47 Division Street is a store building built in 1920 in Manhattan, 10002. The owner of record is C K D Division Realty. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
66
ECB violations
58
HPD complaints
3

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 66

  • Construction other optional

    Failure to maintain building in code compliant manner. observed defected conditions: exposure 1: crack stucco at 3fl at area of window lintel. exposure 4: crack window pane at the 6fl and spalling at the parapet. remedy: repair and/or replace

    Jan 29, 2026

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner.as noted,i obser ved at the time of my inspection,cracks and spalling stucco/masonry at 3rd fl spandrels on exp1 west elev.also at exp# west elev,i observed i on the 8th fl lintel cracks at lintel sealant joint.exp4 south elev cr ack in mortar joint at parapet sw end of elev.repair and/or replace

    Aug 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 external hgh pressure inspection

    Sep 23, 2024

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 internal hgh pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
Show 40 more ↓
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 external hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 external hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 internal high pressure inspection

    Apr 25, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 external high pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Residential elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Dec 17, 2021

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued - failure to file 2017 external high pressure boiler inspection

    Mar 16, 2020

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued - failure to file 2017 internal high pressure boiler inspection

    Mar 16, 2020

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 17, 2019

    Dob violation - active
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Jun 10, 2018

    Dob violation - active
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Jun 1, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 24, 2017

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 20, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 27, 2015

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 27, 2013

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2010 inspection/test

    Dec 13, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 13, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 2, 2010

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 1, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 3, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 23, 2008

    Dob violation - resolved
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 12, 2007

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 17, 2005

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 28, 2004

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active

ECB violations · 58

  • Class - 2

    At time of inspection observed 7 story building with sidewalk shed installed at exp #1 upon reviewing of bis and dobnow system revealed temporary construction equipment on site permit m00695947-i1-sh expired 0

    Apr 21, 2026 · Penalty $6,250

    Active
  • Class - 2

    Failure to file acceptable amended cycle 7c and 8c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #800600. agg2 history of noncompliance o

    Apr 20, 2026 · Penalty $10,000

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #900600. remedy: submit acceptable requ

    Apr 8, 2025 · Penalty $10,000

    Active
  • Class - 2

    Failure to maintain exterior building facade and appurtenances.noted:observed there are cracks at multiple location at exp 1(n.elev)and a spalling decorative stone at parapet level.also observed at exp 4(w.elev

    Sep 16, 2024 · Penalty $1,250

    Active
  • Class - 2

    Failure to file acceptable amended cycle 7c and 8c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#800600.agg1:prior nov 37022169n under 28

    Jan 16, 2024 · Penalty $3,125

    Active
  • Class - 2

    Failure to file acceptable amended cycle 7c & 8c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#800600. remedy: file acceptable report.

    Oct 8, 2021 · Penalty $1,280

    Active
  • Class - 2

    Failure to file acceptable amended cycle 8c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control # 800600. remedy: file acceptable report.

    Aug 1, 2018

    Resolve
  • Class - 1

    Reissue #35248521m date of issue 02-01-2018.failure to maintain building in code compliant manner observed at the time of inspection at expo#1 the property at division street trading inc.store the fire escape s

    Mar 16, 2018

    Resolve
  • Class - 2

    Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #700600. agg2 history of noncompliance on 3602353

    Mar 7, 2018 · Penalty $1,250

    Active
  • Class - 1

    Failure to maintain building in code compliant manner.noted:observed at time of inspection at expo#1 of the property at division street trading inc.store the fire escape steel ladder from cellar to opening at s

    Feb 1, 2018 · Penalty $1,250

    Resolve
Show 40 more ↓
  • Class - 2

    Failure to maintain exterior building north elev.exp1-wood on window (2x4)remedy:maintain exterior building provide safety measures repair/store damaged facade.file report 1-rcny 103-04.

    Dec 2, 2016

    Resolve
  • Class - 2

    Failure to maintain exterior bldg north elev exp1 coping chippers at parapet 7 flr header evidece of rusting 4 floor wood on window sill. west elev. exp4 top floor a/c unit missing bracket-window door rusting

    Jun 30, 2016 · Penalty $500

    Active
  • Class - 2

    Failure to file an acceptable technical report in compliance w/code provisions:36026711x.periodic insp of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.rem:file the

    Nov 2, 2015 · Penalty $8,000

    Active
  • Class - 2

    Failure to maintain exterior bldg. south elevation exp#1 vertical cracks in masonary 4th & 7th fl. requires facade repair. the terracotta window ledges over 4th fl cracked & also decorative stone are cracked

    Sep 2, 2015 · Penalty $500

    Resolve
  • Class - 2

    Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat

    Dec 12, 2014 · Penalty $4,000

    Active
  • Class - 1

    Failure to comply w/the comm's order contained in nov#34844039z issued on 04/24/2010.for work w/o permit.remedy:compoly w/the comm's order.

