roofy

370 Canal Street

Manhattan, NY 10013BBL 1-00211-0029Map

Owner of record: Tribeca Ascott LLC

370 Canal Street is a hotel built in 2007 in Manhattan, 10013. The owner of record is Tribeca Ascott LLC. HPD has recorded 11 housing violations here, most recently on November 15, 2023.

HPD violations
11
DOB violations
83
ECB violations
79
HPD complaints
2

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Nov 15, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 11

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 15, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 31, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 2, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 10, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 10, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 20, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 20, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 6, 2019

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 26, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 11, 2017

    Closed — Violation dismissed
Show 1 more ↓
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 30, 2016

    Closed — Violation dismissed

DOB building violations · 83

  • Residential elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Dec 17, 2021

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 24, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 24, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 24, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 24, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 14, 2020

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
Show 40 more ↓
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    Cease use

    Mar 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 23, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 23, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 23, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 23, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 23, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 23, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 23, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 23, 2018

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 22, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 22, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 22, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 22, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 22, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 22, 2017

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Construction other optional

    Section of glass approximately 2' above canopy at entrance to building , shatter and dislodged onto sidewalk

    Jun 12, 2016

    Dob violation - dismissed
  • Residential elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Jun 1, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 4, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 4, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 4, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 4, 2015

    Dob violation - resolved

ECB violations · 79

  • Class - 1

    Cu-05a10,05b11,53b14,16o02,70o02,52m07. 05a10-cease use item. door zone restrictor has been tampered with and rendered inoperative.this is asaety device to ensure passenger's safety repair door restrictor and

    Jul 13, 2017 · Penalty $1,030

    Resolve
  • Class - 2

    59u15,68b07. provide brake maintenance tag as er a17.1 2003 and appendix k3 8.6.4.6.

    Aug 10, 2016 · Penalty $250

    Resolve
  • Class - 1

    Work w/o a variance.(@ time of inspection crane set-up in street readyto work with no after hours work variance)

    Apr 18, 2010 · Penalty $1,600

    Resolve
  • Class - 2

    Jobsite fence not constructed pursuant to subsection defects noted:cyclene fence erected @ sdwlk under appl#104579396 exp06-29-10found with barbed wires mounted on top @ various locations.rem:remove the illegal

    Dec 22, 2009

    Resolve
  • Class - 2

    Sdwlk shed does not meet code & specifications:defects noted sdwlk shed erected under appl#110397981-01-eq-sh exp4-10-2010 found with exposed bolts @ various locations leaving said bolts unprotected w/o the req

    Dec 22, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Sec.28-105.12.8 & 27-201. work is not in accordance w/site safety plannoted:at time of inspection site safety plan indicate sidewalk shed tobe erected yard at exposure 4 to provide overhead protection to adjoin

    Dec 10, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    "stop all work" failure to safeguard all persons & property affected by construction operations.at time of inspection incident called in by site safety of site.men working on multi point scaffold at exposure 4

    Dec 10, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    No user certificate of fitness for working on suspended scaffold. noted: at time of inspection at above active site, bldg complete to the roof, construction work in progress. observed 2-workers working on

    Oct 14, 2009 · Penalty $400

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements.note:@ time of inspec. of above active site bldg.up to the roof construction work in progress observed pieces of concrete bricks& wood outside

    Sep 21, 2009 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements. noted: at time of inspection at above active site bldg up to the roof, construction work in progress. observed pcs of concrete, bricks, wood

    Sep 2, 2009 · Penalty $800

    Resolve
Show 40 more ↓
  • Class - 1

    Storage of material during construction.as noted:at time inspection onactive construction site bldg up to 22 stories(roof level)material is stored within 10ft from edge of slab on floor 21 black pipe metal stud

    Jul 20, 2009 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to post permit upon inspection construction of nb in progress.at time of inspection noted that temporary elevator is in service,the electrical permit for temporary elevator not posted.

