4 White Street
Manhattan, NY 10013BBL 1-00191-0011Map
Owner of record: 4-6 White LLC
4 White Street is an elevator apartment building built in 1903 in Manhattan, 10013. It has 11 residential units across 6 floors. The owner of record is 4-6 White LLC. HPD has recorded 104 housing violations here, most recently on September 21, 2026. 47 of the 50 most recent violations are still open.
- HPD violations
- 104
- DOB violations
- 39
- ECB violations
- 10
- HPD complaints
- 80
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 104
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 2b, 2nd story, 1st apartment from west at north
Sep 21, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at north located at apt 2b, 2nd story, 1st apartment from west at north
Sep 21, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd private hallway from east, the foyer , the bathroom located at apt 2b, 2nd story, 1st apartment from west at north
Sep 21, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective grout at floor tiles in the bathroom located at apt 2b, 2nd story, 1st apartment from west at north
Sep 21, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at shower stall in the bathroom located at apt 2b, 2nd story, 1st apartment from west at north
Sep 21, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 2b, 2nd story, 1st apartment from west at north
Sep 21, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration sheetrock and stud partition with door erected creating room with no window one partition wall from floor to ceiling other walls from floor to ceiling in the 2nd room from east located at apt 2b, 2nd story, 1st apartment from west at north
Sep 21, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the 3rd room from east located at apt 2b, 2nd story, 1st apartment from west at north
Sep 21, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 1st private hallway from east located at apt 2b, 2nd story, 1st apartment from west at north
Sep 21, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at east wall in the 1st private hallway from east located at apt 2b, 2nd story, 1st apartment from west at north
Sep 21, 2026 · Apt 2B
Open — Notice of issuance sent to tenant
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st private hallway from east located at apt 2b, 2nd story, 1st apartment from west at north
Sep 21, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). ceiling in the kitchen located at apt 2b, 2nd story, 1st apartment from west at north
Sep 21, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 3rd room from east located at apt 2b, 2nd story, 1st apartment from west at north
Sep 21, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st private hallway from east located at apt 2b, 2nd story, 1st apartment from west at north
Sep 21, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story
Apr 21, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story
Apr 21, 2026
Open — Nov sent out - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all story at building east wall at fire escape
Apr 21, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of bicycle at public hall, 2nd story
Apr 21, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kickstand a bulkhead door , 6th story
Jun 2, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door , 6th story
Jun 2, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of bicycles and household items at public hall stairs, 2nd story
Jun 2, 2025
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening sliding bolt with eye capable of being padlocked at west bulkhead door , 6th story
Jun 2, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items and construction material at bulkhead , 6th story
Jun 2, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of construction materials and a ladder at public hall stairs, 6th story
Jun 2, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door at public hall stairs, 6th story
Jun 2, 2025
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 6a, 6th story, 1st apartment from east at south
Apr 16, 2025 · Apt 6A
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 6a, 6th story, 1st apartment from east at south
Apr 16, 2025 · Apt 6A
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective glass at lower window sash 2nd window from south at west in the 3rd room from north at east located at apt 6a, 6th story, 1st apartment from east at south
Apr 16, 2025 · Apt 6A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north located at apt 6a, 6th story, 1st apartment from east at south
Apr 16, 2025 · Apt 6A
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2b, 2nd story, 1st apartment from west at north
Dec 17, 2024 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6a, 6th story, 1st apartment from east at south
Sep 21, 2024 · Apt 6A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective porcelain finish at bathtub in the bathroom located at apt 6a, 6th story, 1st apartment from east at south
Sep 21, 2024 · Apt 6A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6a, 6th story, 1st apartment from east at south
Sep 21, 2024 · Apt 6A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Sep 19, 2024 · Apt 6A
