101 Lafayette Street is an office building built in 1928 in Manhattan, 10013. The owner of record is Kit Tzing Lee Kuan Realty. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 108
- ECB violations
- 73
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 108
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 10, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 3, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - active - Construction other optional
Emergency work order due to defective facade at exp4(south elev)observ deteriorated/crack stucco at the parapet wall at multiple locations and damaged mortar joint/peeling off stucco without any safety measures for roof of adj bldg. remedy: immed provide safety measures for exp4(south elev)for adj bldg 99 lafayette st to protect the people
Feb 23, 2023
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9b unsafe report filed
Feb 21, 2023
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - active
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2021
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 2, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 2, 2020
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2019
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Mar 18, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2017
Mar 27, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 24, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 24, 2014
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Jul 3, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 5, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 5, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 4, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 29, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 29, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 8, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 8, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2009
Dob violation - resolved
ECB violations · 73
- Class - 1
Failed to notify the dept of a incident that resulted in a fatality or injury. at time of my inspection upon reviewof dept records it revealed that there were no electronically filing of an incident within 3 bu
Sep 4, 2026 · Penalty $10,000
Active - Class - 2
Failure to file acceptable amended cycle 9b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #900438. remedy: file acceptable report.
Jan 16, 2024 · Penalty $1,250
Resolve - Class - 1
Meo electric corp, comply with ec
Sep 1, 2023
Resolve - Class - 2
At time of inspection observed sidewalk shed in place at expo#1-2, missing caps from the bolts at sidewalk shed can create hazardous condition for pedestrian(3307.6.5.6 sharp edges.)comply with code
Jul 29, 2023
Resolve - Class - 2
Failure to maintain building walls or appurtenances.observed during inspection on exposure 4 spalled masonry on roof of building at different locations spalled masonry on parapet wall on exposure 1 spalling.rem
Apr 12, 2023 · Penalty $1,250
Resolve - Class - 1
Failure to maintain exterior building facade & appurtenances.note:as of today time of inspection 2/23/23 observed at exp #1(west el)loose bricks masonry/damaged mortar joint & at exp #4(south el) deteriorated/p
Feb 23, 2023 · Penalty $625
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation#35095160l issued on 7/3/2014,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).rem:file a certificate
Jun 29, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#3534467rm issued on 06/18/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no c of c on file.rem:com
Nov 29, 2018
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/ violation #3544676r issued on 6/18/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. remedy: comply with
Oct 18, 2018 · Penalty $625
Resolve - Class - 2
Failure to comply with commissioners order to file a.failure to complywith the commissioners order contained in summons/violation #35344676rissued on 06/18/18 and to file a certificate of correction pursuant to
Aug 28, 2018 · Penalty $1,250
Resolve
Show 40 more ↓
- Class - 2
Reissue#35335550r date of issue 06-18-2018.failure to comply with the commissioner's order to file a certificate of correction with the department of building.a stop work order issued on 3-1-18 for work w/o per
Aug 2, 2018
Resolve - Class - 1
Reissue#35336424k.date of issue 06/18/2018.unlawful acts failure to comply with an order of the commissioner at 4th fl file room installed a new residential sinks w/a new fiting water line & waste line also at
Aug 2, 2018 · Penalty $2,500
