47 Division Street
Manhattan, NY 10002BBL 1-00281-0041Map
Owner of record: C K D Division Realty
47 Division Street is a store building built in 1920 in Manhattan, 10002. The owner of record is C K D Division Realty. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 66
- ECB violations
- 58
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 66
- Construction other optional
Failure to maintain building in code compliant manner. observed defected conditions: exposure 1: crack stucco at 3fl at area of window lintel. exposure 4: crack window pane at the 6fl and spalling at the parapet. remedy: repair and/or replace
Jan 29, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner.as noted,i obser ved at the time of my inspection,cracks and spalling stucco/masonry at 3rd fl spandrels on exp1 west elev.also at exp# west elev,i observed i on the 8th fl lintel cracks at lintel sealant joint.exp4 south elev cr ack in mortar joint at parapet sw end of elev.repair and/or replace
Aug 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - active
Show 40 more ↓
- High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - active - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - active - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 17, 2019
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Jun 10, 2018
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Jun 1, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2017
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 20, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 27, 2015
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2013
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 1, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 23, 2008
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 12, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active
ECB violations · 58
- Class - 2
At time of inspection observed 7 story building with sidewalk shed installed at exp #1 upon reviewing of bis and dobnow system revealed temporary construction equipment on site permit m00695947-i1-sh expired 0
Apr 21, 2026 · Penalty $6,250
Active - Class - 2
Failure to file acceptable amended cycle 7c and 8c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #800600. agg2 history of noncompliance o
Apr 20, 2026 · Penalty $10,000
Active - Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #900600. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $10,000
Active - Class - 2
Failure to maintain exterior building facade and appurtenances.noted:observed there are cracks at multiple location at exp 1(n.elev)and a spalling decorative stone at parapet level.also observed at exp 4(w.elev
Sep 16, 2024 · Penalty $1,250
Active - Class - 2
Failure to file acceptable amended cycle 7c and 8c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#800600.agg1:prior nov 37022169n under 28
Jan 16, 2024 · Penalty $3,125
Active - Class - 2
Failure to file acceptable amended cycle 7c & 8c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#800600. remedy: file acceptable report.
Oct 8, 2021 · Penalty $1,280
Active - Class - 2
Failure to file acceptable amended cycle 8c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control # 800600. remedy: file acceptable report.
Aug 1, 2018
Resolve - Class - 1
Reissue #35248521m date of issue 02-01-2018.failure to maintain building in code compliant manner observed at the time of inspection at expo#1 the property at division street trading inc.store the fire escape s
Mar 16, 2018
Resolve - Class - 2
Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #700600. agg2 history of noncompliance on 3602353
Mar 7, 2018 · Penalty $1,250
Active - Class - 1
Failure to maintain building in code compliant manner.noted:observed at time of inspection at expo#1 of the property at division street trading inc.store the fire escape steel ladder from cellar to opening at s
Feb 1, 2018 · Penalty $1,250
Resolve
Show 40 more ↓
- Class - 2
Failure to maintain exterior building north elev.exp1-wood on window (2x4)remedy:maintain exterior building provide safety measures repair/store damaged facade.file report 1-rcny 103-04.
Dec 2, 2016
Resolve - Class - 2
Failure to maintain exterior bldg north elev exp1 coping chippers at parapet 7 flr header evidece of rusting 4 floor wood on window sill. west elev. exp4 top floor a/c unit missing bracket-window door rusting
Jun 30, 2016 · Penalty $500
Active - Class - 2
Failure to file an acceptable technical report in compliance w/code provisions:36026711x.periodic insp of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.rem:file the
Nov 2, 2015 · Penalty $8,000
Active - Class - 2
Failure to maintain exterior bldg. south elevation exp#1 vertical cracks in masonary 4th & 7th fl. requires facade repair. the terracotta window ledges over 4th fl cracked & also decorative stone are cracked
Sep 2, 2015 · Penalty $500
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Dec 12, 2014 · Penalty $4,000
Active - Class - 1
Failure to comply w/the comm's order contained in nov#34844039z issued on 04/24/2010.for work w/o permit.remedy:compoly w/the comm's order.