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Sep 19, 2024 · Apt 6A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall, south wall in the 1st room from east at south located at apt 6a, 6th story, 1st apartment from east at south
Aug 24, 2024 · Apt 6A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 1st room from east at south located at apt 6a, 6th story, 1st apartment from east at south
Aug 24, 2024 · Apt 6A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 2nd window frame from east at south wall in the 3rd room from east at south located at apt 6a, 6th story, 1st apartment from east at south
Aug 24, 2024 · Apt 6A
Open — Certification postponment granted - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchenette , the foyer , the bathroom located at apt 6a, 6th story, 1st apartment from east at south
Aug 24, 2024 · Apt 6A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall at public hall, 6th story
Aug 24, 2024
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant materials at west wall at public hall, 6th story
Aug 24, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall at public hall, 2nd story
Aug 24, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials the north wall at public hall, 3rd story
Aug 24, 2024
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 3rd room from east at north located at apt 6a, 6th story, 1st apartment from east at south
Aug 24, 2024 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 6a, 6th story, 1st apartment from east at south
Aug 24, 2024 · Apt 6A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st radiator from east at south wall, east wall, west wall in the private hallway located at apt 6a, 6th story, 1st apartment from east at south
Aug 24, 2024 · Apt 6A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, 1st door from north at east wall, 1st door frame from north at east wall in the 3rd room from east at south located at apt 6a, 6th story, 1st apartment from east at south
Aug 24, 2024 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at south located at apt 6a, 6th story, 1st apartment from east at south
Aug 24, 2024 · Apt 6A
Open — Nov sent out
DOB building violations · 39
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 26, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 1, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - active
Show 29 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 2, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 2018
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2017
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2016
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - active - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2016
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 24, 2015
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2012
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 5, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 5, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 3, 2003
Dob violation - resolved - Elevator elevatorrequired
1f1149
Jan 6, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 28, 1993
Dob violation - dismissed - Elevator elevatoroptional
1
Apr 7, 1992
Dob violation - dismissed - Elevator elevatoroptional
2
Oct 12, 1989
Dob violation - dismissed
ECB violations · 10
- Class - 1
Vf.. r t s... elevator in building out of service , upon inspection the device is found to be out of service . repair and restore to service immediately.. re inspection required..
Oct 31, 2025 · Penalty $6,250
Active - Class - 1
Class 1: upon inspection device still remains cease use from orders of commissioner. car needs to comply to cease use order and restore service to device. for lift of cease use please contact nyc d.o.b. elevato
Feb 20, 2025 · Penalty $3,155
Active - Class - 1
Return to service class 1 continued.
Jun 28, 2024 · Penalty $3,155
Active - Class - 1
Failure to maintain building in code compliant manner. upon inspection, the only device in the building is found to be out of service, creating a hazardous condition per 1rcny 11-02, and this device is erroneou
May 30, 2024 · Penalty $1,280
Active - Class - 1
Entire device/inoperative/restore to service.
Jan 16, 2024 · Penalty $6,250
Active - Class - 1
97x10 failure to maintain bldg in code compliant manner; service equipment elevator as per bc 3001.2 and 27-987. dob records show the only two elevators in bldg as active. upon inspection both devices are foun
Sep 15, 2016 · Penalty $5,000
Active - Class - 2
02m07,74m07,98bb07. 02m07-provide alarm bell; 74m07-missing bottom section of cwt rail guide,provide 98bb07.expired cat test tag on the governer rope clavis on top of a car.
Dec 23, 2013 · Penalty $2,500
Active - Class - 2
Work w.o permit. at 2 fl units 2a/2b full height partitions w/drywallscovering have been erected. creating bathrooms, rooms in loft spaces. at: south 2a accesoory closets,rooms, bathroom w/shower, electric, 4'
May 17, 2010 · Penalty $4,000
Active - Non-hazardous
75u, 73u,30o,54t,57o, 75-perform test tag device and file e.l.e.v 3 form 73-reshackle 54-city i.d numbers.