Resolve - Class - 1
Unlawfully continued work while on notice of swo.noted:a stop work order(partial)has been issued before for a construction work at 4th floor.at time of inspection observed approx 95%of the work has bee complete
Jun 18, 2018 · Penalty $5,000
Resolve - Class - 1
Failrue to obey a vacate order by the commissioner per 28-207.4. noted: a stop work order issued on 3-1-18 for work w/o permit for 75% of construction work completed at 4th fl. at time of inspection observed,th
Jun 18, 2018
Resolve - Class - 1
Work w/o a permit. noted: at 4th fl,file room,installed a new residential sinks w/a new fitting,water line & waste line. also at existing restroom installed a new drain pipe for washing sink. the work has been
Jun 18, 2018 · Penalty $1,250
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments. noted: a plan drawing #a-001 obtained for 4th fl indicates there is a file room. at time of inspection are observed the file roo
Jun 18, 2018 · Penalty $620
Resolve - Class - 1
Work w/o a permit. noted on 4th fl 1)altered electrical new(oem)boxes & wires pulled through w/long pig tails. 2)duct work new open ended in places & more material on floor. 3)large open bundle of studs on floo
Mar 1, 2018 · Penalty $1,600
Resolve - Class - 2
Failure to comply with the commissioner's order contained in nov #35096856y issued on 7/02/14 and to file a certificate of correction pursuant to 28-201.1,28-204.4 and 1rcny 102-01.noted:at roof level east elev
Oct 2, 2015 · Penalty $800
Resolve - Class - 2
Failure to comply with the commissioner's order contained in nov # 35096856y issued on 07/02/14 and to file a certificate of correction pursuant to 28-201.1, 28-204.4 and 1rcny 102-01. failure to maintain a
Jul 1, 2015 · Penalty $800
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35096856y issued on 7/2/14 pursuant to 28-204.4 & 1rcny 102-01. for failure to maintain bldg in cod
Dec 3, 2014 · Penalty $2,000
Resolve - Class - 2
Failure to comply w/ the commissioner's order to file a certificate ofcorrection w/ the dept. of bldg for notice of vio. # 35096856y issued on 07/02/14 pursuant to 28-204.4 & 1rcny 102-01. for : at roof level e
Nov 8, 2014 · Penalty $800
Resolve - Class - 1
Failure to maintain exterior bldg.north elevation exp 2 stone spallingeast elevation exp#3 brick water proofing rotted peeled off bldg landing on adj.bldg patio & sidewalk south elevation exp#4 deteriorated stu
Jul 3, 2014 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. noted: at roof level east elevation 15th fl,water proofing is in disrepair & separating from bldg & falling to street below. a pedestrian was struck & injuried
Jul 2, 2014 · Penalty $25,000
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Jul 1, 2014 · Penalty $4,000
Resolve - Class - 2
Sidewalk shed doesn't meet bldg code specifications. noted: shed erected at exp's 1,2, there is missing horizontal bracing securing each column to one another and columns at driveway on exp 2 are not protected
Nov 6, 2009 · Penalty $2,400
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 and the dob rules and regulations
Nov 21, 2008 · Penalty $800
Resolve - Hazardous
Failure to provide required means of egress for every fl noted front cellar level now converted to 3 retail rooms with bags sale and open to the public with no secondary means of egress
Dec 27, 2007 · Penalty $1,200
Resolve - Hazardous
Occupancy contrary to that allowed by the c of o 14558 illegal occupancy noted cellar storage now converted to illegal retail 3 rooms (bags business) for sale hanging bags from fl to ceiling on each wall of
Dec 27, 2007 · Penalty $2,000
Resolve - Non-hazardous
Failure to provide required means of egress for every fl. noted: cellar is converted into commercial space and occupied in that 3 retail stores are in cellar level & are open for public w/ out 2nd means of
Aug 22, 2007 · Penalty $480
Resolve - Non-hazardous
Occupancy contrary to that allowed by the c of o or bldg dept records-hazardous in that co#14558 indicates cellar is to be used as storage only and now exits 3 retail commercial stores which are open for
Aug 22, 2007 · Penalty $800
Resolve - Non-hazardous
Work w/o a permit-hazardous. work noted: erected full height partitions at cellar level to convert space in to 3 retail stores(bag's business) w/ out 1st obtaining all approval and permit from bldg dept
Aug 22, 2007 · Penalty $800
Resolve - Non-hazardous
50 fucton v.t. boiler, 10hp, nb54880, gas, 1998 50 high pressure boiler installed & in operation on an open fl install/construct a boiler room for code compliance
