211 Centre Street is an office building built in 1915 in Manhattan, 10013. The owner of record is Museum Of Chinese In America. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
40
ECB violations
24
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 40

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 31, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 31, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 31, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 9, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 29, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 29, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 29, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 29, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 27, 2012

    Dob violation - resolved
Show 30 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 22, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 22, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 22, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 1, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 1, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 1, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 21, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 21, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 21, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 11, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 11, 2007

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 2, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 16, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 16, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 16, 2005

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p1704

    May 21, 2001

    Dob violation - resolved
  • Elevator elevatorrequired

    1p103

    Feb 6, 2001

    Dob violation - resolved
  • Elevator elevatorrequired

    1p1703

    Feb 6, 2001

    Dob violation - resolved
  • Boiler boiler optional

    B-boiler boiler optional

    Nov 21, 1997

    Vp*-violation unserved ecb- dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 17, 1995

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    May 31, 1994

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 14, 1990

    Dob violation - resolved
  • Elevator elevatorrequired

    33-repair over head grating 30-remove all storage from ledges in hoistway

    May 14, 1990

    Dob violation - resolved
  • Elevator elevatorrequired

    (74)file all necessary papers for installation of new controller

    Jan 22, 1990

    Dob violation - resolved
  • Elevator elevatorrequired

    47-provide acces to motor room so a complete inspection can be made

    Jan 25, 1989

    Dob violation - resolved
  • Elevator elevatorrequired

    (27) repair car buffer spring (33) remove bolt locks (47) repair motor room door (51) repair car flooring

    Aug 17, 1988

    Dob violation - resolved

ECB violations · 24

  • Class - 2

    Bc3307.6.4.8/pedestrian protection does not meet code specifications.note:at time of inspection observed a sws and supported scaffolding place a exposure#1 of a 6 story building electrical wiring for sws lighti

    Oct 17, 2019 · Penalty $5,000

    Resolve
  • Class - 2

    Work w/o a permit. noted: observed at time of inspection renovation work in progress in the rear of the 4th fl existing office of the bldg,replacing entire floor of the rear of the 4th fl,size of the floor is

    Feb 27, 2018 · Penalty $500

    Resolve
  • Class - 2

    98bb05;70o02

    May 6, 2015 · Penalty $2,500

    Resolve
  • Class - 2

    6a,15,16,32a,38,50,50a-c.(50)combustible storage in boiler room.(50a)boiler pit sump pump defective.(50b)oil tank sign missing,also storage around oil tank.(50c)oil suction line top of oil tank missing shut off

    Sep 15, 2010 · Penalty $250

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. noted: supported scaffold being used at exp #3 approx 17'-19' high on sidewalk. there are no guardrails,toe board,netting,over

    Aug 20, 2009 · Penalty $2,400

    Resolve
  • Hazardous

    Work contrary to approved plans & application. operation of crane, derrick, or hoisting equipment in a unsafe manner (insufficient couterweights).

    Sep 11, 2006

    Resolve
  • Non-hazardous

    50a,50b,50c,50d/fulton vt boiler, 10hp, nb 58679, gas, 1989/50a-high pressure steam boiler in operation on open factory flr with no enclosure construct boiler room/50b-no discharge pipe on the safety valve

    Jun 27, 2006

    Resolve
  • Non-hazardous

    05i10/16m07/58e01/63a07 (05) car gate not balanced, pulling up dead weight of gate repair. (16) hoistway door straps missing, provide (58) brake shoes rubbing, adjust (63) nyc device # for unit is 1f5406 not

    Oct 4, 2005

    Resolve
  • Non-hazardous

    59x10/#m07/19b01/* (59) machine room lights inoperative repair (#) cab railing missing provide (19) hoistway door closers insufficient at many floors, adjust (*) illegal elevator vestibules at 6,5,3 floors.

