459 Broadway
Manhattan, NY 10013BBL 1-00231-0030Map
Owner of record: The Devlin Building,
459 Broadway is an office building built in 1861 in Manhattan, 10013. The owner of record is The Devlin Building,. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 87
- ECB violations
- 40
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 87
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2021
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 2020
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 5, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 5, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 5, 2019
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2012
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2010
Dob violation - resolved - Landmark none
Landmk-landmark none
Jun 29, 2009
Dob violation - active - Landmark none
Landmk-landmark none
Jun 29, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Landmark none
Landmk-landmark none
Oct 31, 2008
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 30, 2008
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2008
Dob violation - resolved
ECB violations · 40
- Class - 1
1. electrical work without permit. noted approx. 9 outlet boxes installed with bx cables as feed for roof decking without permits on file., obtain permit
Apr 14, 2026 · Penalty $12,500
Active - Class - 1
Ftm building in a code compliant manner. noted at 5th fl ftm/provide adequate staircase with hand rails for access to fire escape egress. additionally, ftm lighting at 5th fl staircase. these conditions present
Apr 14, 2026 · Penalty $6,250
Resolve - Class - 1
1. ftm building in a code compliant manner. noted, inadequate housekeeping in the corridor and at base of staircase at cellar level with garbage, building materials, metal shelving blocking/minimizing passage t
Apr 14, 2026 · Penalty $12,500
Active - Class - 1
Failure to maintain building in a code-compliant manner. at the time of inspection, i observed 12'w x 12'l left side cobble stone wall at rear left side of the building has partially collapsed. middle section i
Apr 24, 2025 · Penalty $5,000
Active - Class - 2
Failure to comply with commissioners order to file a cert of correction with the dept of buildings. no c of c on file for ecb violation #39082805m (class 1 immediate hazard) issued 03/31/2023 regarding partial
Nov 16, 2023 · Penalty $1,250
Active - Class - 2
Failure to maintain adequate house keeping per section requirements. noted: premises 5-story office building. at time of inspection observed construction materials sheetrock 2"x4" woods and demo debris stored o
Aug 15, 2023 · Penalty $3,125
Resolve - Class - 2
At time of inspection observed construction materials sheetrock 2"x 4" woods, and demo debris stored on roof inadequate manner. storage materials and debris unsafe, loose and flyable by high wind., repair and/o
Aug 15, 2023
Resolve - Class - 1
Failure to maintain building in a code-compliant manner. at the time of inspection, i observed 12'w x 12'l left side cobble stone wall at rear left side of the building has partially collapsed. middle section i
Mar 31, 2023 · Penalty $6,250
Active - Class - 2
Sidewalk shed parapet panel not in compliance w/ section.noted:@ time of insp sidewalk shed parapet panel @ exp #4 does not contain:1 the street address of the site.2 name of the contractor respnsible for the s
Apr 23, 2014 · Penalty $400
Resolve - Class - 2
Failure to maintain building in code-compliant manner noted: at roof bulkhead exit door & frame dented & out of square preventing proper door function. remedy: repair and/or replace roof bulkhead door & door
Nov 3, 2010
Resolve
Show 30 more ↓
- Class - 2
Failure to comply w/the commissioner's order to file a certificate of correction w/the dept of buildings for open ecb notice of violation #34862367r. remedy: comply w/the commissioner's order to file a certific
Nov 3, 2010
Resolve - Class - 2
Failure to maintain bldg in code compliant manner missing &/or no fire stopping in exit stairwell 1- ground fl pipe penetration 2- along stair stringers 3- 4th fl ceiling & fl pipe penetrations remedy: install
Sep 22, 2010
Resolve - Class - 1
Failure to maintain bldg in code compliant manner: use of prohibited door & frame & hardware 1- roof - door is not able to close hits frame holes in door has open circular penetration remedy: provide doors fram
Sep 22, 2010 · Penalty $1,000
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner. 1- interior exit doors not self-closing - 3rd flr. 2- ground flr exit battery pack lightsnot functional. 3- interior public stairs not fully secured. remedy:
Oct 14, 2009 · Penalty $250
Resolve - Class - 1
Failure to provide unobstructed exit passageway. 1- umbrella - basket on exit landing - 2nd flr. 2- 4'x 8' metal in exit passageway - 3rd flr. 3- ground flr landing - 2' x 5' approx yoga sign. remedy:
Oct 14, 2009 · Penalty $1,200
Resolve - Class - 1
Altered/changed bldg occupied w/o a valid c/o. permit #110464382 - renovation of existing commercial space on 2nd & 3rd flrrs. permit not signed off. remedy: obtain a valid c/o or discontinue illegal use.
Oct 14, 2009
Resolve - Non-hazardous
Work w/o a permit work noted at front and side of premises corner broadway and grand st erected sidewalk shed no valid permit in file remedy: obtain a permit
Feb 26, 2008 · Penalty $500
Resolve - Hazardous
Work w/o a permit. permit # 104133956 has been revoked for failure to comply w/ a "10 day letter" issued on 01/26/07 to provide required information on objections. remedy : comply w/ 10 day letter & objections
Feb 8, 2007
Resolve - Hazardous
Sidewalk shed does not meet bldg code specifications.noted:shed present approx 100'(wrapped around corner)where -as no lights illuminated. remedy:conform shed to bldg code specifications .
