73 Canal Street
Manhattan, NY 10002BBL 1-00300-0029Map
Owner of record: M.y. Realty INC.
73 Canal Street is an office building built in 1900 in Manhattan, 10002. The owner of record is M.y. Realty INC.. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 37
- ECB violations
- 17
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 37
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 13, 2016
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2013
Dob violation - resolved
Show 27 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 19, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 2, 2009
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 30, 2008
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 28, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 11, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 29, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - active - Zoning none
Z-zoning none
Oct 24, 2003
Dob violation - active - Construction other optional
C-construction other optional
Oct 24, 2003
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 10, 2003
Dob violation - resolved - Emergency none
Egncy-emergency none
May 16, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Construction other optional
C-construction other optional
Dec 8, 1992
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 8, 1992
Vp-violation unserved ecb-active - Boiler boiler optional
B-boiler boiler optional
Jan 11, 1991
Dob violation - active - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - active - Boiler boiler optional
17b/32 gauge glass to be fitted with stop valve and drain pipe underneath
Dec 26, 1989
Vp-violation unserved ecb-active - Elevator elevatorrequired
51-remove illegal locks from hoistway doors 52-date & tag for 5yr safety test
Jan 13, 1989
Dob violation - resolved
ECB violations · 17
- Class - 2
Bc 3314.1 at time of inspection of a 7 stories building under facade repair, i observed supported scaffold installed on exposure # 1and 2 with torn,loosed and disconnected debri safety netting from the scaffold
Oct 31, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#900619.rem:submit acceptable required t
Apr 11, 2024 · Penalty $1,250
Resolve - Class - 2
02x10.02l10.037.05a1.11p16.10d6.17d6.40p16.70o2.02x alarm inoperative 02l 2wy communication 03m provide drop ceiling panel missing 05a adjust gate contact 11pno access to b2.3.5.7 fls 10d car gibs loose 17dh do
Apr 21, 2009 · Penalty $250
Resolve - Non-hazardous
Failure to maintain comply with the commissioners order t ofile a certificate of correction with the dept of building for violations #34409344z.remedy:file certificate of correction.
Feb 6, 2004
Resolve - Hazardous
1)full 2nd flr is occupied as adult physical culture establishment where cross gender body massage was observed by unlicensed therapist. 2)full partition walls have been erected on 2nd flr creating a massage
Oct 24, 2003
Resolve - Non-hazardous
Occupancy contrary to that allowed under approved alteration #102825089 in that office use has been convert to a skin and barber care contrary to bldg department records.remedy:discontinue use or obtain a cofo
Sep 9, 2003 · Penalty $2,500
Active - Non-hazardous
Emergency exit lighting does not meet the requirements of the commissioner.9bureau of electrical control (bec) certification of inspection required). emergency exit/directioanl signs do not meet the requirement
Sep 20, 2001 · Penalty $2,000
Resolve - Non-hazardous
Emergency exit lighting does not meet the requirements of the commisioner.(bureau of electrical control(bec)certification of inspection required).emergency exit/directional signs do not meet the requirement of
Apr 23, 2001 · Penalty $2,000
Resolve - Non-hazardous
Failure to file a report of compliance with legal-law 16/84 certifyingto the installation of required fire protection systems.remedy:file report.
Jul 31, 2000 · Penalty $400
Resolve - Hazardous
49 - water column drain reduced 2 highly flamable card board are stacked and hung near the boiler (fire hazard)3. lt side of boiler not accessible for inspection due to cardboards.
Jun 13, 2000 · Penalty $400
Active
Show 7 more ↓
- Hazardous
49 36 51 (1) water column drain reduced (2) highly flamable card board and wood working benehes stacked too close to the boile almost touching it (fire hazard).bq9(27-147) operating boiler without equipment use
Jun 13, 2000 · Penalty $2,500
Active - Non-hazardous
Failure to provide emergency power exit light on all tenant floors and main staircase failure to provide adequate exit/directional signs on tenat floors failure to provide emergency power to exit signs on tenan
May 22, 2000
Active - Non-hazardous
Failure to maintain exterior building wall. defect is approx 35'x1' south coverng steel girder at third story south east missing and on sidewalk below. remianing stucco apperas cracked and defective. remedy
May 11, 2000 · Penalty $800
Resolve - Hazardous
Failure to maintain bldg exterior. noted: at roof level missing brickwork at west side chimney top w/ cracked & separating masonry stone ontop & center chimney leaning inward, out of plumb corner, broken skyli
Oct 6, 1998 · Penalty $800
Resolve - Non-hazardous
35p,35 provide access to machine room.
Dec 5, 1991 · Penalty $75
Active - Non-hazardous
17(b),32,feed nipple corroded to replace (b)gage glass to be fitted with stop valve and drain pipe.
Dec 4, 1991 · Penalty $85
Active - Non-hazardous
17b,46a,46b,32. nipple in the feed line leaking. 2) boiler area restricted with worring tables and other materials thus sending boiler un- accessible for inspection. the same shall be cleared of all such mate
Jan 11, 1991 · Penalty $250
Active
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O9)
- Year built
- 1900
- Floors
- 7
- Residential units
- —
- Building area
- 11,470 ft²
- Lot area
- 1,688 ft²
- Zoning
- C6-1G
- Community board
- 103
- Council district
- 1
- Block / lot
- 300 / 29
- Assessed value
- $1,190,700
- Landmark / historic district
- No
Questions about 73 Canal Street
Who owns 73 Canal Street?
The owner of record in NYC Department of City Planning PLUTO data is M.y. Realty INC..
Does 73 Canal Street have violations?
NYC HPD has no housing violations on record for this property.
Is 73 Canal Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 73 Canal Street built?
City records list 1900 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.