    Jun 10, 2009

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendment upon inspection noted the roof protection provided on the roof of adjoining building on west side of the building under constru

    Jun 10, 2009

    Resolve
  • Class - 1

    Sec bc3313.1 27-1069 storage of volatile flammable and combustible mixtures noted at time of insp on active job site w/ concrete rebar forming and plumbing work in operation observed on 1st fl rear of site on l

    May 6, 2009 · Penalty $800

    Resolve
  • Class - 1

    Failure to institute & maintain safety equipment measures or temporary construction no toe boards noted at time of insp on active jobsite w/ concrete rebar forming plumbing work in operation observed on the 14t

    May 6, 2009 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to provide required temporary or permanent elevator in readiness in bldg under construction or demolition noted at time of insp on active job site w/ rebar forming work being installed on 21st and multi

    May 6, 2009 · Penalty $8,000

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by const operations noted at time of inps on active jobsite w/ rebar forming plumbing partition wall erection in operation observed on the following fls open

    May 6, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    No record of daily inspection of suspended scaffold performed by an authorized person at site noted: no record of daily log on site at time of inspection. do not remove equipment stop all work on suspended

    Apr 28, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to safeguard all person & property affected by construction operation,noted at time of inspection on active job site w/concrete pouring in operation.observed on leonard st elevation staging area at grou

    Apr 28, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to institute & maintain safety equipment measures or temporaryconstruction.(no toeboards).at time of inspection on active job site w/concrete pouring in operation,observed no toe board provided at stair

    Apr 28, 2009 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by const.operations.noted at time of inspection on active job site w/concrete pouring in operation.observed open unguarded holes thru concrete slab at follow

    Apr 28, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Licensed rigger failed to ensure scaffold worker met minimum requirements. noted: several men working on scaffold w/o minimum requirements at time of inspection. do not remove equipment stop all work on suspend

    Apr 28, 2009 · Penalty $400

    Resolve
  • Class - 2

    Failure to safeguard all persons and property affected by constructionoperations. at time of insp at active job site with rebar forming & plumbing work & concrete form stripping in operation. at both 1st & 2n

    Apr 7, 2009 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to safeguard all persons and prop affected by const operationsat time of insp on active job site with rebar forming & form strippingin operation. observed on both 1st & 2nd fl @ front (canal st) elevati

    Apr 7, 2009 · Penalty $12,000

    Resolve
  • Class - 1

    Sec 3307.8 safeguard guardrail requirement noted at the 14th fl west side of bldg no guardrails provided removed not re-installed no one working at area rem: provided guardrails

    Mar 30, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Sec 3308.1.1 vertical netting requirement noted at 14th fl west side of bldg no net in place net removed at 12th 13th 14th fls at various ares nets are loose not secured to cable rem: provide vertical nets wher

    Mar 30, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperations noted at 14th floor west side of bldg cables nets removed horizontal nets being jumped workers on other floor no protection at pe

    Mar 30, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Sec 3307.8.1 toe board requirement noted toe boards missing at staircase south side of bldg and northside toe boards missing at 14th fl west side of bldg rem: provide toe boards

    Mar 30, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. noted: at staircase 3,at eastside by hoist,from the 11th to7th flr outside walls have no protection from falling material & stair

    Mar 3, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. 1906.6.6.1.2 w/i 10ft of facade secured from fall noted: reshoresat 11th flr west end are not secured. remedy: secure all(reshoces).

    Mar 3, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    W/i 10ft of facade secured from fall noted: reshores at 10th & 11th flrs at east,south side all not secured. remedy: secure all reshores w/i 10ft.

    Feb 25, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard all person & property affected by construction operations.noted:at 8 fl staircase by hoist guardrails,toeboard-protection around presently poured concrete stairs has been removed & not rein

    Feb 25, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. 1906.6.1.2. w/i 10' of facade secured from fall - noted: reshoresat 9th and 10th fls have not been secured from fall - approx 6 reshores at 9th fl and 5 at 10th fl. remedy: secure all reshores.

    Feb 18, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment of temporary construction - no toe boards. noted: at staircase at south side missing toe boards at various floors 6th 9th 5th and at elevator shape area also at

    Feb 10, 2009 · Penalty $1,000

    Resolve
  • Class - 2

    No designated site safety manager.at the time of inspection documentation of pw-2 does not correspond w/nyc information as of 2/10/2009.remedy;provide pw-2 information (correct) as per nyc code.

