235 East Broadway
Manhattan, NY 10002BBL 1-00286-0033Map
Owner of record: E8 NYC Holdings LLC
235 East Broadway is a public assembly built in 1900 in Manhattan, 10002. The owner of record is E8 NYC Holdings LLC. HPD has recorded 1 housing violation here, most recently on June 4, 2020. 1 of the 1 most recent violations are still open.
- HPD violations
- 1
- DOB violations
- 7
- ECB violations
- 11
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at front entrance to basement
Jun 4, 2020
Open — Nov sent out
DOB building violations · 7
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 11, 2022
Dob violation - active - Immediate emergency anythingoptional
Erect approximately 35 linear feet of sidewalk shed at exposure #1 to safeguard the public and propoerty
Feb 18, 2022
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed
ECB violations · 11
- Class - 1
Excessive demolition debris and construction materials were observed on the 1st floor of site. observed construction materials through the work area, obstructing egress creating unclear walking paths for worker
Sep 22, 2026 · Penalty $2,500
Active - Class - 1
. observed work being performed by individuals on site who failed to demonstrate an active sst card, while other individuals presented expired sst card . construction superintendent must ensure that workers on
Sep 22, 2026 · Penalty $5,000
Active - Class - 1
Observed required documents pertaining to ongoing operations were not provided such as( site safety plan, structural drawings, sidewalk shed, sws letter of completion, design drawings for temp platforms) the ab
Sep 22, 2026 · Penalty $2,500
Active - Class - 1
. observed pre shift meeting documentations were inadequate and did not identify or documents potential site hazards to be communicated to workers prior to commencing work.. stop all work under application 1212
Sep 22, 2026 · Penalty $5,000
Active - Class - 1
Observed multiple deficiencies during course of inspection. cs matthew wai-chu lee cs#(0030629) failed to keep adequate housekeeping, required construction documents were not provided, cs also failed to ensure
Sep 22, 2026 · Penalty $10,000
Active - Class - 1
At time of inspection, observed approx. 3' x 3' section of cement stucco missing at 3rd-floor window at exposure 1, with surrounding stucco cracked and loose. also observed entire front facade cement stucco in
Dec 2, 2025 · Penalty $2,500
Active - Class - 2
At time of inspection i observed a sidewalk shed installed at expo#1 no information panel on the parapet of the shed. a required sidewalk shed parapet information panels shall be in place throughout the durati
Sep 5, 2024 · Penalty $1,250
Resolve - Class - 2
At the time of inspection observed underside of the sidewalk shed was not illuminated as required by code-bc.3307.6.4.8.this creates hazardous conditions for pedestrans as they walk underneath: slipping, trippi
Sep 5, 2024 · Penalty $2,400
Resolve - Class - 2
At the time of inspection 4-story unoccupied building observed construction equipment installed at exposure 1. construction fence 8 ft aprox 20 ft long encroaching the sidewalk. upon reviewing the department r
Sep 3, 2024
Resolve - Class - 1
At time of inspection observed approx. 3'-0" x 3'-0" section of cement stucco missing on 3rd floor level by the window and around that missing section stucco crack & loose t expo # 01. also observed entire fron
Feb 17, 2022 · Penalty $1,250
Active
Show 1 more ↓
- Non-hazardous
B4a/50a/50a-holes on the ceiling above the oil tank
May 17, 2005 · Penalty $180
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Aug 17, 2019 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Public assembly (P5)
- Year built
- 1900
- Floors
- 4
- Residential units
- —
- Building area
- 5,540 ft²
- Lot area
- 2,071 ft²
- Zoning
- R7-2
- Community board
- 103
- Council district
- 1
- Block / lot
- 286 / 33
- Assessed value
- $429,300
- Landmark / historic district
- No
Questions about 235 East Broadway
Who owns 235 East Broadway?
The owner of record in NYC Department of City Planning PLUTO data is E8 NYC Holdings LLC.
Does 235 East Broadway have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 235 East Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 235 East Broadway built?
City records list 1900 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.