    Oct 4, 2005

    Resolve
  • Non-hazardous

    50a/50b fucton v.t boiler 10hp nb 58679 has 1989 50a-corrosion on blowdown line near boiler 50b-no discharge pipe on the saftey valve

    Aug 10, 2004

    Resolve
Show 14 more ↓
  • Non-hazardous

    50a/50b. 50a the blow down valve area underater. they shown be two slow opening valves or one quick opening and one slow opening . 50b replace the xolum drain valves which are rated fo 125wsp to be rated fo 200

    Mar 7, 2003

    Resolve
  • Non-hazardous

    19a/44c/49. 49- must install a dischrge pipe on safety valve. discharge pipe missing. 49b- water lolom drain line is reduced. draim pipe must be same size as outlet opening.

    Feb 11, 2002

    Resolve
  • Non-hazardous

    44c/ 49/ 49) must install discharged pipe on saftey value discharge pipe missing 49b ) water colom drain line is reduced drain pipe must be same size as outlet

    Feb 11, 2002 · Penalty $180

    Resolve
  • Non-hazardous

    49. 49)low water cutoff manual reset not commectes must reconnent fulton hi pressure fboioa boiler nb#47812 1985 year.

    Dec 4, 2000 · Penalty $2,500

    Resolve
  • Non-hazardous

    49, 32a. must install drain line on site glass, tri cooks handle missing, water colom drain line is reduced, no discharge pipe on safety value, safety value leaking.

    Dec 4, 2000 · Penalty $180

    Resolve
  • Non-hazardous

    16,18a,48b,49. 49) no blow down line on site glass. fulton high presure boiler fb015a nb#48231 1985 year.

    Dec 4, 2000 · Penalty $2,500

    Resolve
  • Non-hazardous

    18a,49,16. 49) no discharge pipe on site glass,no discharge pipe on safety value must remove shoutoff value from feedwater tamkventline, boiler rating plate missing water colom drain line is reduces.

    Dec 4, 2000 · Penalty $2,500

    Resolve
  • Hazardous

    Required means of egress obstructed. noted: lafayette staircase used for storage on stairs & public landings. at 6 fl & 5 fl level and inadequate lighting in public stair at time of inspection. boxes piled

    Aug 20, 1999 · Penalty $400

    Resolve
  • Non-hazardous

    Iure to maintain exterir buliduing wall in that cement plater on brick wall obove parapet on teh west side of building is missing various locations. cement plaster found on side of lafayette. remedy provide o

    Jul 19, 1996 · Penalty $800

    Resolve
  • Hazardous

    Failure to maintain defect are:parapet wall loose,and cracked stucco,falling hazardous condition location:front 215 centre. remedy:provide sidewalk shed for protection of the public. make a ll necessary reparis

    Jul 23, 1991 · Penalty $720

    Resolve
  • Non-hazardous

    Boilers

    Dec 27, 1988 · Penalty $75

    Resolve
  • Non-hazardous

    Boilers

    Dec 27, 1988

    Resolve
  • Non-hazardous

    Use of illegal hardware, fire exit doors at the 5th story are equipped with illegal slide bolts. remedy: remove illegal slideboltsforthwith.

    Aug 17, 1988 · Penalty $100

    Resolve
  • Unknown

    Boilers

    Jul 13, 1988 · Penalty $125

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Office building (O5)
Year built
1915
Floors
6
Residential units
—
Building area
46,700 ft²
Lot area
8,145 ft²
Zoning
M1-5/R10
Community board
102
Council district
1
Block / lot
234 / 17
Assessed value
$4,270,950
Landmark / historic district
No

Questions about 211 Centre Street

Who owns 211 Centre Street?

The owner of record in NYC Department of City Planning PLUTO data is Museum Of Chinese In America.

Does 211 Centre Street have violations?

NYC HPD has no housing violations on record for this property.

Is 211 Centre Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 211 Centre Street built?

City records list 1915 as the year it was built.