5 Allen Street
Manhattan, NY 10002BBL 1-00293-0019Map
Owner of record: Richland Holding LLC
5 Allen Street is a hotel built in 2008 in Manhattan, 10002. The owner of record is Richland Holding LLC. HPD has recorded 14 housing violations here, most recently on April 17, 2024. 1 of the 14 most recent violations are still open.
- HPD violations
- 14
- DOB violations
- 16
- ECB violations
- 55
- HPD complaints
- 3
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jan 28, 2021
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jan 28, 2021
Open — Nov certified late - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 28, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jan 28, 2021
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jan 28, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 28, 2021
Closed — Violation dismissed
Show 4 more ↓
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jan 28, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 28, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 11, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 30, 2016
Closed — Violation dismissed
DOB building violations · 16
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 24, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 25, 2013
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Construction other optional
Installed passenger elevator @ rear
Oct 22, 2011
Vpw*-violation unserved ecb-work without permit-dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed
Show 6 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Construction other optional
Work does not conform to approved construction docs. and amendments at rear of exp. 2 & 4. plans call for timber laggin at foundation wall rear which has not been installed during foundation wall installation remedy: stop all work amend plans. contact excavation for rescind
Jul 28, 2009
Dob violation - dismissed - Construction other optional
Work does not conform to approved constr. docs. at ime of inspection work ongoing under permit underpinnigs in progress and no box pits pro vided at open pin contrary to approved plans remedy: stop all work. conform to approved docs. call eu for reinsp ection
Jun 15, 2009
Dob violation - dismissed - Construction other optional
Stop all work failure to provide accepted plans at job site at time of inspection noted: work un going under permit #110132240nb and plans at job site inadequate no details for up and existing condition at exp 1 2 3 & 4 are not shown on plans for soe no elevations dimensions remedy: stop all work provide/amend plans call excavation unit at
Mar 17, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 11, 2009
Dob violation - dismissed
ECB violations · 55
- Class - 2
Failure to submit an acceptable required cycle 8c and 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #918445. remedy: submit acceptab
Apr 8, 2025 · Penalty $2,500
Active - Class - 2
Hot water heaters on 12th floor/#1hwh+#2hwh vent pipes are leaking;ýventing must be built to hwh manufactures spec.+nyc fuel gas code¨/#3hwh+#2hwh safety discharge pipes are reduced/condensate drains not built
Sep 21, 2021 · Penalty $625
Resolve - Class - 1
I observed in the rear of the building at the basement level the emergency generator without proper access due to metal and glass frame wall blocking the access panels on the generator from opening. the space d
Sep 3, 2021
Resolve - Class - 2
Work without a permit.i observed on roof plumbing and also gas piping installed to 3 water heater.no permits on file for the installation atthe dob.also no permits on file for gas piping to equipment located in
Sep 3, 2021
Resolve - Class - 2
I observed at the 12 fl hot water heater room no remote shut-down for the gas fired systems located inside. as per mc 1006.8.1 all fuel burning systems are required to have a remote shutdown outside of the poin
Sep 3, 2021
Resolve - Class - 2
I observed on the 12 floor in the hot water heater room the installation of conduits, junction boxes, bx cables, and switches to supply power to newly installed hot water heaters. no active or previous permits
Sep 3, 2021
Resolve - Class - 2
I observed in the basement utility room at the entrance the installation of plastic molded raceway with exposed energized conductors supplying power to a gfci outlet on the opposite side of the door. the use of
Sep 3, 2021
Resolve - Class - 3
Failure to maintain building in code compliant manner. observed at exit stair "c" that leads to the street, at the top of the stairs and at the base of the stairs the roof leaders are incorrectly terminated
Sep 25, 2018 · Penalty $500
Resolve - Class - 2
Failure to maintain building in code compliant manner. observed in cellar in the gas meter three feet of the gas meter. flammable material cannot be located within three feet of the gas meter.photo taken.
Sep 25, 2018 · Penalty $655
Resolve - Class - 2
Failure to maintain building wall(s) or appurtenances noted:observed at front (exp#1) left side of entrance above stair "c" exterior exit stairs-glass roof has several glass panes that are cracked/broken and
Sep 25, 2018 · Penalty $625
Resolve
Show 40 more ↓
- Class - 2
Failure to maintain building in code-compliant manner (interior).notedobserved water penetrating into the elevator machine room on the 12th floor from exterio rwall, also water penetrating into fire pump room
Sep 25, 2018 · Penalty $655
Resolve - Class - 2
Failure to maintain building in code-compliant manner. observed on 03/08/2018 at above address excessive storage in gas meter room. cleaning products, shelving and towels. rem: repair and/or replace. *photos ta
Mar 8, 2018
Resolve - Class - 2
Failure to maintain building in code-compliant manner. observed on 03/08/2018 at above address no fresh air ventilation in the gas meter room. rem: repair and/or replace.