    Oct 27, 2011 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to comply w/ the comm order contained in nov#34844039z issued on 4/24/10 work w/o permit rem: comply w/ the comm order

    Aug 16, 2011 · Penalty $2,400

    Resolve
  • Class - 1

    Unlawful acts failure to comply with an order of the comm'ssioner respondent failed to correct the violating conditions cited on prior ecb nov34844039z&34900214k for work w/o permit 1.penetrate common wall to c

    Jun 1, 2011 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order to file a certificate ofcorrection w/ the d.o.b. noted : respondent failed to comply w/ the commissioner's order to correct the violating conditions & file a certif

    Mar 2, 2011 · Penalty $800

    Resolve
  • Class - 1

    Unlawful acts. failure to comply w/an order of the commissioner. noted: respondent failed to comply w/the commissioner's order to correct the conditions cited in the prior nov #34844039z. common wall between 47

    Mar 1, 2011 · Penalty $6,000

    Resolve
  • Class - 1

    Unlawful acts.failure to comply with an order of the commissionerresp ondent failed to correct the conditions cited prior nov 34844039z penetrated common wall between 47 & 49 division st on floors 1 and 2. no p

    Oct 20, 2010 · Penalty $24,000

    Resolve
  • Class - 1

    Failure to comply w/an order of the commissioner. respondent failed tocorrect the conditions noted in prior nov #34844039z penetrating common wall between 47 and 49 division street on 1st and 2nd flrs. no pmts

    Aug 23, 2010 · Penalty $2,400

    Resolve
  • Class - 1

    Work w/o a permit:illegal work noted:@ 1st & 2nd flrs 1-having penetrated common wall to connect to #49 bldg to north east @ both 1st & 2nd fls @ 2nd fl # 2 having erected full height partitions to create bedro

    Apr 24, 2010 · Penalty $8,000

    Resolve
  • Class - 2

    Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 and the dob rules and regulations

    Nov 21, 2008 · Penalty $800

    Active
  • Non-hazardous

    18a,b,50.fulton v.t. boiler,10hp,nb 32936,gas 1977.18a,b-scale accumulation active corrosion & evidence of leakage at manholes.de-scale,cle an & re-gasket openings.50-corroded sleeves at manhole compartment.

    Mar 1, 2008

    Resolve
  • Non-hazardous

    Work w/o a permit noted 3 rooms have been erected at the front area at the 2nd fl w/o dob approvals permits remedy: obtain all approvals and permits or restore to prior legal condition

    Jan 10, 2008 · Penalty $250

    Resolve
  • Non-hazardous

    Occupancy contrary to dob records noted 3 rooms have been erected at the front of the 2nd fl and are beingused as illegal sro with beds remedy: discontinue illegal use forthwith

    Jan 10, 2008 · Penalty $800

    Resolve
  • Hazardous

    Exit passage or corridor required width decreased by obstruction on 2nd fl in rear of premises exposure number 3 passagewat from room to fire escape blocked by cloth bags metal gate partially blocked the window

    Dec 21, 2007

    Resolve
  • Hazardous

    B4a/16/34b/32a/50/a. 50-holes in boiler room ceiling.50a-storage & debris in boiler room.

    Nov 6, 2006

    Resolve
  • Non-hazardous

    50a,18ab/50b fulton v.t. boiler, 10hp nb29074 gas1973 50a-corrosion on blowdown piping sys perform repair&replace valves.50b-corrosion on feed water inles piping sys near boiler. perform repairs & replace.

    Jul 24, 2006

    Resolve
  • Non-hazardous

    50a/50c/50b/18ab/48b/50d/fulton vt boiler 10hp,nb 24195,gas 1971/50a-screw threads @ the outlet end of the safety/50b-water column drain valves defective replace/50c-corrosion on feed water inlet line @ boiler

    Jul 24, 2006

    Resolve
  • Non-hazardous

    50a/50b/18ab/fulton v.t. boiler,10 hp, nb 32936 gas 1977/50a-safety valve discharge pipe system reduced reduction elbow installed on the system remove intermediate elbow & install full sized tail pipe

    Jul 24, 2006

    Resolve
  • Non-hazardous

    50a/50b/fulton vt boiler 10hp,nb 72093 gas 1995/50a-inadequate structural support of the boiler's loaded flue pipe system install a heavy duty hanger connected to the boiler room ceiling/50b-boiler room dirty

    Jul 24, 2006

    Resolve
  • Non-hazardous

    50a,50b,18ab.fulton v.t. boiler, 10 hp,nb47613,gas,1983.50a-no enclosure for high press. steam boiler.construct a fire rated boiler room for the fired unit.50b-no structural support for the flue pipe system and

    Aug 31, 2004

    Resolve
  • Non-hazardous

    18ab,50a,50b.fulton v.t. boiler,10 hp,nb 29074,gas 1973.50a-no enclosure provided for high pressure steam boiler.construct a fire-rated boiler room for the unit.50b-no discharge pipe on the safety valve.

