454 Greenwich Street
Manhattan, NY 10013BBL 1-00224-0032Map
Owner of record: 445 Washington LLC
454 Greenwich Street is a hotel built in 2021 in Manhattan, 10013. The owner of record is 445 Washington LLC. HPD has recorded 1 housing violation here, most recently on May 11, 2026. 1 of the 1 most recent violations are still open.
- HPD violations
- 1
- DOB violations
- 14
- ECB violations
- 31
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Open — Nov sent out
DOB building violations · 14
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Construction other optional
Working contrary to executive order #202.6 by the governor & subsequent ordrs & guidance published by the empire state developement corporation pursuant to same.i observed approx 8-10 men working on the foundation secant walls near the adjacent property & removing some earth from the excavation
Apr 28, 2020
Dob violation - dismissed - Construction other optional
Borough commissioner stop work order issued to job #123467159, due to contractors withdrawal
Jun 5, 2019
Dob violation - dismissed - Construction other optional
Borough commissioner stop work order issued to job #121193010, due to contractor withdrawal.
Jun 5, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 3, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 24, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed
Show 4 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed
ECB violations · 31
- Class - 1
Failure to notify dept of incident that resulted in fatality or injurynote:worker fell off ladder taken to offsite medical facility:per deptrecords 8stynb site permit holder failed to notify dob w/i 3biz days o
Jul 20, 2022 · Penalty $5,000
Resolve - Class - 2
Observed a yodock and chain link fence at exp 1, greenwich st. out of plumb, held together with tie wire in some sections or not at all in other sections. yodocks not solid filled., comply with specifications
Mar 1, 2022
Resolve - Class - 1
Work does not conform to approved construction documents. note: at thetime of my inspection of an proposed 8 sty new bldg an active jobsite.i observed a beta max/gantry crane/lifting material hoist on the main
Apr 21, 2021 · Penalty $2,500
Resolve - Class - 2
Failed to notify dept prior to installation of suspedned scaffolding. noted: at the time of my inspection of a proposed 8 sty new bldg under construction an active job site. i observed at exp#4 on the 7th floor
Apr 21, 2021 · Penalty $1,250
Resolve - Class - 1
Sec. 3314.8.1 missing guardrails & toe boards on supported scaffolding. note: at the time of my inspection of an proposed 8 sty new bldg under construction,an active job dsite i observed a supported scaffold al
Apr 21, 2021 · Penalty $2,500
Resolve - Class - 2
Scaffold training certificated not made available at time of inspections. note: at the time of my inspection of a proposed 8 sty new bldg under construction an active job site upon request for personnel using
Apr 21, 2021
Resolve - Class - 2
3301.13.5 failure to designate alternate construction superintendent. at the time of inspection of 8 story nb at 5th fl level,active job site. upon review of logs,observed that const super who is designated on
Jan 16, 2021 · Penalty $1,280
Resolve - Class - 2
Bc 3303.4.7 work or storage zones-note:at the time of inspection it was observed construction material at least 8' topped,stacked at exposure#1 greenwich st above a moveable barrier. const material stored adjac
Dec 31, 2020 · Penalty $625
Resolve - Class - 1
Failure to institute and maintain safety equipment measures note at the time of my inspection for an incident that an indivual got injured a ramp at foundation level worker was reported to nearly hospital
Nov 4, 2020 · Penalty $10,000
Resolve - Class - 1
Bc3301.8.1-tampering note:at the the time of my inspection responding to a complaint where an worker was injured at foundation level inspection reveal worker was walkingdown a ramp with two platform when worker
Nov 4, 2020 · Penalty $2,500
Resolve
Show 21 more ↓
- Class - 1
Bc3301.6-design size and capacity of materials note at the time of my inspection of a 8 story building at foundation level inspector respodning to complaint where an work fell walking a platform inspector also
Nov 4, 2020
Resolve - Class - 2
Pedestrian protection does not meet code specfication: note: @time of inspection of a proposed 8 storeys new bldg under const @excauvation lvl, i observed an extention of sidewalk shed to adjacent bldg @expo#1
Jun 11, 2020
Resolve - Class - 2
Failure to provide code requirements for temp walkways.jobsite @ excavation/foundation phase.at the time of my inspection,i observed the pedestrian walkway did not have the required pathway of 5'@exps#1&2.exp#1
May 8, 2019 · Penalty $2,430
Resolve - Class - 1
No competent person onsite or superintendent. the construction super intendent must designate at competent person for each jobsite for which he is responsible and ensure such person is present while active