Mar 8, 2018
Resolve - Class - 2
Failure to install ground fault circuit interrupter(gfci) protection as required. observed the following violating condition in the water heater room located on the 12th floor. receptacle next to sink not gfci
Mar 8, 2018 · Penalty $1,200
Resolve - Class - 2
Job site fence not constructed pursuant to subsection. upon inspectionas noted the fence on exposure #1 (allen st) is approx 1-1 1/2ft out of plumb & upon applying presure swings approx 30(ins) of plumb fence
Oct 29, 2011
Resolve - Class - 2
Partial stop work order issued pursuant to 28-207.2 & posted at premises failure to safeguard all persons & property affected by construction operations - at time of inspection,observed hoist at 12# floor deck
May 11, 2011 · Penalty $1,200
Resolve - Class - 2
Work w/o a permit: expired permit. as noted: at time of inspection at above active construction site observed plumbing workers were working on 8th flr while plumbing permit expired on 9.9.10 & as per dob record
Apr 13, 2011
Resolve - Class - 1
Failure to institute maintain safety equipment measures or temporary construction no handrails as noted at time of insp at above active construction site observed no handrails provided on stairwell from 11 fl t
Apr 4, 2011 · Penalty $1,000
Resolve - Class - 1
Failure to institute maintain safety equipment measures or temporary construction no guardrails as noted at time of insp at above active construction site observed no guard rails provided on 12 floor by stairwe
Apr 4, 2011 · Penalty $1,200
Resolve - Class - 2
Sec. 3301.2 holes/openings not covered noted: at above mention active job site observed at time of inspection not covered openings from 2nd fl to 6th fl. remedy: provide covers for holes/openings as required.
Feb 10, 2011
Resolve - Class - 2
Sec. 28-103.8 matters not provided for - at above mention job site observed design shop drawings for overhead protection (at backyard - cellar) level not conforming to site conditions with 4 x 4 support posts
Feb 10, 2011
Resolve - Class - 2
Work w/o a permit. expired sidewalk shed permit #1203032060n 1/1/11. remedy: renew sidewalk shed permit #120303206 as required.
Feb 10, 2011 · Penalty $4,000
Resolve - Class - 1
Failure to safeguard public/property affected by construction operations. noted: defects at adjacent property (7 allen st) to north of (5 allen st) at rear exposure #3 rear facade stress cracks at foundation &
Jan 25, 2011
Resolve - Class - 1
Fail to safety public/property affected by const operations. noted: new bldg under application 110132240 has affected 7 allen st by protecting roof with 1 1/4" hard foam plywood & 2" thick lumber planks & plast
Oct 16, 2010 · Penalty $2,400
Resolve - Class - 2
Sec. 33108.3. failure to comply rules promulgated by the commissioner - site safety rule. as noted: at time of inspection at above active construction site installation & stairwell in progress. observed that
Sep 13, 2010
Resolve - Class - 2
Sec. 3301.2 failure to provide adequate means of egress. as noted: at time of inspection at above active construction site observed there isno adequate means of egress provided from 7th flr to 8th flr. remedy:
Sep 13, 2010
Resolve - Class - 1
Sec. 28-407.1. failure to provide welder license as required. as noted: at time of inspection at above active construction site observed worker was welding metal stairwell into structural member on 7 flr upon
Sep 13, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to sfaeguard all persons & property affected by const operations noted @ time of inspection new forming 8th fl slab on 5th fl exp 2 & 4 adjoining propertys windows not protected remedy: safeguard public
Aug 23, 2010 · Penalty $2,400
Resolve - Class - 1
Failure to institute maintain safety equipment measures or temp const no guard rails noted @ time of inspection guardrails missing elevation shaft on 5 & 6 flrs remedy: provide guard rails
Aug 23, 2010 · Penalty $2,400
Resolve - Class - 1
Bc28-105.12.8 plans site safety non conforming noted workers forming 8th fl slab adjoining property protection not as per site safety plan plan calls for overhead protection rear yard 5 allen st & rear yard sou
Aug 23, 2010 · Penalty $1,600
Resolve - Class - 1
Storage of material during construction as noted: at time of inspection on a active construction site, concrete building up to 6 stories on floor # 4 & 5 at exposure # 1 & 3, material is stored with-in 5 ft fro
Jun 28, 2010
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction (no guard rails). noted: at time of inspection on active job site w/masonry wall installation in operation. observed on 2nd,4th
May 26, 2010 · Penalty $1,200
Resolve - Class - 1
Sec. 3308.3. vertical safety netting requirements. noted at time of inspection on active job site w/masonry block walls in operation. observed on the following flrs 2,3,5 & 6th flr. vertical netting not fully
May 26, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction (no toe boards) noted at time of inspection on active jobsite w/masonry block work in operation. observed 6 sty new bldg w/o
May 26, 2010 · Penalty $1,000
Resolve - Class - 2
Sec. 3303.4.5.1. storage of material during construction - (housekeeping) noted at time of inspection on active job site w/cmu block wall being erected. observed on both the 2nd & 3rd flr on exps (1,2,3,4)
May 26, 2010
Resolve - Class - 1
Sec. bc 3308.3 vertical safety netting requirements. noted: at time of inspection on active job site with forming & stripping work in operation. observed on all levels 2nd up to 5th flr perimeter safety netting
May 13, 2010 · Penalty $1,600
Resolve - Class - 1
(misc)bc3309.1failure to protect adjoining sstructure @ time of inspection observed 5th flr pouring in progress.the form work & guardrails are nailed on adjacent structure on 3rd,4th & 5th flr.this condition da
Apr 30, 2010 · Penalty $1,600
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations at time of inspection 4t hfl form work in progress from 3-4 flr ladder is not secured from a displacement the landing is at right
Apr 22, 2010 · Penalty $1,200
Resolve - Class - 2
Work does not conform to approved site safety plan. as per site safetyplan no over head protection has been provided for the open front yard area. remedy: conform to approved site safety plan.