Oct 27, 2011 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/ the comm order contained in nov#34844039z issued on 4/24/10 work w/o permit rem: comply w/ the comm order
Aug 16, 2011 · Penalty $2,400
Resolve - Class - 1
Unlawful acts failure to comply with an order of the comm'ssioner respondent failed to correct the violating conditions cited on prior ecb nov34844039z&34900214k for work w/o permit 1.penetrate common wall to c
Jun 1, 2011 · Penalty $2,400
Resolve - Class - 2
Failure to comply w/ the commissioner's order to file a certificate ofcorrection w/ the d.o.b. noted : respondent failed to comply w/ the commissioner's order to correct the violating conditions & file a certif
Mar 2, 2011 · Penalty $800
Resolve - Class - 1
Unlawful acts. failure to comply w/an order of the commissioner. noted: respondent failed to comply w/the commissioner's order to correct the conditions cited in the prior nov #34844039z. common wall between 47
Mar 1, 2011 · Penalty $6,000
Resolve - Class - 1
Unlawful acts.failure to comply with an order of the commissionerresp ondent failed to correct the conditions cited prior nov 34844039z penetrated common wall between 47 & 49 division st on floors 1 and 2. no p
Oct 20, 2010 · Penalty $24,000
Resolve - Class - 1
Failure to comply w/an order of the commissioner. respondent failed tocorrect the conditions noted in prior nov #34844039z penetrating common wall between 47 and 49 division street on 1st and 2nd flrs. no pmts
Aug 23, 2010 · Penalty $2,400
Resolve - Class - 1
Work w/o a permit:illegal work noted:@ 1st & 2nd flrs 1-having penetrated common wall to connect to #49 bldg to north east @ both 1st & 2nd fls @ 2nd fl # 2 having erected full height partitions to create bedro
Apr 24, 2010 · Penalty $8,000
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 and the dob rules and regulations
Nov 21, 2008 · Penalty $800
Active - Non-hazardous
18a,b,50.fulton v.t. boiler,10hp,nb 32936,gas 1977.18a,b-scale accumulation active corrosion & evidence of leakage at manholes.de-scale,cle an & re-gasket openings.50-corroded sleeves at manhole compartment.
Mar 1, 2008
Resolve - Non-hazardous
Work w/o a permit noted 3 rooms have been erected at the front area at the 2nd fl w/o dob approvals permits remedy: obtain all approvals and permits or restore to prior legal condition
Jan 10, 2008 · Penalty $250
Resolve - Non-hazardous
Occupancy contrary to dob records noted 3 rooms have been erected at the front of the 2nd fl and are beingused as illegal sro with beds remedy: discontinue illegal use forthwith
Jan 10, 2008 · Penalty $800
Resolve - Hazardous
Exit passage or corridor required width decreased by obstruction on 2nd fl in rear of premises exposure number 3 passagewat from room to fire escape blocked by cloth bags metal gate partially blocked the window
Dec 21, 2007
Resolve - Hazardous
B4a/16/34b/32a/50/a. 50-holes in boiler room ceiling.50a-storage & debris in boiler room.
Nov 6, 2006
Resolve - Non-hazardous
50a,18ab/50b fulton v.t. boiler, 10hp nb29074 gas1973 50a-corrosion on blowdown piping sys perform repair&replace valves.50b-corrosion on feed water inles piping sys near boiler. perform repairs & replace.
Jul 24, 2006
Resolve - Non-hazardous
50a/50c/50b/18ab/48b/50d/fulton vt boiler 10hp,nb 24195,gas 1971/50a-screw threads @ the outlet end of the safety/50b-water column drain valves defective replace/50c-corrosion on feed water inlet line @ boiler
Jul 24, 2006
Resolve - Non-hazardous
50a/50b/18ab/fulton v.t. boiler,10 hp, nb 32936 gas 1977/50a-safety valve discharge pipe system reduced reduction elbow installed on the system remove intermediate elbow & install full sized tail pipe
Jul 24, 2006
Resolve - Non-hazardous
50a/50b/fulton vt boiler 10hp,nb 72093 gas 1995/50a-inadequate structural support of the boiler's loaded flue pipe system install a heavy duty hanger connected to the boiler room ceiling/50b-boiler room dirty
Jul 24, 2006
Resolve - Non-hazardous
50a,50b,18ab.fulton v.t. boiler, 10 hp,nb47613,gas,1983.50a-no enclosure for high press. steam boiler.construct a fire rated boiler room for the fired unit.50b-no structural support for the flue pipe system and
Aug 31, 2004
Resolve - Non-hazardous
18ab,50a,50b.fulton v.t. boiler,10 hp,nb 29074,gas 1973.50a-no enclosure provided for high pressure steam boiler.construct a fire-rated boiler room for the unit.50b-no discharge pipe on the safety valve.