    Feb 10, 2009 · Penalty $400

    Resolve
  • Class - 2

    Failure to safeguard all persons and property affected by constructionoperations upon inspection - noted: from 2nd fl thru to 8th floors up against adjacent bldg a gap approx 12"w x 12'l exit - anything can

    Feb 10, 2009 · Penalty $1,200

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements. upon inspection at active jobsite rebar placement and concrete forming on going horizontal (nets) locates on eastside of bldg and westside of

    Jan 27, 2009 · Penalty $400

    Resolve
  • Class - 2

    Failure to safeguard all persons and property affected by constructionoperations upon inspection at active jobsite on southside on 5th flr rectangular opening apprx 2'x3' covered by loose laid plywood also circ

    Jan 27, 2009 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment or temporary construction - no toe boards upon inspection on active job site on 6th fl near south staircase also 5th fl at east wall by shaft at 2nd fl by elevator

    Jan 15, 2009 · Penalty $1,000

    Resolve
  • Class - 1

    Sec. bc 3308.3;27-1021(g)(3). failure to provide required vehicle safety netting. upon inspection on active job site vehicle netting throughout site not as per nyc bldg code. observed on 2nd fl south side

    Jan 15, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard all person & property affected by construction operations-defect is:several sections ok steel repair approx 2' - 3'(feet)in length are exposed & hanging into public way under sidewalk shed.

    Jan 13, 2009

    Resolve
  • Class - 1

    Sec. 3303.12 temp. elevator & hoist 75ft/7fl noted: 8th flr has been poured at a height of 78ft with no elevator in readiness. remedy: stop all work above 7th flr/provide elev/hoist in readiness call best sq fo

    Jan 5, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard public and property noted at 2nd 3rd 4th and 5th fl at north east end an uncovered and unprotected opening at fl apprx 8'x6 danger of some one or something falling down

    Dec 15, 2008 · Penalty $2,400

    Resolve
  • Class - 1

    Sec 3314.8 27-1009a failure to provide guardrail noted at landing at 2nd fl stairs at either side no guardrails provided rem: provid guardrail

    Dec 15, 2008 · Penalty $1,600

    Resolve
  • Class - 1

    Site safety plans and safety program required noted: pouring at 4th flr southside removing form work at 2nd flr, forming at 3rd flr north side block work at ground flr northside no site safety plan st site.

    Nov 22, 2008 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard public and property noted: at ground flr level northside at front and side of bldg as well as at south end of bldg there is no overhead protection, from construction work above bldg is appx

    Nov 20, 2008 · Penalty $2,400

    Resolve
  • Class - 1

    Warning signs and lights noted: at street level south side no lights have been provided for barricades on street apprx 60' of barricades. remedy: provide lights every 15' of barricades.

    Nov 20, 2008 · Penalty $800

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements upon inspection construction of nb is in progress,forming and placing of rebars on 1st flr is going on. at time of inspection as noted construc

    Sep 17, 2008 · Penalty $400

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping as per section requirements upon inspection construction of foundation of nb is in progress. at time of inspection as noted construction materials, debris equipment

    Aug 1, 2008

    Resolve
  • Class - 1

    Failure to have site & safety manager as required no manager at active site at the time of inspection remedy:provide site & safety mgr.

    Jul 24, 2008 · Penalty $2,400

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Jan 5, 2022 · Apt ROOM16

    Close
  • Unsanitary condition

    Pests

    Jan 6, 2017 · Apt 1113

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H1)
Year built
2007
Floors
21
Residential units
—
Building area
160,545 ft²
Lot area
10,622 ft²
Zoning
C6-2A
Community board
101
Council district
1
Block / lot
211 / 29
Assessed value
$32,372,100
Landmark / historic district
No

HPD registration #144123, last renewed Jul 18, 2025.

Questions about 370 Canal Street

Who owns 370 Canal Street?

The owner of record in NYC Department of City Planning PLUTO data is Tribeca Ascott LLC.

Does 370 Canal Street have violations?

Yes. NYC HPD has recorded 11 housing violations at this property.

Is 370 Canal Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 370 Canal Street built?

City records list 2007 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.