Apr 5, 2010
Resolve - Class - 1
Failure to safeguard all person & property affected by construction operation as noted: at time of inspection on a active construction site,concrete operation in progress,workers are erecting rebar for wall
Feb 2, 2010 · Penalty $2,400
Resolve - Class - 1
3310.3(misc)fail to have site safety plan on site @ the time of my insp approx 6 wrking on request for site safety plans no plan was provided.rem:comply with notice of violation, provide plaans on site.
Dec 29, 2009 · Penalty $1,600
Resolve - Class - 2
Sec 1905.6.3.2 misc viol: fail to remove cylinders stored for a periodup to 48 hrs. as noted: at time of insp on a active const site, cylindders for strength test was molded on 8/21/09 by impact concrete & cont
Sep 16, 2009 · Penalty $800
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. noted: at time of inspection at above active site (chopping) out existing cellar in progress. observed there is no site safety plan
Sep 3, 2009
Resolve - Class - 1
Bc3304.4.4 27-1032b stop all work failure misc violations to provide 3ft 6in guard rail or solid enclosure around open and accessible sides of excavation noted at time of insp up in progress along exp 4 excavat
Jun 15, 2009 · Penalty $1,600
Resolve - Class - 1
Bc3304.4.5 27-1032c stop all work misc violations excavated equipment placed too close to edge of unbraced excavation noted at time of insp up ongoing along exp 4 and excavator machine placed at edge of excavat
Jun 15, 2009
Resolve - Class - 1
Bc3304.7 26-229a stop all work misc violations failure to provides adequate means of exit from excavation noted at time of insp up in progress along exp and no job #110132240 a sheer cut approx 8 to 10ft respon
Jun 15, 2009 · Penalty $1,600
Resolve - Class - 1
Bc1803.1 27-1032 stop all work misc violations failure to protect an adjoining footing or foundation affected by excavation operations notedat time of insp work on going under permit #110132240 nb up in progres
Jun 15, 2009
Resolve - Class - 2
Failure to safeguard all persons and property- affected by construction operation-upon inspection noted no smoking signs not provided withinconstruction site adequately. rem: provide no smoking sign.
Jun 15, 2009
Resolve - Class - 1
Failure to maintain protection at sides of excavation upon inspection noted approx 20' x 8' and 10 ft deep hole excavated for underpinning the foundation of adjoining building on 7 allen st. the sides of the ho
Jun 15, 2009 · Penalty $12,000
Resolve - Class - 1
Failure to safeguard all persons and property affected by construction operation- upon inspection noted approx 20' x8' and 10ft deep hole excavated for underpinning the foundation of adjoining building and a pi
Jun 15, 2009 · Penalty $2,400
Resolve
Complaints
- Heat/hot water
Entire building
Jan 26, 2021 · Apt 502
Close - Heat/hot water
Apartment only
Nov 17, 2018 · Apt 401
Close - Heat/hot water
Entire building
Dec 5, 2017 · Apt 902
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H3)
- Year built
- 2008
- Floors
- 12
- Residential units
- —
- Building area
- 13,104 ft²
- Lot area
- 2,188 ft²
- Zoning
- C6-1G
- Community board
- 103
- Council district
- 1
- Block / lot
- 293 / 19
- Assessed value
- $3,342,150
- Landmark / historic district
- No
HPD registration #144128, last renewed Jul 7, 2025.
Questions about 5 Allen Street
Who owns 5 Allen Street?
The owner of record in NYC Department of City Planning PLUTO data is Richland Holding LLC.
Does 5 Allen Street have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 5 Allen Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 5 Allen Street built?
City records list 2008 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.