Aug 31, 2004
Resolve - Non-hazardous
50a,50b,50c.fulton v.t. boiler,10 hp,nb24195,gas,1971.50a-incomplete enclosure for high pressure steam boiler.provide a complete fire-rated boiler room for the unit.50b-no discharge pipe on the safety valve.50c
Aug 31, 2004
Resolve - Non-hazardous
50a,50b,50c,44c.fulton v.t. boiler,10 hp, nb 32936,gas,1977.50a-incomplete enclosure for high pressure steam boiler.provide a complete fire rated boiler room for the unit.50b-no structural support for the flue
Aug 31, 2004
Resolve - Non-hazardous
50a,50b.fulton v.t. boiler,10 hp,nb 72093,gas 1995.50a-no enclosure for high pressure steam boiler.construct a fire-rated room for the unit.50b-no structural support for the flue pipe system.install a heavy dut
Aug 31, 2004
Resolve - Hazardous
Cease use 67d06/85bb05/01b01/44o02/34d06/57e01/41l10/39o02/25w06 67 dog rear rails loose completly off seperated from wall cease use -repairrials before returning to service call dept of building 57e01 during
Jul 14, 2003 · Penalty $500
Resolve - Non-hazardous
83o02,01l10,03i10,05i10,31h10,38i10,33r10,51b12,53b12 83-o-02 clean entire device removed old cables and debris from motar room/01-l-10 repair stops switch so alarm rings /03-i-10 repair hole in platfrom right
Jun 16, 2003 · Penalty $180
Resolve - Non-hazardous
48(a)(b),50(a)50(d)50(b)50(c)50(e). 50(a) corroded blow down valve. replace with (1st) quick (2nd) slow type. 50(b) no discharge pipe on the safety valve. 50c) flue pipe not supported. hanger to ceiling require
Apr 14, 2003
Resolve - Non-hazardous
18(a)(b),50(a),50(c),11(b)50(b). 11(b) blow down line/ valve corroded. replace with 1st quick and 2nd valve slow type. 50(a) steam stop valve non-code type 600 wog. replace. 50(b) non discharge pipe on the safe
Apr 14, 2003
Resolve - Non-hazardous
B4a-25a-25b-36-50-bq9. peep hole glass missing install pig tail on steam gauge no rating plate boiler fackets missing.
Mar 20, 2003 · Penalty $180
Active - Non-hazardous
73o02/57o02/62d06/45b07/35o02/37b29/28h12. 73 clean down shaft and car top. 62 secure all wires provide all covers. 45 straingten rod clean a path to drim. remove old cables.remove paper from contacts.
Sep 24, 2002
Resolve - Non-hazardous
Work without apermit(100% of work completed)noted:new glass and metal frame store front installed.loc:1fl comm.space.d.b.a china restaurant supply,inc.rem:obtain permit and approvals from dept of bldgs.
Feb 1, 2001 · Penalty $500
Active - Non-hazardous
48a/48b/49 49)reconnect low water cutoff manual reset condition to boiler.
Jul 11, 2000
Resolve - Non-hazardous
Use of prohibited door. noted: at public hallway entrance/exits from various spaces with roll down shutters installed. use of illegal hard-ware. noted: at public hallway entrance/exit doors from space & to
Feb 24, 1999 · Penalty $350
Active - Hazardous
Work without a permit.work noted:constructed office.sheetrock on wood stud at 2nd floor north west front section of bldg.approx.10x9.2-fire passage door adjacent to new office is obstructed & will not closed.3-
Apr 26, 1995 · Penalty $800
Resolve - Hazardous
Failure to maintain building defect is fire proof self closing door at 2nd floor interior stair is hung on rotted fram,top hing is pulling away door not rated as per code 7 will not close hardware will not enga
Apr 26, 1995 · Penalty $2,000
Active - Hazardous
Faiddlure to maintain: defect is: fire proof self closing door at 2nd floor interior stair is hung on one hinge other hinge has rotted away & self closing hardware's not working. remedy:make safe immediately
Jan 18, 1994 · Penalty $800
Active
Complaints
- Plumbing
Water supply
Mar 28, 2019 · Apt 7AB
Close - Plumbing
Water supply
Mar 28, 2019 · Apt 7AB
Close - Plumbing
Water supply
Mar 28, 2019 · Apt 7AB
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1920
- Floors
- 7
- Residential units
- —
- Building area
- 11,635 ft²
- Lot area
- 1,726 ft²
- Zoning
- C6-1G
- Community board
- 103
- Council district
- 1
- Block / lot
- 281 / 41
- Assessed value
- $798,750
- Landmark / historic district
- No
Questions about 47 Division Street
Who owns 47 Division Street?
The owner of record in NYC Department of City Planning PLUTO data is C K D Division Realty.
Does 47 Division Street have violations?
NYC HPD has no housing violations on record for this property.
Is 47 Division Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 47 Division Street built?
City records list 1920 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.