Mar 18, 2019
Resolve - Class - 1
No updated monitoring reports provided. as per adjacent property no reports provided after janaury 27, ongoing work up till february 19 as per concrete subcontractor competent onsite at time of inspection no re
Mar 18, 2019 · Penalty $2,530
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. at thetime of inspection it was observed that the respondent continued work while on notice of a stop work order. the swo was partially rescinded
Jan 4, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations. at hte time of inspection it was observed that the above property caused damages to the facae and roof of the adjacent property
Jul 31, 2018 · Penalty $10,030
Resolve - Class - 2
Work does not conform to approved construction documents. at time of inspection observed an active construction site with drilling work in progress. during inspection, noted that the contractor exceeded there m
Jul 27, 2018
Resolve - Class - 1
Failure to protect or adequately protect adjoining structures during excavations operations. at the time of my inspection it was observed that on an active construction site with excavtions in progress adjoin
Jul 10, 2018 · Penalty $5,000
Resolve - Class - 2
Bc 3309.6 failure to monitor adjoining structures for movement in all (directions) during excavation related-activity that (may) adversely affect adjoining structures.(monitoring reports) @time of time of my in
May 25, 2018
Resolve - Class - 2
Work contrary to approved dob plans @the time of my insp it was observed an active const site w/excavation in progress where it was noted that contractor was installing (seleant) piles along (459) washington st
May 25, 2018
Resolve - Class - 1
Sec. 3307.2.1 no dot permit-obstruction of street/sidewalk. note: observed construction lot w/equipment stoted. there is a construction fence erected on top of concrete barracades along debrosses st & also on
Oct 25, 2017 · Penalty $1,630
Resolve - Class - 2
Sec. 3303.4.1.1 maintenance: slipping tripping hazards. note: observed construction lot,heavy equipment on site-no activity. there is a construction fence erected on top of concrete barracades over sidewalk &
Oct 25, 2017 · Penalty $830
Resolve - Class - 2
Work w/out a permit. expired fence. noted: @ time of insp observed an erected 8' fence under job# 122463271 issued on 2/16/16 expired on 2/15/17 department of bldg records indicate no new fence permit obtained.
Sep 8, 2017 · Penalty $830
Resolve - Class - 2
3307.6.5,failure to maintain adequate illumination beneath sidewalk shed as required by code.noted:sidewalk shed erected under job#140059736along exp#2 has inoperable bulbs.remolding affected area visibly dark
Jan 4, 2016
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. at time of inspection observed,active job site mechanical demolition of a commercial bldg in progress. the sidewalk shed at expos
Sep 17, 2014 · Penalty $2,400
Resolve - Class - 1
Failure to maintain exterior bldg walls or appurtenances. defects noted: at time of inspection there is a vertical cracks in brick at exposure #2 from parapet down to top of garage doors. missing or deteriorate
Feb 23, 2013 · Penalty $1,000
Resolve - Class - 1
Work w/o a permit. work noted: at time of inspection partition walls (full height) have been erected/framed creating apts (2). plumbing pipefor supply & returns for kitchens & bathrooms. electrical wiring
Feb 22, 2013 · Penalty $1,600
Resolve - Class - 1
Occupancy contrary to that allowed by the c of o or bldg dept records.defects noted: at time of inspection bldg is occupied at mezzanine of garage by 2 apts,a wood working shop & a metal working shop contrary
Feb 22, 2013 · Penalty $2,400
Resolve - Class - 1
Unsafe storage of combustible material & equipment. defects noted: at time of inspection oxygen,acetylene & propane tanks are not stored in a proper manner at mezzanine metal work shop & in apts. propane & gas
Feb 22, 2013 · Penalty $2,400
Resolve - Class - 1
Failure to maintain bldg in a code compliant manner. defects noted: attime of inspection coal burning stoves in mezzanine apts are not vented in a proper manner. propane tank is being used to supply stove. hot
Feb 22, 2013 · Penalty $1,000
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H1)
- Year built
- 2021
- Floors
- 8
- Residential units
- —
- Building area
- 85,275 ft²
- Lot area
- 11,962 ft²
- Zoning
- C6-2A
- Community board
- 101
- Council district
- 1
- Block / lot
- 224 / 32
- Assessed value
- $23,506,200
- Landmark / historic district
- Tribeca North Historic District
Questions about 454 Greenwich Street
Who owns 454 Greenwich Street?
The owner of record in NYC Department of City Planning PLUTO data is 445 Washington LLC.
Does 454 Greenwich Street have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 454 Greenwich Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 454 Greenwich Street built?
City records list 2021 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.