliance with local law 16/84 certifyingto the installation of required fire protection systems. remedy-file report.

    Jan 28, 1991 · Penalty $345

    Resolve
  • Hazardous

    Flue pipe corroded.

    Dec 26, 1989

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Jul 9, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 20, 2016 · Apt 4C

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 31, 2015 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Office building (O5)
Year built
1900
Floors
6
Residential units
—
Building area
41,872 ft²
Lot area
7,500 ft²
Zoning
C6-1G
Community board
103
Council district
1
Block / lot
303 / 27
Assessed value
$5,200,650
Landmark / historic district
No

Questions about 55 Chrystie Street

Who owns 55 Chrystie Street?

The owner of record in NYC Department of City Planning PLUTO data is Lg Chrystie LLC.

Does 55 Chrystie Street have violations?

NYC HPD has no housing violations on record for this property.

Is 55 Chrystie Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 55 Chrystie Street built?

City records list 1900 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.