May 14, 1998
Resolve - Non-hazardous
75u,49r. 75 current 5 yrs test perform + file. 49 reshackle hoist rope
Mar 19, 1996
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Oct 10, 2026 · Apt BLDG
Open - Safety
Fire escape
Oct 10, 2026 · Apt BLDG
Open - Flooring/stairs
Floor
Oct 9, 2026 · Apt 3A
Open - Unsanitary condition
Pests
Oct 9, 2026 · Apt 3A
Open - Heat/hot water
Apartment only
Oct 9, 2026 · Apt 3A
Open - Door/window
Window frame
Oct 9, 2026 · Apt 3A
Open - General
Bell/buzzer/intercom
Oct 9, 2026 · Apt 3A
Open - Unsanitary condition
Pests
Oct 9, 2026 · Apt 3A
Open - Appliance
Electric/gas range
Oct 9, 2026 · Apt 3A
Open - Safety
Smoke detector
Oct 9, 2026 · Apt 3A
Open
Show 40 more ↓
- Unsanitary condition
Mold
Oct 9, 2026 · Apt 3A
Open - Electric
Wiring
Oct 9, 2026 · Apt 3A
Open - Paint/plaster
Wall
Oct 9, 2026 · Apt 3A
Open - Water leak
Slow leak
Oct 9, 2026 · Apt 3A
Open - Safety
Fire escape
Oct 9, 2026 · Apt 3A
Open - Safety
Sprinkler
Oct 9, 2026 · Apt 3A
Open - Plumbing
Toilet
Oct 9, 2026 · Apt 3A
Open - Paint/plaster
Ceiling
Sep 23, 2026 · Apt 6A
Open - Unsanitary condition
Mold
Sep 23, 2026 · Apt 6A
Open - Door/window
Window pane
Sep 23, 2026 · Apt 6A
Open - Plumbing
Bathtub/shower
Sep 19, 2026 · Apt 2B
Close - Plumbing
Radiator
Sep 19, 2026 · Apt 2B
Close - Unsanitary condition
Mold
Sep 19, 2026 · Apt 2B
Close - Door/window
Door
Sep 19, 2026 · Apt 2B
Close - Plumbing
Steam pipe/riser
Sep 19, 2026 · Apt 2B
Close - Flooring/stairs
Floor
Sep 19, 2026 · Apt 2B
Close - Paint/plaster
Radiator
Sep 16, 2026 · Apt 2B
Close - Paint/plaster
Window/frame
Sep 16, 2026 · Apt 2B
Close - Paint/plaster
Wall
Sep 16, 2026 · Apt 2B
Close - Paint/plaster
Wall
Jun 9, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Safety
Fire escape
Apr 20, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 20, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Nov 15, 2025 · Apt 6B
Open - Paint/plaster
Ceiling
Apr 14, 2025 · Apt 6A
Close - Water leak
Damp spot
Apr 14, 2025 · Apt 6A
Close - Plumbing
Water supply
Mar 16, 2025 · Apt 6B
Close - Safety
Window guard broken/missing
Sep 16, 2024 · Apt 6A
Close - Unsanitary condition
Pests
Sep 16, 2024 · Apt 6A
Close - Unsanitary condition
Pests
Sep 16, 2024 · Apt 6A
Close - Paint/plaster
Ceiling
Aug 22, 2024 · Apt 6A
Close - Paint/plaster
Radiator
Aug 22, 2024 · Apt 6A
Close - Paint/plaster
Radiator
Jul 18, 2024 · Apt 6A
Close - Paint/plaster
Radiator
Jul 1, 2024 · Apt 6A
Close - Unsanitary condition
Mold
Jan 29, 2024 · Apt 6B
Close - Door/window
Window frame
Nov 10, 2023 · Apt 4A
Close - Flooring/stairs
Floor
Nov 9, 2023 · Apt 3B
Close - Unsanitary condition
Pests
Nov 9, 2023 · Apt 3B
Close - Door/window
Window frame
Nov 9, 2023 · Apt 3B
Close - Door/window
Window pane
Nov 9, 2023 · Apt 3B
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Feb 9, 2026 | $5,900,000 | Rentals - elevator apartments | 12 |
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1903
- Floors
- 6
- Residential units
- 11
- Building area
- 19,920 ft²
- Lot area
- 3,500 ft²
- Zoning
- C6-2A
- Community board
- 101
- Council district
- 1
- Block / lot
- 191 / 11
- Assessed value
- $1,472,850
- Landmark / historic district
- Tribeca East Historic District
HPD registration #141649, last renewed Jul 10, 2026.
Questions about 4 White Street
Who owns 4 White Street?
The owner of record in NYC Department of City Planning PLUTO data is 4-6 White LLC.
Does 4 White Street have violations?
Yes. NYC HPD has recorded 104 housing violations at this property.
Is 4 White Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 4 White Street built?
City records list 1903 as the year it was built.
How many apartments are in 4 White Street?
It has 11 residential units and 12 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.