Aug 3, 2004 · Penalty $180
Active - Non-hazardous
50a 50b fucton v.t. boiler, 10hp, nb56982, gas 1989 50a high pressure boiler installed & in operation on an open fl install/construct a boiler room enclosure for code compliance 50b improper arrangement of blow
Aug 3, 2004 · Penalty $180
Resolve - Non-hazardous
50a 50b 50c fucton v.t. boiler, 15hp, nb57468, gas 1989 50a no structural support on flue pipe system. install a heavy duty hanger to the boiler room ceiling 50b blowdown valves leaking & improper valve arrange
Aug 3, 2004
Resolve - Non-hazardous
50a 50b 50c 50d fucton v.t. boiler, 15hp, nb59823, gas, 1990 50a no hanger on the flue pipe install hager to boilr room ceiling 50b improper arrangement of the blowdown valves 50c no slain line on the gauge gla
Aug 3, 2004 · Penalty $2,500
Active - Non-hazardous
50a 50b fucton v.t. boiler, 10hp, nb70885, gas, 1994 50a no structural support on the flue pipe system. install a heavy duty hanger to the boiler room ceiling 50b improper arrangement of the blowdown valves. in
Aug 3, 2004 · Penalty $180
Resolve - Non-hazardous
50a/50b fulto nv.t boiler 15hp nb50169 gas 1986 50a-no sturctual support on the flue pipe system install a heavy duty hanger to the boiler room ceiling 50b-no secondary shut off on the blowdown line install a c
Jul 28, 2004 · Penalty $180
Resolve - Non-hazardous
Failure to submit a fifth round tehcnical report periodic inspection or exterior walls and appurtenances as required by local law 11 of 1998 and the dept of bldg rules and regulations file the required report
Nov 28, 2003 · Penalty $1,750
Resolve - Hazardous
Failure to maintain exterior of bldg.wall stucco spalling at the roof level on the south.elev excessive motar joints missing and damaged on roof brick and stone turrets on the north and west elevations.window
Oct 24, 2003 · Penalty $800
Resolve - Non-hazardous
Failure to submit a fifth roung technical report periodic inspection of exterior walls and appurtenances as reqiured by local law 11 of 1998 and the dept of bldg rules and regulation file the required report to
Sep 24, 2003
Resolve - Non-hazardous
Failure to submit a fifth round technical report: periodic inspection of exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and regulations. remedy: file
May 9, 2003 · Penalty $700
Resolve - Non-hazardous
49a 49b. 49a no discharge pipe on safety valve. 49b excessive lint deposits in boiler room.
Jun 14, 2002 · Penalty $180
Active - Non-hazardous
30a, 49a, 49b, 49c. 30a water column drain line corroded 49a no discharge piping on safety valve 49b pressure gauge face glass broken. 49c boiler surroundings congested and dirty.
Jun 14, 2002 · Penalty $2,500
Active - Non-hazardous
49 no discharge pip on safety valve.
Jun 14, 2002 · Penalty $180
Active - Non-hazardous
49a 49b 48a 48b 49a no discharge pipe on the safety valve. 49b boiler and surrounding dirty and congested.
Jun 14, 2002
Resolve - Non-hazardous
18a, 18b, 49a, 49b. 49a- boiler andsurroundings dirty 18a,b- handholes corroded. 49b safety valve discharge too short and with shreaded end.
Jun 14, 2002 · Penalty $2,500
Active - Non-hazardous
11q,75b,50y,39h,74o,30o,27i, 11q-install light guard 75b-perform and file test 50y-seal machine 39h-regroove sheave 740-clean car top 30-clean hoistway 27i-replace damaged final bottom roller.
May 21, 1998 · Penalty $350
Resolve - Non-hazardous
22d,47h,50y,74h,30o,30i,75b, 22d-properly secure hatch 47h-replace rusted cable 50y-seal machine oil leak 74h-repair worn deflector sheave 30-clean hoistway 30i-patch holes in shaftway 75b-perform and file test
May 21, 1998 · Penalty $350
Resolve - Non-hazardous
18a
Mar 17, 1998
Resolve - Hazardous
3a,3b,18a,18b,
Jan 5, 1998 · Penalty $2,500
Active
Complaints
- Heating
Heat related
Jan 2, 2007 · Apt 2
Close - Heating
Heat related
Jan 2, 2007 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O6)
- Year built
- 1928
- Floors
- 14
- Residential units
- —
- Building area
- 56,700 ft²
- Lot area
- 3,703 ft²
- Zoning
- M1-5
- Community board
- 101
- Council district
- 1
- Block / lot
- 197 / 7
- Assessed value
- $4,993,650
- Landmark / historic district
- No
Questions about 101 Lafayette Street
Who owns 101 Lafayette Street?
The owner of record in NYC Department of City Planning PLUTO data is Kit Tzing Lee Kuan Realty.
Does 101 Lafayette Street have violations?
NYC HPD has no housing violations on record for this property.
Is 101 Lafayette Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 101 Lafayette Street built?
City records list 1928 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.