Jan 6, 2007 · Penalty $2,000
Resolve - Non-hazardous
Failure to post contractor sign:upon inspec.@ the above property alteration in progress in cellar & 1st fl.walls removed & new ones being built.sidewalk shed up & there is no contractor sign for alteration nor
Nov 6, 2006 · Penalty $500
Resolve - Hazardous
Failure to safeguard public & property during construction operation.upon inspec.@ the above property alteration in progress in cellar wall demolished,bldg elevator pit,adacent property(store)wall damage during
Nov 6, 2006 · Penalty $1,500
Resolve - Non-hazardous
Failure to safeguard public & property effected by demolition operation @ 2nd flr ceiling @ 1st flr damaged by water (jewerly store) all ceiling in stairs.remedy:safeguard public & propertyeffected by demolitio
Sep 15, 2006 · Penalty $1,500
Resolve - Hazardous
Failure to safeguard public & property during constr operations.noted:demo of existing fl under appl #104249378 exp. 1/16/07. having caused damage to adj comm establishment (jewelry store) penetrated interior.
Aug 18, 2006
Resolve - Non-hazardous
Work w/o permit. work noted: interior demo in progress under appl. #104249378- appl. has been disapproved on 10/07/05- work continues on 1st, 2nd, 3rd fls having removed partitions full height ceilings fls w/o
May 15, 2006 · Penalty $800
Resolve - Non-hazardous
39p07/40m11/05b11/28b01/16b11 40m11-machine room sign is on old door laying down on root repalce machine room sign 05b11-door clutch loose repair device 28b01 car door slams in the open position adjust as need
Mar 15, 2004
Resolve - Non-hazardous
Work w/o a permit:expired permit.noted:posted permit issued under alt type 2 application #103511175 expired 9/14/03(interior demolition)obsreved partial demo of partitions walls construction debris piles.constr
Nov 13, 2003 · Penalty $250
Resolve - Non-hazardous
10m12/ 38i12/ 36o02/ 48m16/ 80m12/ 29e07/ 65j01/ 80m12+/ 55x1110m12 missing gibs on sets of doors (1) each door repalce gibs 48m16 repalce hoist rope data tag 80m12 replace toe guard 29e07 shoes squeaks
Feb 25, 2003 · Penalty $180
Resolve - Hazardous
Check boiler room agent/owner used boiler room as storage ara no access to inspected boiler. complain owner/agent throw me out of premises.
Nov 25, 1997 · Penalty $2,500
Resolve - Non-hazardous
08v,50y,. 08-adjust floor stops. 50- properly seal machine of oil leak.
Apr 20, 1996
Resolve - Non-hazardous
50y,37d, 50 seal machine of oil leak. 37- properly nount resistor to controller.
Apr 20, 1996
Resolve - Non-hazardous
Work without a permit: work noted--remove glass at show case window north to create a vendor's booth first story. remedy: obtain a permit if feasible or restore premise to prior legal condition.
Oct 20, 1994 · Penalty $1,000
Resolve - Non-hazardous
35p,11q,14m,28j
May 16, 1994
Resolve - Non-hazardous
Failure to provide durable elevator landing sings throughout floors nopaper signs acceptable remedy provide signage as per ll 16
May 11, 1993
Resolve - Non-hazardous
Floor number signs not adequate. (i.e. #3 floor) painted on both 3rd & 4th floors. 5th floor has no sign posted. stair & elevator i.d. signsmissing throughout bldg. remedy: install signs as per code ll 16/84
Dec 4, 1992 · Penalty $1,000
Resolve - Non-hazardous
Floor number signs missing throught bldg. stair i.d. signs missing, remedy: install signs as per code ll18/84
Jul 13, 1992
Resolve - Non-hazardous
74#,15l,73o,18l,21l,74a#,35p,11m,74b#,14m,7l. #74remove excess noise from shaftway.#74provide cab capacity plate. #11 guards. #74b.adjust floor steps.
Oct 8, 1991 · Penalty $75
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/24 certifyingto the installation of required fire protection systems. remedy-file report
Jan 28, 1991
Resolve - Non-hazardous
Feed ling nipple leaking to rep¢lace b gage glass to fit with stop walve & drain pipe
Oct 2, 1989
Resolve - Non-hazardous
Large glass shall be fitted with proper drain with a stop valve to lcean the glass
Aug 23, 1988
Resolve - Non-hazardous
Boilers
Aug 9, 1988
Resolve
Complaints
- Electric
Electric-supply
Jun 10, 2004 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O5)
- Year built
- 1861
- Floors
- 5
- Residential units
- —
- Building area
- 29,415 ft²
- Lot area
- 5,385 ft²
- Zoning
- M1-5/R9X
- Community board
- 102
- Council district
- 1
- Block / lot
- 231 / 30
- Assessed value
- $11,934,450
- Landmark / historic district
- SoHo-Cast Iron Historic District
Questions about 459 Broadway
Who owns 459 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is The Devlin Building,.
Does 459 Broadway have violations?
NYC HPD has no housing violations on record for this property.
Is 459 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 459 Broadway built?
City records list 1861 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.