    Aug 31, 2004

    Resolve
  • Non-hazardous

    50a,50b,50c.fulton v.t. boiler,10 hp,nb24195,gas,1971.50a-incomplete enclosure for high pressure steam boiler.provide a complete fire-rated boiler room for the unit.50b-no discharge pipe on the safety valve.50c

    Aug 31, 2004

    Resolve
  • Non-hazardous

    50a,50b,50c,44c.fulton v.t. boiler,10 hp, nb 32936,gas,1977.50a-incomplete enclosure for high pressure steam boiler.provide a complete fire rated boiler room for the unit.50b-no structural support for the flue

    Aug 31, 2004

    Resolve
  • Non-hazardous

    50a,50b.fulton v.t. boiler,10 hp,nb 72093,gas 1995.50a-no enclosure for high pressure steam boiler.construct a fire-rated room for the unit.50b-no structural support for the flue pipe system.install a heavy dut

    Aug 31, 2004

    Resolve
  • Hazardous

    Cease use 67d06/85bb05/01b01/44o02/34d06/57e01/41l10/39o02/25w06 67 dog rear rails loose completly off seperated from wall cease use -repairrials before returning to service call dept of building 57e01 during

    Jul 14, 2003 · Penalty $500

    Resolve
  • Non-hazardous

    83o02,01l10,03i10,05i10,31h10,38i10,33r10,51b12,53b12 83-o-02 clean entire device removed old cables and debris from motar room/01-l-10 repair stops switch so alarm rings /03-i-10 repair hole in platfrom right

    Jun 16, 2003 · Penalty $180

    Resolve
  • Non-hazardous

    48(a)(b),50(a)50(d)50(b)50(c)50(e). 50(a) corroded blow down valve. replace with (1st) quick (2nd) slow type. 50(b) no discharge pipe on the safety valve. 50c) flue pipe not supported. hanger to ceiling require

    Apr 14, 2003

    Resolve
  • Non-hazardous

    18(a)(b),50(a),50(c),11(b)50(b). 11(b) blow down line/ valve corroded. replace with 1st quick and 2nd valve slow type. 50(a) steam stop valve non-code type 600 wog. replace. 50(b) non discharge pipe on the safe

    Apr 14, 2003

    Resolve
  • Non-hazardous

    B4a-25a-25b-36-50-bq9. peep hole glass missing install pig tail on steam gauge no rating plate boiler fackets missing.

    Mar 20, 2003 · Penalty $180

    Active
  • Non-hazardous

    73o02/57o02/62d06/45b07/35o02/37b29/28h12. 73 clean down shaft and car top. 62 secure all wires provide all covers. 45 straingten rod clean a path to drim. remove old cables.remove paper from contacts.

    Sep 24, 2002

    Resolve
  • Non-hazardous

    Work without apermit(100% of work completed)noted:new glass and metal frame store front installed.loc:1fl comm.space.d.b.a china restaurant supply,inc.rem:obtain permit and approvals from dept of bldgs.

    Feb 1, 2001 · Penalty $500

    Active
  • Non-hazardous

    48a/48b/49 49)reconnect low water cutoff manual reset condition to boiler.

    Jul 11, 2000

    Resolve
  • Non-hazardous

    Use of prohibited door. noted: at public hallway entrance/exits from various spaces with roll down shutters installed. use of illegal hard-ware. noted: at public hallway entrance/exit doors from space & to

    Feb 24, 1999 · Penalty $350

    Active
  • Hazardous

    Work without a permit.work noted:constructed office.sheetrock on wood stud at 2nd floor north west front section of bldg.approx.10x9.2-fire passage door adjacent to new office is obstructed & will not closed.3-

    Apr 26, 1995 · Penalty $800

    Resolve
  • Hazardous

    Failure to maintain building defect is fire proof self closing door at 2nd floor interior stair is hung on rotted fram,top hing is pulling away door not rated as per code 7 will not close hardware will not enga

    Apr 26, 1995 · Penalty $2,000

    Active
  • Hazardous

    Faiddlure to maintain: defect is: fire proof self closing door at 2nd floor interior stair is hung on one hinge other hinge has rotted away & self closing hardware's not working. remedy:make safe immediately

    Jan 18, 1994 · Penalty $800

    Active

Complaints

  • Plumbing

    Water supply

    Mar 28, 2019 · Apt 7AB

    Close
  • Plumbing

    Water supply

    Mar 28, 2019 · Apt 7AB

    Close
  • Plumbing

    Water supply

    Mar 28, 2019 · Apt 7AB

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Store building (K4)
Year built
1920
Floors
7
Residential units
—
Building area
11,635 ft²
Lot area
1,726 ft²
Zoning
C6-1G
Community board
103
Council district
1
Block / lot
281 / 41
Assessed value
$798,750
Landmark / historic district
No

Questions about 47 Division Street

Who owns 47 Division Street?

The owner of record in NYC Department of City Planning PLUTO data is C K D Division Realty.

Does 47 Division Street have violations?

NYC HPD has no housing violations on record for this property.

Is 47 Division Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 47 Division Street built?

City records list 1920 as the year it was built.